GTR 68189187
Tenders Are Invited For Removal Of Architectural Barriers Through The Extension, Reconstruction And Change Of Use Of The Former School Building In Bostow To A Health Care Building
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
68189187
Tendering Authority
Subscribe to view
Tender No
IGKiP.271.4.2023
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Removal Of Architectural Barriers Through The Extension, Reconstruction And Change Of Use Of The Former School Building In Bostow To A Health Care Building
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
21-08-2023
Closed
Work Detail
The Subject Of The Contract Is Construction Works Consisting In The Extension, Reconstruction And Change Of Use Of The Former School Building In Stary Bostow Located On Plots No. The Existing Building Of The Former School Is An Object Constructed In 1994. In Traditional Brick Technology, With 3 Floors Above Ground: Ground Floor, First Floor And High Basements. The Roof Over The Main Body Of The Building - Gable, Covered With Trapezoidal Sheet. The Building Is Currently Not In Use. As Part Of The Extension, An Elevator Shaft Will Be Added With Space For Locating A Lift Enabling Access To The Ground Floor And First Floor By The Disabled. The Reconstruction Will Cover All Storeys Of The Building. New Partition Walls Will Be Built, New Door Openings Will Be Created In The Existing Internal Walls, Some Window Openings In The External Walls And Door Openings In The Internal Walls Will Be Bricked Up, Internal Load-Bearing Walls Will Be Partly Demolished, External Stairs Will Be Completely Dismantled And Rebuilt, And One Of The Ventilation Chimneys Will Be Demolished, New Vents Will Be Built. Flooring And Insulation Will Be Replaced. All Windows And Doors Will Be Replaced. Additional Insulation Of The External Walls Of The Above-Ground Storeys And Foundation Walls Will Be Made Along With Damp Insulation, And The Roof Covering Over The Entire Building Will Be Changed. In The Basement Level, Space Will Be Provided For Technical Rooms, A Cleaning Room, A Server Room, A Medical Waste Room, A Gas Boiler Room And Social Rooms For Employees With A Cloakroom With Sanitary Facilities. On The Ground Floor, It Is Planned To Create A Public Area For The Patient With A Waiting Room, Vaccination Point, Doctors Office, And Patient Registration. In Addition, It Is Planned To Create A Pharmacy Point With Facilities And W.C. For Patients, Children And Staff And A Cleaning Room. On The First Floor There Are: A Gynecological Office With Registration And Sanitary Facilities, A Treatment Room, A Dentists Office, An Ultrasound And Ecg Room, A Laboratory Collection Point, Two Doctors Offices, And A Toilet For Patients And A Cleaning Room. Change Of Use: 1. Building Area Of The Whole Building: 334.15 M21.1. Building Area Of The Designed Extension: 25.40 M22. Usable Area Of The Entire Building: 727.03 M22.1. Usable Area Of The Extended Part: 51.16 M23. Total Area Of The Entire Building: 996.85 M23.1. Total Area Of The Extended Part: 70.60 M24. Gross Volume Of The Entire Building: 2,942.15 M34.1. Gross Volume Of The Extended Part: 234.68 M3. A Photovoltaic Installation With An Installed Capacity Of 9.9 Kwp Will Be Located On The Roof Of The Building. Scope Of Works For The Entire Construction Project And The Order Of Implementation: Scope Of Works: Demolition Works; Earthworks; Foundation Works; Construction Of Basement Walls; Execution Of The Walls Of The Ground Floor; Execution Of The Ceiling Above The Ground Floor; Execution Of The Walls Of The First Floor; Execution Of The Ceiling Above The First Floor; Execution Of Reconstruction; Execution Of The Roof Structure Together With The Covering; Execution Of The Facade; Execution Of Internal Installations; Finishing Works. Sequence Of Implementation: Demolition And Transfer Of The Fence; Demolition Of Existing Pavements; Extension And Reconstruction; Execution Of Gas Installation In The Ground; Access And Access Roads, Greenery. The Building Has Been Designed To Provide The Necessary Conditions For Use By Disabled People. They Constitute An Integral Part Of This Swz. The Works Covered By The Subject Of The Order Should Be Performed In Accordance With The Design Documentation And The Conditions Contained In The Swz, The Contract Template And The Applicable Regulations, Standards And Principles Of Technical Knowledge And Construction Art, Due Diligence In Their Performance, Safety, Good Quality And Appropriate Organization. The Ordering Party Requires A Site Inspection Within The Subject Of The Order For Contractors Interested In Submitting A Bid. The Site Visit Is Intended To Familiarize The Contractor With The Specifics Of The Subject Of The Contract, Including The Conditions Of Its Performance. Each Of The Contractors Should Set The Date Of The Site Visit Individually With The Contact Persons Indicated In The Swz, Bearing In Mind That The Visits May Only Be Carried Out In The Presence Of The Employers Employees And On Dates In Advance. The Site Inspection May Take Place Only Before The Scheduled Date For Submission Of Bids. Persons Who Come To The Site Inspection Are Required To Have An Identity Document With Them. A Protocol Signed By The Parties Will Be Drawn Up From The Site Visit, Which Will Confirm The Site Visit (The Template Of The Report Is Attached To The Tor). The Cost Of The Site Visit (Related To Travel To The Site, The Use Of Own Employees, Etc.) Other Consequences Of The On-Site Inspection Are Borne By The Contractors Themselves. Lack Of Participation In The On-Site Inspection Of The Contractor Results In The Rejection Of His Offer Pursuant To Art. 226 Sec. 1 Point 18 Of The Public Procurement Law. All Materials Used Should Comply With The Applicable Standards And Have The Required Attestations And Certificates And Must Not Pose A Threat To The Hygiene And Health Of Users According To The Requirements Of The Act Of July 7, 1994. - Building Law. Depending On The Materials Used, The Technology And Manufacturers Requirements Must Be Strictly Observed. Before The Final Acceptance, A Complete Set Of Pzh Certificates Should Be Presented And Attached To The Acceptance Documentation. The Contractor Shall Also Include The Following In General Costs: 1) Comprehensive Geodetic Service, 3 Copies Of The As-Built Geodetic Inventory (Including 1 Copy On An Electronic Medium). Vector File Format And Content. The File Format Is Dwg Or Dxf. 2) Preparation Of As-Built Documentation. 3) Obtaining A Positive Decision On The Occupancy Permit. .Extension Min. Guarantee And Warranty Period Is A Criterion For Evaluating Offers.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
23f2043a-7087-44e4-8865-18b8c04b86d0.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.