GTR 68189286

Tenders Are Invited For Contract For Construction Works: Removal Of Architectural Barriers And Renovation Of The Boiler Room In The Administrative Building Of The Poviat Starosty In Nowy Sącz At Ul. Jagiellońska 33: Cellars.

ICB — International Competitive Bid Closed Central Europe
Tender Information
GTR Reference
68189286
Tendering Authority
Subscribe to view
Tender No
ZP.272.18.2023
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Contract For Construction Works: Removal Of Architectural Barriers And Renovation Of The Boiler Room In The Administrative Building Of The Poviat Starosty In Nowy Sącz At Ul. Jagiellońska 33: Cellars.
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
17-08-2023 Closed
Work Detail
The Subject Of The Contract Includes The Following Construction Works: Scope A: Removal Of Architectural Barriers And Adaptation Of The Administrative Building Of The Poviat Starosty In Nowy Sącz At Ul. Jagiellońska 33 For Compliance With Fire Regulations: Cellars Scope B: Renovation Of The Boiler Room In The Administrative Building Of The District Office In Nowy Sącz At Ul. Jagiellońska 33: Cellars1. The Material Scope Of Construction Works Aimed At: A) Removing Architectural Barriers And Adapting The Administrative Building Of The Poviat Starosty In Nowy Sącz At Ul. Jagiellońska 33 For Compliance With Fire Protection Regulations: Basements (Scope A) Includes In Particular: • Demolition Works, • Disassembly And Assembly Of Internal Doors, • Fragmentary Alteration Of The Electrical And Water And Sewage Systems, • Construction Of Partition Walls, • Internal Drainage Involving The Assembly Of An Internal Chamber, Drainage Channels And A Pump, • Anti-Moisture Insulation, • Flooring Works, • Plastering And Painting Works, • Renovation, Construction And Finishing Works, B) Renovation Of The Boiler Room In The Administrative Building Of The Poviat Starosty In Nowy Sącz At Ul. Jagiellońska 33: Cellars (Scope B) Includes In Particular: • Disassembly Of Existing Gas Boilers With Equipment, • Assembly Of New Gas Boilers (2 Pcs.) With Equipment, • Installation Of A Heat Exchanger (In Place Of A Hydraulic Coupling), • Installation Of A Circulation Pump Central Heating (1 Item), • Disassembly Of The Mag Valve, • Modernization Of The Gas System In Order To Install The Mag Valve, • Installation Of The Mag Valve (Valve From Disassembly), • Removal Of The Concrete Plinth, • Execution Of The Concrete Plinth For The Utility Water Tank, • Completion Of The Lining Wall With Ceramic Tiles, • Drainage Of Rainwater From The External Staircase, • Plastering And Painting Works.2. Place And Manner Of Execution Of Construction Works: A) Place Of Execution Of Construction Works: Administrative Building Of The Poviat Starosty In Nowy Sącz At Ul. Jagiellońska 33, Nowy Sącz Poviat, Lesser Poland Voivodeship (Registration Plot No. 17, Rev. 76, Nowy Sącz). The Building In Which The Construction Works Will Be Carried Out Is An Active Structure, Used In Accordance With Its Intended Use. B) Method Of Carrying Out Construction Works: • The Contractor Is Obliged To Carry Out The Works In A Manner Ensuring Uninterrupted Use Of The Structure And Maintaining The Safety Of People In And Around The Facility; • The Contractor Is Obliged To Ensure Free And Safe Access To The Building And To The Area Around The Building (Sidewalks, Parking Lot, Etc.) Not Directly Covered By The Investment Process; • The Contractor Is Obliged To Perform Construction Works In A Way That Allows Employees Of The Poviat Office To Deal With Business Matters On An Ongoing Basis; • Contractor Is Obliged To Mark The Place Of Work And Protect It Against Unauthorized Access; • The Contractor Is Obliged To Protect The Rooms Adjacent To The Place Of Work Against Dust And Dirt; • The Contractor Is Obliged To Ensure Ongoing Cleanliness In The Immediate Vicinity Of The Work; • The Contractor Is Obliged Is To Remove Rubble And Redundant Materials On An Ongoing Basis; • The Contractor Is Obliged To Ensure In The Building Where Construction Works Will Be Carried Out Permanent Access To Electricity And Running Water During Its Office Hours; • The Contracting Authority Does Not Allow The Telecommunications Network To Be Turned Off During Official Hours Without The Knowledge And Consent Of The Ordering Party; • Particularly Strenuous Works Should Be Performed After The Working Hours Of The Office, Ie After 4.00 P.M. Or On Non-Working Days; • Works Should Be Carried Out In Consultation With The Director Of The Administrative Department Of The Poviat Starosty In Nowy Sącz. 3. Detailed Scope Of Construction Works Aimed At: A) Removing Architectural Barriers And Adapting The Administrative Building Of The Poviat Starosty In Nowy Sącz At Ul. Jagiellońska 33 For Compliance With Fire Protection Regulations: Cellars (Scope A) Was Defined By Means Of Technical Documentation /Also Referred To As Design Documentation/ Entitled Construction Works In The Existing Administrative Building Of The Poviat Starosty In Order To Adapt The Building In Question To Fire Protection Regulations. And The Needs Of People With Disabilities”, Constituting Appendix 1A To Swz, Which Consists Of: • Architectural And Construction Design With A Drawing Part Developed By Mgr Inż. Arch. Paweł Michalik, • Technical Design (Architectural Industry) Developed By Mgr Inż. Arch. Paweł Michalik,• Detailed Design (Architectural Industry) Developed By Mgr Inż. Arch. Paweł Michalik, • Technical Design (Construction Industry) Developed By Mgr Inż. Mateusz Morańda,• Detailed Design (Construction Industry) Developed By Mgr Inż. Mateusz Morańda, • Technical Design (Electrical Branch) Developed By Mgr Inż. Piotra Pawlak,• Detailed Design (Electrical Branch) Developed By Mgr Inż. Piotra Pawlak,• Execution Design (Fire Alarm System) Developed By Mgr Inż. Piotr Pawlak, • Technical Design (Sanitary Industry) Developed By Mgr Inż. Katarzyna Majcher,• Detailed Design (Sanitary Industry) Developed By Mgr Inż. Katarzyna Majcher, • Technical Specification For The Execution And Acceptance Of Construction Works (Architectural Industry) Developed By Mgr Inż. Arch. Paweł Michalik, • Technical Specification For The Execution And Acceptance Of Construction Works (Electrical Industry) Developed By Mgr Inż. Piotra Pawlak, • Technical Specification For The Execution And Acceptance Of Construction Works (Sanitary Industry) Developed By Mgr Inż. Paweł Majcher, • Information On Safety And Health Protection Prepared By Mgr Inż. Paweł Michalik. Additionally, Appendix 1A To The Swz Contains: • Decision No. 118/202 Of April 6, 2023 Of The President Of The City Of Nowy Sącz On Approving The Architectural And Construction Design And Granting A Building Permit, • Technical Expertise On Fire Protection Developed By M.Sc. Eng. Arch. Mirosław Trzupek And Eng. Hieronim Dzikowski, • Technical Expertise In The Construction Industry Developed By Mgr Inż. Mateusz Morańda, • Bills Of Quantities (Regarding Scope A, Respectively, For The Construction And Sanitary Industries), Which, Due To The Flat-Rate Nature Of The Remuneration, Constitute Only Information Material As To The Type Of Works Covered By This Order, Therefore The Contractor Cannot Refer To The Bills Of Quantities As The Basis For The Valuation The Indicated Construction Works Are To Be Performed In Accordance With The Construction Art And Technical Documentation. Note No. 1: This Order Covers The Scope Of Works Separated From The Available Design Documentation (Annex 1A To Swz) Regarding Only The Removal Of Architectural Barriers And Adaptation Of The Administrative Building Of The Poviat Starosty In Nowy Sącz At Ul. Jagiellońska 33 For Compliance With Fire Regulations: Cellars. In Addition, The Scope Of Works Covered By The Contract In Question, Taking Into Account The Provision Of Point Iii Subpoint 3 Lit. A) The Eighteenth Indent Of Swz, Was Included In: - Bill Of Quantities (For The Construction Industry) Entitled Construction Works In The Existing Administrative Building Of The Poviat Starosty In Order To Adapt The Building In Question To Fire Protection Regulations. And The Needs Of The Disabled (Bill Of Quantities A1); - Bill Of Quantities (For The Sanitary Industry) Entitled Construction Works In The Existing Administrative Building Of The Poviat Starosty In Order To Adapt The Building In Question To Fire Protection Regulations. And The Needs Of People With Disabilities (Bill Of Quantities A2). In Addition, The Scope Of Works Covered By The Contract In Question Has Been Marked In Color As The Scope Of Development In Fig. No. 2.2 (Architectural Industry) And Fig. No. 1 (Sanitary Industry). Thus, The Subject Of The Contract Does Not Include Construction Works In The Remaining Part Of The Administrative Building. Note No. 2: Due To The Flat-Rate Nature Of The Remuneration, All Other Provisions Regarding The Method Of Settlement Included In The Design Documentation Should Be Treated As Non-Binding. B) Renovation Of The Boiler Room In The Administrative Building Of The District Office In Nowy Sącz At Ul. Jagiellońska 33: Cellars (Scope B) Was Defined By Means Of Technical Documentation /Also Referred To As Design Documentation/ Entitled Renovation Of The Gas Boiler Room, Constituting Annex No. 1B To The Swz, Which Consists Of A Technical Design (Sanitary Industry) Developed By Mgr Inż. Katarzyna Majcher. In Addition, Appendix 1B To The Swz Contains: • Bill Of Quantities (Regarding Scope B For The Sanitary Industry), Which, Due To The Lump-Sum Nature Of The Remuneration, Is Only Information Material As To The Type Of Works Covered By This Order, Therefore The Contractor Cannot Refer To For The Bill Of Quantities As The Basis For The Valuation Of The Offer. The Indicated Construction Works Are To Be Performed In Accordance With The Construction Art And Technical Documentation. B) The First Indent Of Swz, Was Included In The Bill Of Quantities Entitled Renovation Of The Gas Boiler House In A Public Utility Building (Bill Of Quantity B). Note No. 2: Due To The Flat-Rate Nature Of The Remuneration, All Other Provisions Regarding The Method Of Settlement Included In The Design Documentation Should Be Treated As Non-Binding.4. Possible Trademarks, Patents Or Origins, Proper Names Of Goods Or Their Producers, Source Or Specific Process, Which Characterizes The Products Supplied By A Specific Contractor, Given In The Technical Documentation, Are Exemplary, And Their Indication Is Intended To Determine The Expected Standard, While Indicating Such A Accompanied By The Words Or Equivalent.5. The Employer Requires That The Contractor Provide A Minimum 5-Year Quality Guarantee And Warranty For The Construction Works, Which Are The Subject Of This Contract (Note: The Period Of The Quality Guarantee And Warranty Is A Criterion For Evaluating Tenders, See Point Xiii Sub-Point 4 Of The Swz.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
cd1b58f3-c4f9-4cae-9e92-d67c3f505f62.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders