GTR 68442522
Tenders Are Invited For Construction Of A Side Road From Ul. Gostyńska To No. 133 In Orzesze-Zgoń
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
68442522
Tendering Authority
Subscribe to view
Tender No
WRZP.271.10.2023
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction Of A Side Road From Ul. Gostyńska To No. 133 In Orzesze-Zgoń
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
24-08-2023
Closed
Work Detail
Construction Of The Road Along The Length Of 244.0 Running Meters With A Turning Area And Construction Of A 12-Meter Long Exit To The Poviat Road At Ul. Gostyńska. A Road With A Macadam Surface. Preparatory Works: Measuring Works In A Flat Area At A Length Of 256 M. Tree Felling In Accordance With The Decision Bs.613.1.44.2023.Lw Of June 21, 2023, Together With Stump Removal And Transport And Disposal Of Wood. Payment To The Employer Of The Invoice For The Harvested Wood In The Amount Specified In The Appraisal Report In The Amount Of: Pln 1730.01 Gross. Culvert From Pipes With A Diameter Of 600Mm Pvc Or Pp Sn8 With A Length Of 8M And The Construction Of Prefabricated Front Walls. Gostyńska Include The Removal Of A Layer Of Fertile Soil With A Bulldozer, Gr. 15Cm In The Amount Of Approx. 134 M2 With The Transport Of Spoil From Topsoil Removal. Earthworks With Excavators Related To The Excavation For The Construction Of The Exit In The Amount Of Approx. 67 M3 With The Removal Of Excavated Material (...) The Contractor Is Obliged To Obtain A Permit To Occupy The Right-Of-Way Of The Poviat Road At Ul. Gostyńska In Order To Make The Exit To The Poviat Road, And The Costs Of The Above-Mentioned Occupation Of The Lane Will Be Taken Into Account From The Offer Price Calculation. Road Substrate And Surface Works Related To The Construction Of A Side Road From Ul. Gostyńska To No. 133 Include The Removal Of A Layer Of Fertile Soil With A Bulldozer, Gr. 15 Cm In The Amount Of Approx. 1341 M2 With The Transport Of Spoil From Topsoil Removal.(…) Finishing Worksfinishing Works Include The Execution Of Gravel Shoulders And Topsoiling Of Slopes With Sowing Grass In The Amount Of 300 M2. Scope Of The Order: 1. Perform Construction Works In Accordance With The Design Documentation, Bill Of Quantities, Sstwior And Design Documentation Of The Exit To Ul. Gostyńska(…)2. In The Event Of Damage To The Existing Road Surface Outside The Works Area, The Above-Mentioned The Surface Should Be Restored To Its Original Condition 3. Organize The Works In A Way That Ensures Residents Access And Access To The Property From 4:00 P.M. To 8:00 A.M., As Well As The Use Of Water, Sewage, Electricity And Means Of Communication4. When Calculating The Offer Price, Take Into Account The Possible Costs Of Industry Supervision And Securing The Utilities Network5. After The Felling Of Trees, The Contractor Is Obliged To Pay The Ordering Party An Invoice For The Harvested Wood (...)6. In The Place Where There Is An Existing Underground Utilities Network, Be Especially Careful When Performing Construction Works. Any Rapprochement Should Be Agreed With The Operators Of The Network7. Mark The Performed Works (…)8. Allow Access By Emergency Vehicle If Necessary9. Notify The Road Manager - The Mayor Of The City Of Orzesze, The Poviat Road Administration In Mikołów (...) And The Poviat Police Headquarters In Mikołów And Residents Of The Date Of Introducing Traffic Restrictions For The Duration Of The Works 7 Days Before The Date Of Its Introduction10. Handover Of The Front Of The Works Will Take Place After Receiving The Marking (...)11. Notify The Road Manager - The Mayor Of Orzesze About The Date Of Introducing The Target Traffic Organization 7 Days Before The Date Of Its Introduction12. On The Day Of Final Acceptance, The Contractor Shall Submit To The Employer An Acceptance Report For The Exit At Ul. Gostyńska Signed By Representatives Of Pzd In Mikołów13. The Contractor Shall Ensure The Preparation Of The As-Built Inventory Of The Road Under Construction, And Its Performance Will Be Included In The Calculation Of The Tender Price.14. The Contractor Is Obliged To Notify The Poviat Building Supervision Inspector In Mikołów About The Date Of Commencement Of Works And To Notify The Completion Of Construction In Accordance With Art. 57 Of The Construction Law.15. In The Notice Of Completion Of The Works, The Contractor Shall Submit To The Employer All Certificates And Tests As Well As A Certificate Issued By The Poviat Building Supervision Inspector On The Lack Of Grounds For Raising Objections To The Submitted Notice Of Completion Of The Construction.16. After The Works Are Completed, Remove The Markings For The Duration Of The Works And Tidy Up The Work Area1.3. A Detailed Description Of The Subject Of The Order Is The Design Documentation And The Technical Specification For The Execution And Acceptance Of Works (Appendix No. 4 To The Swz). 1.4. The Employer Allows The Use Of Materials Other Than Those Used In The Design, Equivalent, With Appropriate Technical And Quality Parameters. Technical And Quality Parameters For The Materials Used In The Technical Documentation Are Minimum Values.1.5. Contractors May Submit Offers Containing Solutions Equivalent To The Subject Of The Contract Presented In The Tor. 1.6. When Describing The Subject Of The Contract By Reference To Standards, European Technical Assessments, Approvals, Technical Specifications And Technical Reference Systems, The Employer Allows Solutions Equivalent To Those Described. Where In The Design Documentation, Technical Specification For The Execution And Acceptance Of Works Or Other Procurement Documents, A Trademark (Brand), Manufacturer, Supplier, Patent, Origin, Source Or Specific Process That Characterizes The Products Or Services Provided By A Specific Contractor Has Been Indicated, Or Standards, European Technical Assessments, Common Technical Specifications Or Other References Referred To In Article 101 Section 1 Item 2 Or Section 3 Of The Act, The Ordering Party In Accordance With Art. 99 Sec. 5 Of The Act Allows The Submission Of An Equivalent Offer Or Pursuant To Art. 101 Sec. 4 Of The Act, Offering Equivalent Solutions To Those Indicated In The Documentation, Provided That They Ensure The Achievement Of Technical Parameters Not Worse Than Those Assumed In The Documentation And Are Consistent In Terms Of: A) Dimensions And Construction (Size, Type, Physical Properties, Number Of Components) B) Functional Character (Identity Of Function), C) Material Characteristics (Type And Quality Of Materials), D) Technical Parameters (Strength, Durability, Technical Data, Hydraulic Data, Linear Characteristics, Construction), E) Safety Parameters Of Use, F) Emission Standards, The Contractor, At Each Request Of The Ordering Party During The Performance Of The Contract, Is Obliged To Present Safety Signs, Declarations Of Conformity Or Technical Approval Or A Certificate Of Conformity With The Polish Standard Transposing European Standards Or The Standard Of The Member States Of The European Economic Area Transposing This Standard Or Polish A Standard In The Absence Of A Polish Standard Transposing European Standards (Or An Equivalent Standard). Whenever Polish Standards Are Mentioned In The Technical Specification For The Execution And Acceptance Of Works, Technical Documentation Should Be Understood As Polish Standards Transposing European Standards Or Standards Of Other Member States Of The European Economic Area Or Other Standards Or Equivalent Documents Referred To In Art. 101 Sec. 1 Point 2 Of The Act.1.7. The Economic Operator Who Refers To Solutions Equivalent To Those Described By The Contracting Authority Is Obliged To Demonstrate That The Supplies, Services Or Works Offered By It Meet The Requirements Specified By The Contracting Authority And To Submit Technical Data Sheets Or Other Documents Confirming That The Offered Solutions Meet The Requirements Of The Contracting Authority. Of The Ordering Party Described In The Subject Of The Order. Equivalence In Terms Of Technical, Operational And Operational Parameters Is To Ensure, In Particular, The Achievement Of Technical Parameters Not Worse Than Those Assumed In This Tor. If The Contractor Fails To Submit The Above Documents Or Submitted Documents Will Be Incomplete (By Not Confirming In This Way The Equivalence Of The Offer In The Scope Described In The Description Of The Subject Of The Contract, The Ordering Party Will Not Call For Their Submission/Supplementation).1.8. Warranty Conditions 60-Month Warranty For All Works Performed As Part Of The Subject Of The Contract And The Materials And Devices Used, Counting From The Date Of The Final Acceptance Report Of The Works Without Any Significant Defects Of The Subject Of Acceptance. The Ordering Party Requires That The Warranty Period Is Equal To The Period Of The Guarantee Provided By The Contractor.1.9. Cpv Codes 45233142-6 1.10. The Design Documentation Provides Solutions That Allow The Use Of The Subject Of The Contract By All Users, Including The Disabled.1.11. The Contractor, Subcontractor, Further Subcontractor Performing Activities Related To The Performance Of The Contract Is Obliged To Employ People Under An Employment Contract, I.E. People Performing Activities Under This Contract, Where The Performance Of These Activities Consists In Performing Work In The Manner Specified In Art. 22 § 1 Of The Act Of June 26, 1974, The Labor Code (Consolidated Text: Journal Of Laws Of 2020, Item 1320). The Contractor Is Obliged To Ensure That Subcontractors And Further Subcontractors Also Meet All The Requirements For Persons Employed Under The Contract About A Job. The Requirement Of Employment Under An Employment Contract Applies To Persons Who Perform Activities Directly Related To The Performance Of Works, I.E. Workers Performing Works Related To The Construction And Surface Of The Road. Thus, The Requirement Does Not Apply To, Among Others, Persons: Construction Managers, Transport Services, Geodetic Services, Suppliers Of Building Materials, Equipment, Devices, Natural Persons Conducting Business Activity, Incumbent Members Of The Contractors Management Or Supervisory Bodies, Partners In A General Partnership Or Partnership To The Extent That They Will Personally Perform Works For The Employer Or The Contractor. Of The Contractors Employment Requirements, Sanctions For Failure To Meet These Requirements Are Described In The Draft Provisions Of The Contract (...) 1.12. 131 Sec. 2 Of The Act.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
b4249fec-fb95-45e6-9e46-971ec413b3f2.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.