GTR 68250826

Tenders Are Invited For Reconstruction Of The Building Of The Primary School In Kierzno - Improvement Of Educational Infrastructure

ICB — International Competitive Bid Closed Central Europe
Tender Information
GTR Reference
68250826
Tendering Authority
Subscribe to view
Tender No
WR.271.26.2023
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Reconstruction Of The Building Of The Primary School In Kierzno - Improvement Of Educational Infrastructure
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
29-08-2023 Closed
Work Detail
The Subject Of The Contract Is The Reconstruction And Change Of Use Of The Primary School Building In Kierzno. Design Development Area - 223 M2 Usable Floor Area - 173.47 M2 Cubic Capacity - 1650 M3 .: - Demolition Of Existing Walls, - Construction Of New Partition Walls, - Painting Of Rooms, - Laying Of Wall And Floor Tiles, - Execution Of Floors And Laying Of Heat-Weldable Linings, - Execution Of Sanitary Installations (Central Heating, Water, Sewage, Ventilation, Air Conditioning), - Installation (Supply Of Technical Devices), - Distribution Of Electrical Installation In Rooms, - Installation Of Led Lighting, Note: The Order Also Includes All Construction Works On The Ground Floor. In Addition, The Contractor Is Obliged To Perform All Installations That Should Be Led To The First Floor, I.E. Sanitary Installations (Water, Sewage, Central Heating), Electrical Installations. In The Field Of Sanitary Industry - Ventilation, We Do Not Only Make Ventilation Ducts That Are To Be Used To Ventilate Rooms From The First Floor. All Ducts Necessary To Connect Ground Floor Rooms With The Air Handling Unit Must Be Made. The Order Does Not Include The Construction Of A Playground. The Order Also Includes: - Ensuring Safety On And Around The Construction Site And Construction Insurance, - Notifying The Relevant Authorities And The Owner Of The Property Where Renovation Works Will Be Carried Out About The Commencement Of Works, - Accompanying Works And Temporary Works Specified In Stwiorb, - Carrying Out All Tests, Checks And Acceptances, Provided For In The Technical Conditions For The Execution And Acceptance Of Construction, Assembly And Installation Works, - Tidying Up The Construction Site After The Completion Of The Works And Handing It Over To The Employer By The Date Of Final Acceptance At The Latest, - Performance Of All Works And Activities Related To With The Proper Performance Of The Contract, Even If They Have Not Been Included In The Bill Of Quantities - All Construction Materials And Products As Well As Equipment Necessary To Perform The Works Are Secured By The Contractor, - Performance Of All Works And Activities Related To The Proper Performance Of The Contract, Even In The Event That They Have Not Been Included In The Tender Bill Of Quantities, - Full Surveying Service For The Construction Site: Demarcation, Possible Indication Of Boundaries, - All Repairs Of Above And Underground Devices Damaged During The Execution Of Works, - Carrying Out All Works And Activities Related To The Acceptance Of The Subject Of The Contract And Its Transfer To Operation, Etc. - Securing Safety On And Around The Construction Site And Construction Insurance, - Other Activities Resulting From Industry Regulations Or The Specificity Of The Contract. The Contractor Should Anticipate All Circumstances That May Affect The Price Of The Contract. In View Of The Above, It Is Recommended That Bidders Check The Terms Of The Contract In Detail In The Field. It Is Recommended That The Contractor Familiarize Himself In Advance With The Area Where The Works Constituting The Subject Of This Order Will Be Carried Out, As Well As With The Elements Of Underground And Above-Ground Utilities In The Area Of ​​Works Implementation And Its Vicinity, And With The Facilities Operating In The Area Of ​​The Investment Being Carried Out. The Contractor Will Not Be Able To Demand Additional Remuneration For Not Taking Into Account The Above-Mentioned Circumstances, And These Circumstances Will Not Be A Sufficient Reason For The Contractor Not To Be Able To Start The Works On Time. A Detailed Description Of The Subject Of The Contract And The Scope Of The Task Is Specified In: The Contract, Technical Specification For The Execution And Acceptance Of Works, Bills Of Quantities (As An Aid), Which Are Attached To The Swz. The Order Also Includes: 2.1. In All Places Of The Tor And Appendices To The Tor, Where An Exemplary Trademark, Patent, Origin, Source Or Specific Process Is Used, Which Characterizes The Products Or Services Provided By A Specific Contractor, Or If The Employer Described The Subject Of The Contract By Reference To Standards, Technical Assessments, Technical Specifications And Technical Reference Systems Referred To In Art. 101 Sec. 1 Point 2 And Par. 3 Pzp, And In Each Case, Acting In Accordance With Art. 99 Sec. 6 And Art. 101 Sec. 4 Of The Ppl, The Employer Allows Solutions Equivalent To Those Specified In The Tor And In The Appendices To The Tor, Marking Such Indications Or References With The Words Or Equivalent Or Or Equivalent Respectively, Provided That The Parameters Are Not Worse Than Those Specified In The Description Of The Subject Of The Contract. An Equivalent Solution Is Also Acceptable In A Situation Where The Word Equivalent Or Equivalent Is Not Included In The Description Of The Subject Of The Contract.2.2. Equivalence Consists In The Possibility Of Offering The Subject Of The Contract With Not Worse Technical Parameters, Configurations, Normative Requirements, Etc. In The Detailed Description Of The Subject Of The Contract, Some Manufacturer-Specific Dimensions May Be Provided. Proper Names Of Manufacturers Of Materials And Devices Given In The Detailed Description Should Be Understood As The Preferred Type In Terms Of Determining The Minimum Quality Requirements. They Are Not Binding And You Can Provide Equivalent Elements That Have At Least The Same Or Better Standards, Technical Parameters; Qualitative, Functional, Thematically Identical And For The Same Purpose, And Will Not Lower The Standards Specified In The Description Of The Subject Of The Contract.2.3. All Products From Specific Manufacturers Define The Minimum Quality Parameters And Functional Characteristics That The Goods Must Meet In Order To Meet The Requirements Set By The Ordering Party And Constitute Only A Quality Standard Of The Subject Of The Order. By Recording The Minimum Requirements Of Quality Parameters, The Ordering Party Understands The Requirements Of The Goods Contained In Publicly Available Sources, Catalogs, Manufacturers Websites. Thus, The Use Of The Names Of Manufacturers/Products/ Is Only Exemplary. When Describing The Subject Of The Contract, The Contracting Authority, Indicating The Designation Of A Specific Manufacturer (Supplier) Or A Specific Product, Allows Equivalent Products With Quality Parameters And Functional Characteristics, At Least At The Level Of The Parameters Of The Indicated Product, Thus Recognizing Any Product With The Indicated Parameters Or Better. In Such A Situation, The Ordering Party Requires The Submission Of Relevant Documents To Authenticate These Materials Or Devices Along With The Offer. They Will Be Assessed During The Examination Of The Offer.2.4. The Ordering Party Obliges The Contractors To Demonstrate Solutions Equivalent To Those Applicable To The Documentation Of The Procedure. According To Art. 101 Sec. 5 Of The Public Procurement Law, The Contractor Who Refers To Equivalent Solutions (In A Situation Where The Description Of The Subject Of The Contract Refers To The Standards, Technical Assessments, Technical Specifications And Technical Reference Systems Referred To In Article 101 Section 1 Item 2 And Section 3 Pzp), Is Obliged To Prove In The Offer That The Supplies It Offers Meet The Requirements Set Out In The Swz. Failure To Indicate These Elements Will Be Treated As A Selection Of Elements Described In The Tor (Including The Appendices To The Tor).2.5. The Ordering Party Obliges The Contractors To Demonstrate Solutions Equivalent To Those Applicable To The Procedure Documentation (Swz And Its Attachments). Pursuant To Art. 101 Sec. 6 Of The Ppl, The Contractor Who Refers To Equivalent Solutions (In A Situation Where The Description Of The Subject Of The Contract Refers To The Performance Or Functionality Requirements Referred To In Article 101 Section 1 Point 1 Of The Ppl) Is Obliged To Prove In The Offer That The Object Construction, Delivery Or Service Meet The Performance Or Functionality Requirements Specified By The Employer
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
348e7bc5-ba10-4ae5-96f9-070b73b9e31a.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders