GTR 68442404

Tenders Are Invited For Renovation Of The Municipal Road No. 190515C In Smólsk, Length 900 M, Section From 0+012 To 0+912 In The Włocławek Commune

ICB — International Competitive Bid Closed Central Europe
Tender Information
GTR Reference
68442404
Tendering Authority
Subscribe to view
Tender No
RBRiGK.271.2.08.2023
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Renovation Of The Municipal Road No. 190515C In Smólsk, Length 900 M, Section From 0+012 To 0+912 In The Włocławek Commune
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
23-08-2023 Closed
Work Detail
1. Subject Of The Contract:1.1. The Subject Of The Contract Under The Procedure In Question Is A Construction Work Consisting In The Renovation Of The Municipal Road No. 190515C Smólsk, Length 900M, Width 3.5M From Km 0+012 To Km0+912 In The Town Of Smólsk.1.2. The Renovation Consists In Laying: - On The Wearing And Binding Roadway Made Of Asphalt Concrete, Thickness 3 Cm Each, - On Individual Exits Of The Wearing Course And Binding Layer Made Of Asphalt Concrete, Thick. 3 Cm Each (1.0 M Long In Order To Be Attached To The Road) On A Gravel Foundation, - Shoulders Made Of A Hard Crushed Stone Mix, Thick. 15 Cm, - Correction Of Slopes Of The Existing Ditches Along With Their Leveling, - Replacement Of The Old Vertical Marking.1.3. Surface Of Hardening: - Bituminous Roadway 3298.8 M2 - Individual Bituminous Exits 168.5 M2 - Gravel Shoulders 900.0 M21.4. The Scope Of Works Included In The Cost Estimate Includes: 1) Preparatory Works - Demolition Of The Crushed Stone Surface, Repair Of Defects From The Crushed Stone 2.9 M3, 2) Earthworks - Trenching For The Needs Of A Fragment Of The Road And Individual Exits Along With Shoulders. The Output In The Amount Of 187.7 M3 For Export. Clearing The Ditches Of Silt With Profiling The Bottom And Slopes. 344.0 M2,3) Laying A Cut-Off Layer Made Of Sand, 15 Cm Thick, For The Purposes Of Exits 185.4 M2 And A Fragment Of The Roadway 93.8 M2,4) Laying The Foundation On A Fragment Of The Roadway 93.8 M2 And Exits 185.4 M2 About Thick 20 Cm From The Crushed Stone Mixture, 5) Mechanical Cleaning And Sprinkling Of The Asphalt Base With Asphalt Emulsion For The Needs Of The Binding Layer, 6) Laying The Binding Layer With Concrete. Asphalt Ac 11W50/70 Thick. 3Cm On The Roadway 3387.8 M 2 And Exits 176.9 M 2 . 7) Sprinkling The Substrate With Asphalt Emulsion And Making The Wearing Layer On The Concrete Roadway. Asphalt Ac8s 50/70 Thick. 3 Cm - Roadway 3298.8 M 2, Exits 168.5 M 2.8) Hardening Of The Shoulders Made Of Hard Crushed Stone 0.5 Cm Wide, Thick. 15 Cm Per Area 900 M 2 .9) Roadside Leveling On 900 Areas. M 2 , 10) Arrangement Of Vertical Signs, Type S - 1 Piece And Type M - 4 Pieces, 11) Stocktaking. During The Works, Special Attention Should Be Paid To Utilities Placed In The Right-Of-Way. The Employer Informs That A Detailed Description Of The Subject Of The Contract Is Included In The Design Documentation, Constituting Appendix No. 1 To The Tor And Draft Provisions Of The Agreement, Constituting Appendix No. 3 To The Tor.2. Equivalent Solutions: A Contractor Who Refers To Equivalent Solutions Is Obliged To Demonstrate That The Solution He Offers Meets The Requirements Specified By The Contracting Authority. In This Case, The Contractor Shall Attach To The Offer A List Of Equivalent Solutions Together With Its Description Or Standards. If The Contractor Proposes Equivalent Solutions, Including Materials, Devices And Other Elements, He Is Obliged To Prepare And Attach To The Offer A List Of All Proposed Equivalent Solutions (E.G. Materials, Devices And Other Equivalent Elements) And Demonstrate Their Equivalence To The Solutions ( E.G. Material, Device And Other Element) Described In The Technical Documentation, With An Indication Of The Name, Page And Item In The Technical Documentation To Which It Applies. Parameters And Decide Whether The Proposed Solutions Are Equivalent. This Means That The Contractor Is Obliged To Prove That The Solutions He Offers (E.G. Materials, Devices And Other Elements) Are Equivalent To Those Described By The Employer. The Use Of Equivalent Solutions Should Be Indicated In The Tender, Regardless Of Whether The Contracting Authority Requests The Contractor To Submit The Evidence In Question. In The Event That The Contractor Does Not Submit Documents In The Offer About The Use Of Other Equivalent Materials Or Devices Or Solutions, It Is Understood That The Calculation Of The Price Of The Offer And The Execution Of The Subject Of The Contract Includes The Materials And Devices Proposed In The Technical Documentation; Therefore, The Contractor Is Obliged To Use The Materials Or Devices Or Solutions Proposed In The Technical Documentation To Perform The Contract. Requirement Of Employment Under An Employment Contract: 3. Requirements For Employing Persons By The Contractor Or Subcontractor On The Basis Of An Employment Relationship.3.1. The Ordering Party Requires The Contractor Or Subcontractor To Employ Persons Performing The Following Activities In The Scope Of Order Performance On The Basis Of An Employment Relationship. The Ordering Party, Pursuant To Art. 95 Section 1 Of The Public Procurement Law, Requires Employment By The Contractor On The Basis Of An Employment Relationship Within The Meaning Of The Act Of June 26, 1974. Labor Code (Journal Of Laws Of 2020, Item 1320, Of 2021, Item 1162). 3.1.1. Type Of Activities Necessary For The Performance Of The Contract, Which Are Subject To The Requirements Of Employment By The Contractor Or Subcontractor On The Basis Of An Employment Relationship, Of Persons Performing Activities During The Contract Performance Indicated In Particular In The Bill Of Quantities (Concerning, Among Others: Road Surface, Foundation), With Excluding Activities Performed By Persons Performing Independent Technical Functions In The Construction Industry, Such As: Managing Construction Works, Construction Management, Construction Site Service, Documenting The Construction Process, Organizing Work On The Construction Site, Supervision Over The Implementation Of Construction Works, And Excluding Activities Related To Construction Service, Such As Such As: Geodetic Service, Administrative Service. At The Latest On The Date Of Signing The Contract, The Contractor Shall Document To The Contracting Authority The Fact Of Employing Persons Involved In The Performance Of Activities Indicated In The Tor (Point 3.1) On The Basis Of An Employment Contract. Information On The Obligation Of The Contractor To Personally Perform Key Parts Of The Order.4. The Contracting Authority Reserves The Obligation To Personally Perform The Key Part Of The Contract By The Contractor: 1) Road Base, 2) Road Surface.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
a28cdf42-fe9d-48b9-985b-ef46511646e1.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders