The Specifications Describe The Construction Work To Be Carried Out For The Sewage Pressure Pipeline Measure From Plettenberg Ot Pasel To Ot Siesel. They Include The Construction Of: A Sewage Pressure Pipeline From Plettenberg-Pasel To Plettenberg-Siesel With A Total Length Of Approx. 1,500 M In Pe100rc 125X7.4 Sdr17 With Laying Of 3 Compressed Air Lines For Ventilation Of The Adl In Pe100 25X2.3 Sdr11 (In The Protective Pipe Pe100rc 75X4.5 Sdr17), As Well As Laying A Drinking Water Pipe Pe100rc 125X11.4 Sdr11 And Cable Protection Pipe Pe100rc 50X4.6 Sdr11, As Well As Another Empty Pipe Pe100rc 125X7.4 Sdr17 Culvert Of The Len Ne In 2 Places (Overall Length Approx . 200M) As Well As Going Under A High-Voltage Line (Length Approx. 12M) And Nature Reserves (Total Approx. 200M). Enclosed Construction Using Hdd Methods (A Total Of 15 Individual Bores Of Different Diameters) With Protective Piping And Including Media Pipe Installation Functions (Different Designs And Fittings) With An Average Floor Depth Of Approx. 2.0 M, Including Fittings, And 1 Pressure Relief Shaft Connection Of The Adl To The Waste Water Lifting Plant, And The Compressed Air Lines To The Compressor (In The Building Of The Waste Water Lifting Plant) In Plettenberg-Pasel And To The Existing Gravity Sewer System In Plettenberg-Siesel , Incl. Commissioning Of The Adl And The Compressed Air Lines (Commissioning By The System Manufacturer) Construction Of A Water Passage As A Frame Profile Wxh1.6Mx1.2M For A Crossing Water Body On A Slope In An Open Construction Demolition And Decommissioning Of Existing Lines Pe Dn65 With A Total Length Of Approx Approx. 3M And The Subsequent Restoration Of All Surfaces And Service Roads Found
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.