GTR 68285726
Tenders Are Invited For Renovation Of Building No. 28 In The Military Complex At Ul. Hallera 62 In Grudziądz - Case No. 73/2023
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
68285726
Tendering Authority
Subscribe to view
Tender No
73/2023
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Renovation Of Building No. 28 In The Military Complex At Ul. Hallera 62 In Grudziądz - Case No. 73/2023
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
28-08-2023
Closed
Work Detail
The Subject Of The Contract Is The Renovation Of Building No. 28 In The Military Complex At Ul. Hallera 62 In Grudziądz, In Accordance With The Requirements Set Out In The Contract And A Detailed Description Of The Subject Of The Contract And Its Scope Contained In The Technical Specification For The Execution And Acceptance Of Works (Stwiorb) And Design Documentation Including The Bill Of Quantities. Works In Consultation With The Supervision Inspector Indicated In The Contract. Scope Of The Contract: ► Construction Works: - Construction Of A 4.0 M Wide Access Road Made Of 15X17 Granite Paving Stones; /M3 Or Other Dispersed Reinforcement Or Mesh; - Replacement Of Window Joinery With Aluminum Joinery Of Identical Dimensions, Grey, Hinged, Ei Resistance Class In Accordance With The Architectural Drawing, U=1.4 {W/(M2*K)}, On Glass Blue Foil, Except For The Storage Room; - Renovation Of External Gratings, Straightening, Filling In Gaps, Sandblasting, Painting With Oil Paint In Gray. Completion, Execution Of Two Grilles Identical To Those In The Neighboring Windows; - Dismantling And Making 1 To 1 Of A New Entrance Gate. Wooden Construction, Covered With Sheet Metal. Closing System, Hinges Identical To The Current State. Brown Paint For Wood And Metal. Settling On Refreshed Hinges; - Demolition Of The Existing Floor, 18 Cm Thick; - Demolition Of A Fragment Of The Wall; - Enlargement And Relocation Of The Door Opening In The Storage Room. Existing Door 80 Increased By 90 Cm; - Execution Of A New Footing; - Removal Of Loose Plaster On The Internal Walls; - Painting Of The Fobos M4 Wooden Structure, Boarding, Rafters And Purlins; - Execution Of Mineral Wool Insulation Λ=0.34, 10 Cm Thick In Space Between The Rafters And 5.0 Cm Below The Rafters; - Laying The Vapor Barrier Foil; - Laying The R15 Insulation In The Form Of Boards On The Rack Or Promaxon Gr. 8Mm Or 2X Rigips 4Pro Fire Th. 12.5 Mm; - Construction Of A Reinforced Concrete Wall, 30 Cm Thick, Made Of C25/30 Concrete, Traditionally Reinforced With Aiiin Steel And Polypropylene Fiber Reinforcement; - Cleaning The Unused Attic From Everything That Is Left On It, In Terms Of Rooms Where There Is A Change Of Use, To Layers Of Alloy Concrete; - Impregnation Of The Wooden Structure Of The Ceiling / Poles, Saddles, Swords With Promadur® Impregnation With A Density Of 468 (G/M2), Or Enclosing These Elements With Promaxon Boards, Thickness. 8Mm Or 2X Rigips 4Pro Fire Th. 12.5Mm; - Execution Of A New Electrostatic Floor On A New Base Made Of Lean Concrete, Floor Thickness. 18Cm Reinforced With Dramix Dispersed Reinforcement In The Amount Of 25Kg/M2 Of C25/30 Concrete, Or Other Equivalent Reinforcement; - New Plastering On The Reinforced Concrete Wall And Supplementing The Plastering On The Existing Walls., Cement-Lime Plaster Category Iii; Surface. Selection Of Places To Be Demolished After Determining The Location Of The Load-Bearing Flat Bars Of The Floor; - Reinforcement Of The Steel Ceiling Beams In Room No. 1, By Making Steel Overlays And Welding Them To The Web And The Upper And Lower Flange Of The I-Beam, Or Making A New/New Steel Column As The Existing One, Foundation On New Foundation Footing; - Making New Plaster On The Ceiling And On The Side Edges Of The Ceiling After Demolition. Plaster Protection Of All Steel Elements Of The Ceiling; - Cleaning, Painting Of All Steel Elements Of The Ceiling, Beams, Columns With Oil Paint; - Protection Of Load-Bearing Elements Of The Ceiling With Casing Made Of Promaxon Boards, Thickness 8Mm Or 2X Rigips 4Pro Fire Th. 12.5 Mm, On The Ceiling, The Ground Beam Secured With Fobos M4 And The Steel Beam Should Be Secured Together; - Protection Of The Load-Bearing Elements Of The Ceiling, Columns With Casing Made Of Promaxon Boards, Th. 8Mm Or 2X Rigips 4Pro Fire Th. 12.5Mm. Column Base / Gusset Plate Either Protected By Enclosing With Boards Or Encased In Concrete. It Is Allowed To Paint The Steel Structures With Intumescent Paints Up To R15; - Painting All Walls Twice With White Emulsion Paints; - Painting All Steel Elements Embedded In The Walls In Gray, I.E. Window Joinery Elements, Stable Remains; - Painting Paneling In Gray With Oil Paint Up To The Height Of 1.50 M; - Insulation Of The Reinforced Concrete Wall From The Outside Of The Rooms In The Unusable Attic With Mineral Wool Gr. 20 Cm; - Execution Of A Strip Of New Roofing Felt On The Old Roofing Felt On The Section 1.0 M From The Fire-Resistant Wall On The Roof Made Of Roofing Felt With Broof (T1) Classification, Which Can Be Laid On The Existing Roofing Felt, E.G. Roofing Felt Termik Top 5.2 Fast Sbs System Icopal; Assembly Of The Door To The Warehouse Room, White Color, Door As Standard Porty, 3 Hinges, Handle + Lock With A Key, Panel, On A New Wooden Door Frame.►Electrical Installation Works: Internal And External Up To 1Kv: - Disassembly Of The Existing Installation In The Area Covered By This Study In The Building, I.E. The Main Switchgear, Wiring And Electrical Installation Accessories Along With Lighting Fixtures, Lightning Protection System Within The Scope Of The Works; - Cables - Preparation Of The Ground, Casing Pipes; - Assembly Of Lighting Fixtures And Electrical Installation Accessories; - Installations N/ T G. 230V Plug Sockets; - Free-Standing Cable Cabinet Zk-Mps - Equipped With The Designed Apparatus And Fire Protection Switch; - Internal Power Line (Wlz) For The Needs Of The Mps Warehouse; - Electrical Installations. Basic, Emergency And Evacuation Lighting; - Electrical Installations Internal To The Equipment Resulting From The Building Technology; - Adaptation Of The Existing Lightning Protection System In The Explosion Hazard Zone; - Installation Of Equipotential Bonding; - Performance Of Electrical And Acceptance Measurements; - Assembly Of Apparatus, Devices And Installation Accessories In Accordance With The Documentation, Along With Transport And Storage Of Materials, Preparation Of The Substrate And Accompanying Works; - Restoring The Walls To Their Original Condition After The Plastering Works Performed Within The Scope Of The Works Carried Out. ► Assembly Works Of The Cold Water Installation Include Primarily: - Assembly Of Pipes; - Assembly Of The Connection Gate Valve; - Assembly Of Fittings (Eye Wash); - Leak Tests Of The Water Supply System ; Rinsing And Disinfection Of Water Supply Lines; - Assembly Of A Protective Pipe For Passage Under The Foundation Of The Outer Wall. ► Assembly Works Of Sanitary Sewage Installation Include Primarily: - Assembly Of The Conduit To The Tank Under The Eye Washer; - Connection Of Accessories; - Leak Test Of The Sewage System. In The Area Of Ventilation Devices - Disassembly Of Existing Ventilation Devices; - Disassembly Of Existing Ventilation Ducts; - Preparation Of Openings In The Walls For Ventilation Ducts; - Assembly Of Structures For Ventilation Devices; - Assembly Of A New Ventilation System With Devices; - Installation Of Supply And Exhaust Ventilation; - Assembly Of Ventilation Devices.►The Scope Of Works Also Includes Accompanying Works Consisting In Lighting The Work Site, Securing The Work Site With Warning Signs, Handrails, Bridges, Canopies And Protections On The Work Site, Fencing Work Stages, Construction And Maintenance Of Construction Site Facilities, Marking And Securing Installations And Equipment At The Work Site. The Above Is Implemented By The Contractor With His Own Efforts And At The Price Of The Contract. The Facility In The Scope Of Which The Works Will Be Performed Will Be Open For The Duration Of Their Execution, Excluding The Part Of The Building Where The Works Will Be Performed. In The Event Of Failure To Meet The Conditions, The Contractor Shall Be Liable For Damages And Situations Arising As A Result Of His Actions Or Omissions. ►The Contractors Remuneration For The Performance Of The Subject Of The Contract Is Determined In A Lump Sum, According To The Price Indicated In The Contractors Offer. ►Materials Used To Perform The Subject Of The Contract May Not Reduce The Utility And Qualitative Value Of The Completed Elements Of The Contract Or Adversely Affect The Strength, Functionality, Aesthetics And Safety Of Use And Use Of The Work Site And Its Boundaries. If A Trademark, Patent Or Origin - It Should Be Assumed That The Indicated Trademarks, Patents, Origin Are Defined By Technical, Operational And Utility Parameters, Which Means That The Ordering Party Allows Solutions Equivalent To Those Described (Legal Basis Of Article 99 Of The Act), Provided That The Technical Parameters/Physical And Chemical Composition Of The Offered Equivalent Products Guarantee The Final Effect Required By The Ordering Party Is Identical To The Original Product. If The Contractor Does Not Submit Information On The Use Of Equivalent Materials With The Offer, It Is Considered That The Price Calculation Includes The Materials Indicated In The Documentation. ► The Contractor Is Obliged To Ensure The Collection And Disposal Of Waste (Garbage) On Its Own Debris, Etc.) In Accordance With Applicable Law, In Particular The Act On Waste (Art. 3 Section 1 Point 32 Of The Act On Waste Of December 14, 2012, Journal Of Laws Of 2022, Item 699, As Amended) And Documenting These Activities. If The Contractor Uses A Subcontractor In The Above Scope, He Should Indicate The Subcontractor Along With The Offer. ► The Contractor Is Obliged To Collect And Remove The Scrap Obtained During Construction Works. From Each Export And Weighing, A Quantitative Statement Of The Scrap Obtained From The Dismantling Will Be Prepared, Indicating The Type Criterion (Steel, Cast Iron, Copper, Brass, Aluminum Scrap). ►The Contracting Authority Requires The Contractor Or Subcontractor To Employ Persons Performing Construction Works Covered By The Scope Of The Subject Of The Contract On The Basis Of An Employment Contract - The Performance Of These Activities Consists In Performing Work In The Manner Specified In Art. 22 § 1 Of The Act Of June 26, 1974 - Labor Code (Journal Of Laws Of 2022, Item 1510, Consolidated Text).
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
602cd46c-2d8e-4b9d-b84e-740c5febdfde.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.