GTR 68960266

Quotation Are Invited For Hp/Mp Control Valve Pr Tube Replacement Work

NCB — National Competitive Bid Closed Asia
Tender Information
GTR Reference
68960266
Tendering Authority
Subscribe to view
Tender No
2412301070
Financer Name
Self-Funded
Work Title
Quotation Are Invited For Hp/Mp Control Valve Pr Tube Replacement Work
Bid Type
NCB — National Competitive Bid
Country
Subscribe to view
Geographical Region
Asia
Political Region
Arab World,Gulf Cooperation Council GCC,Middle East,Middle East and North Africa MENA
Last Date of Bid Submission
24-08-2023 Closed
Work Detail
Quotation Are Invited For Hp/Mp Control Valve Pr Tube Replacement Work Hp/Mp Control Valve Pr Tube R 1032301754Rfx Description Hp/Mp Control Valve Pr Tube Replacement Work For More Information Contact Mr. Kaliyamoorthiv 043226919 052 9126916 Kaliyamoorthiv@ Dewa.Gov.Ae 1 Item-00001 Technical And General Specifications, Outsourcing Work K Station Phase Ii, Jebel Ali Name Of Work: Scope Of Work For Hp/Mp Pcv P R Tube Replacement (Valve Inlet Size Dn8# & Outlet Dn 12#) Duration Of Work: 4 Days (Tentative Period Of Work # After Awarding The Po To First Quarter Of 2024) Notice Period # 1 Day Scope Of Work: ·#The Contractor Shall Visit The Site And Make Himself Fully Familiar With The Work Scope, Plant Access, Facilities, Complexities, Safety Measures, Erection Procedures, Number Of Welds Etc., Be Fore He Submits His Bid. ·#Party Shall Submit Itp Along With Wps, Lifting Plan And Erection Plan After Getting Po And Before Commenc Ing Of Work. ·#To Get A Ptw, Hwp Contractor Has To Submit Risk Assessment Forms And Method Statement Prior To Start The Work. ·#Check Condition Suitable To Carry Out Work. Conduct Site Survey And Safety Inspection To Assess The Working Environment. ·#A Safety Meet Ing Will Be Held To Evaluate The Risk Involved In Methods To Be Used. Risk Assessment And Toolbox Talk To Be Given To The Employees. ·#Party Shall Mobilize The Labor, Equipment, Tools, Etc. Immediately After Dewa Notification. Party Shall Ready To Start The Work W Ith Three-Days Advance Notification. ·#All Lifting And Power Tools Shall Be Tested And Test Certificate To Be Provided To Dewa. ·#Pa Rty Shall Verify That Scaffolds Are Safe To Work And Valid Scaffolding Tags Are Provided Before Using Any Scaffolding (Scaffolding B Y Dewa). ·#Inspect The Existing Inner, Middle And Outer Pr Tubes Including End Plate And Compare The Measurements With Newly Provide D Pr Tubes. ·#Cut And Remove 2# De-Super Heater Spray Water Line ( F22 Material) ·#Cut And Remove 12# Valve Body Outlet ( Material F 22) ·#After Verification Of Existing Pr Tube Dimensions With Newly Provided Pr Tubes, Remove The Existing Inner, Outer Pr Tubes Incl Uding End Plate Without Damaging The Valve Body Surface. ·#Fit Up The Joint Between New Inner Pr Tube And New End Plate. ·#After Dew A & Oem Clearance, Welding Of Inner Pr Tube With End Plate Joint As Per Approved Wps. ·#Fit Up The Joint Between New Outer Pr Tube A Nd New End Plate. ·#After Dewa & Oem Clearance, Welding Of Outer Pr Tube With End Plate Joint As Per Approved Wps. ·#Ndt And Pwht Of Inner Pr Tube To End Plate Joint. ·#Surfac Preparation Of Valve Body For Inner And Outer Pr Tube Joints. ·#In Case Of Dimensional Variations Due To Erosion Of Valve Body Surface, The Same Shall Be Rectified By The Contractor. (Fill Up/Buttering To Acquire The De Sired Dimensions) ·#Upon Surface Finishing Of Both Pr Tube And Valve Body, Fit Up The Joint Between Outer Pr Tube And Valve Body. Ch Eck The Guide Length And Clearance Of Pr Tube Inside The End Plate. ·#After Dewa Clearance, Welding Of Pr Tube To Valve Body Joint A S Per Approved Wps. ·#Ndt Of Completed Welding Joint Followed By Pwht ·#Valve Body Outer Surface Finish, Fit Up Valve Body Outer Joi Nt. Joint Fit Up Shall Witness By Dewa. ·#Upon Dewa Approval, Welding Of Valve Body Outer As Per Approved Wps. ·#Ndt Of Completed We Lding Joint Followed By Pwht ·#Spray Water Line Surface Finish, Fit Up Spray Water Line Weld Joint. Fit Up Shall Witness By Dewa ·#U Pon Dewa Approval, Welding Of Spray Water Line As Per Approved Wps. ·#Ndt Of Completed Welding Joint Followed By Pwht. ·#Any Insulat Ion/Cladding Sheet Removal And Re Fixing If Required During The Replacement, Same Shall Be Under Contractor Scope. ·#After Completio N Of Above Scope Of Work, Joint Inspection With Dewa Engineer. ·#After Final Clearance From Dewa, Install Back Insulation Clamps, In Sulation And Cladding Sheets. ·#Removal Of All Metal Scraps, Temporary Supports And Any Other Scraps From Work Place And Disposal As Per Dewa Engineer Instruction. ·#Housekeeping # Work Place And Downside Areas. ·#De-Mobilization And Site Clearance. ·#Submission O F Detailed Work Completion Report 1 Ls Standard Terms & Conditions 1) Prices Should Be Ddp Delivery Duty Paid At Dewa Stores. 2) Quotation To Be Submitted Only In Local Currency U.A.E Dirhams 3) Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material 4) No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company, And Your Participation In Dewa Tenders / Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest. Supplier Registration: Https://Srm.Dewa.Gov.Ae/Irj/Portal/Anonymous/Regis Tender Link : Https://Www.Dewa.Gov.Ae/Api/Rfxdownload/Get/2412301070
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
da39596a-f504-455a-875d-924accdedfd0.pdf
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders