Exchange Of Ac450 System. Esem Currently Has 6 Ac450 Systems And In Order To Secure Operation And Future Production, The Replacement Of These Must Begin In 2024. Scope Of This Contract During 2024, Two Ac450 Systems, Named 16.7 And 16.9, Which Control The Main Boiler Kvv, Are To Be Replaced. From These Two Ac450 Systems, The Af100 Network Is Built Up To S800io Slave Nodes. Even These Networks Are About To Become Obsolete And Must Therefore Be Upgraded To A Profinet-Based Network.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.