Lease Of Tents, Including Assembly And Disassembly, With The Following Minimum Characteristics: Fire-Dipped Galvanized Iron Structure, With Ground Fixing System (Ratchet Tape), With Ceiling Height Of At Least 3 Meters In Height And 6 Meters At Its Central End, Covered In White Canvas, Anti-Flame, Anti-Mildew And Anti-Uv; Closure On The Sides, Following The Request In The Form Of Services Provided; The Company Must Provide A Technician In Charge To Monitor The Assembly Of The Structure And Provide A Legal Document Of Technical Responsibility, Duly Registered With The Relevant Class Council, For Covering And Installing The Tent On The Day Of Assembly. The Tent Must Be In Good Condition And In A Perfect State Of Cleanliness. The Contractor Is Not Responsible For Damage Caused By Third Parties And Bad Weather. Quantities Per Size: 8 Tents 5Mx5m; 23 Tents 10Mx10m. The Services Will Be Provided As Follows: 01 Tent 5Mx5m, Assembled Until 18:00 On 10/03/2023, For Use On 10/06 And 10/07/2023; With Closing On The Sides Totaling 20 Linear Meters; 16 Tents 10Mx10m, Set Up Until 6 Pm On 10/03/2023, For Use On 10/08/2023; With Closing On The Sides Totaling Approximately 185 Linear Meters; 07 Tents 10Mx10m, Set Up Until 18:00 On 11/07/2023, For Use On 11/12/2023; 06 Tents 5Mx5m, For Use On 11/12/2023; With Closing On The Sides Totaling Approximately 75 Linear Meters. 01 Tent 5Mx5m, Set Up Until 18:00 On 12/29/2023, For Use On 12/31/2023; With Closure On The Sides Totaling 20 Linear Meters., Rental Of 34 Daily Chemical Toilets, Duly Identified, Male And Female, Containing The Following Minimum Characteristics: Bathrooms Must Be In Perfect Conditions Of Use, Have A Seat, Non-Slip Floor, Mirror , Free/Occupied Lock System, Measuring At Least 1.20Mx1.10M By 2.00M In Height; With A Minimum Capacity Of 200 Liters Of Waste. Maintenance Assistance During Events: With Person Duly Qualified For Hygienization, Deodorization, Suction And Material For Use (Toilet Paper And Others), Which Should Be Done At Intervals Of 02 Hours. The Contracting Party Is Not Responsible For Damages Caused By Third Parties And Bad Weather. On The Days Mentioned Above, The Bathrooms Must Be Installed In Locations To Be Defined By The Contracting Party And Made Available For Use From 9:00 Am Each Day, And Must Be In Perfect Conditions Of Use For 24 Hours. Form: Days 06, 10/07/2023, 08 Days In Tup ssi Central Square. Day 10/08/2023, 6 Days In The Structure Of The Matriz Church. .Day 12/31/2023, 10 Days At Tup ssi Central Square., Hiring A Company Specialized In The Field Of Professional Security With A Brigade Certificate And/Or Cnv (National Security Guard Card), Duly Registered With The Federal Police, Which Has Professionals In The Area Of Security, Trained To Carry Out Security Activities With Efficiency And Perfection, Who Must Impose Themselves To Prevent Possible Attitudes Of Disorder, Maintaining Tranquility In The Venues Of Events. If Necessary, A Pair Of Security Guards Must Escort The Money Bag To The Central Safe At Least Once During The Event. The Security Guards Must Perform The Function Without Weapons, Being In Appropriate Uniform.