GTR 68070574
Tenders Are Invited For Modernization Of Sanitary Facilities In The Building Of The Commune Office In Mykanów
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
68070574
Tendering Authority
Subscribe to view
Tender No
GKZ.271.18.2023
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Modernization Of Sanitary Facilities In The Building Of The Commune Office In Mykanów
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
18-08-2023
Closed
Work Detail
The Subject Of The Contract Is: Modernization Of Sanitary Facilities In The Building Of The Commune Office In Mykanów2. Three Rooms Are Intended For Renovation, Each With An Area Of About 6.5 M2 (Dimensions About 2M X 3M). Two Rooms Are Intended For Womens Toilets. One Room Is Dedicated To The Mens Toilet. The Difference Between Womens And Mens Toilets Will Be That In The Womens Toilet There Will Be Two Toilet Bowls, While In The Mens Toilet There Will Be One Toilet Bowl And One Urinal. Other Devices, - Forging And Dismantling Partition Walls In Three Bathrooms, Each With An Area Of 15M2 - Forging And Disassembling Ceramic Tile Coverings On Floors And Walls In 3 Bathrooms, Each With An Area Of Floors Approx. 6.5 M², Area 30 M² - Disassembly Of The Existing Sanitary Sewage System (Cast Iron Pipes 100Mm) - Cutting Out Door Frames In 3 Bathrooms - 3 Pcs. - Disassembly Of Old Lighting Fixtures On The Ceiling - Disassembly Of Wall Panels In The Corridor Area Of Approx. 100 M2 Note: - All Works Demolition Materials Should Be Removed And Utilized And Waste Cards Should Be Presented. - All Approaches Are To Be Reworked. - In The Event Of Damage To The Walls During The Removal Of Tiles From The Partition Walls, Their Disassembly And Re-Execution In The Existing Technology Should Be Provided For. B) Construction Works: - Preparation Of Floor And Wall Surfaces, Including Priming, Before Plastering, Tiling, Painting, Etc. - Bricking Up The Openings Of The Existing Doors - 6 Pcs - Making A Self-Levelling Screed In Rooms Before Laying Ceramic Tiles On The Area Of Approx. 19.5 M2 (3 Bathrooms, 6.5 M2 Each) - Installation Of Adjustable Door Frames 80 Cm Wide - 4 Pcs (3 Bathrooms Plus One Door Frame In The Corridor) - Laying Tiles With Dimensions Of 60X60 Cm (Size, Color And Pattern To Be Agreed With The Customer) On Floors With An Area Of Approx. 19.5 M² With Abrasion Resistance Class V And Anti-Slip Properties R>=10 - Execution Of Tiles On Walls With Dimensions Of 30X60 Cm (Size, Color And Pattern To Be Agreed With The Employer) On The Entire Height Of The Wall With An Area Of Approx. Approx. 90 M² - Execution Of Plasterboard Ceilings For The Area Of Approx. 19.5 M2 (Adapted To Wet Rooms) - Two Coats Of Ceiling Painting With Latex Paint Intended For Kitchen/Bathroom Rooms, Area Approx. 19.5 M²; - Gluing The Mesh Layer On The Walls And Ceilings Of The Corridors Of 160M2 - Making Gypsum Plaster On The Walls Of The Corridors Of The Area Of 160M2 - Painting The Walls Of The Corridors Twice With Emulsion Paints Of The Area Of 160M2 - Delivery And Installation Of 9 Led Point Ceiling Luminaires And 3 Led Luminaires Above The Mirror (Ip Luminaires For Bathroom Rooms) (Type Of Fittings To Be Agreed With The Ordering Party) - Delivery And Installation Of Factory-Finished Full Door Leaves (Filling: Perforated Chipboard, With Bottom Undercut) Equipped With Handles, Locks With Insert 3 Pcs. And Factory-Finished Full Door Leaves (Filling : Perforated Chipboard) Equipped With A Handle, Lock With Insert - 1 Pc. (Door In The Corridor) (Door Model To Be Agreed With The Ordering Party) - Installation Of 3 Electric Extractors Ensuring Proper Air Exchange In The Room - Installation Of Sanitary Cabins Made Of Hpl Boards Equipped With Doors Locked To Secure Them From The Inside - 3 Pcs. (One Double Cabin For Each Bathroom) - Casing Of Flush-Mounted Frames Made Of Double Plasterboard (Adjusted To Wet Rooms) At Toilet Bowls And Urinals - Delivery And Installation Of White Assembly And Accessories: • Toilet Paper Holder Made Of Stainless Steel, 6 Pcs. • Containers For Paper Towels Made Of Stainless Steel 3 Pcs. • Baskets For Used Stainless Steel Towels 3 Pcs. • Mirror Above The Washbasin 90 X 60 Cm 3 Pcs. (Flush With Tiles) • Soap Dispensers Made Of Stainless Steel 3 Pcs. • Washbasin 50 Wide -60Cm 3 Pcs. • Bathroom Cabinet Under The Washbasin • Complete Compact Toilet With A Geberit Type Flush-Mounted Frame 5 Pcs. • Washbasin Taps 3 Pcs. • Complete Toilet Urinals With A Geberit Type Flush-Mounted Frame 1 Pc. • Electric Hand Dryers – 3 Pcs. • Instantaneous Water Heaters Or Thermal Baths 3 Pcs. (To Be Agreed With The Ordering Party) • Toilet Equipment Should Be Connected With Pvc Fittings To The Existing Sewage System Made Of 100Mm Cast Iron Pipes. The Water Installation Is Made Of Galvanized Steel Pipes And Such Approaches Should Also Be Made • Replacement Of All Switches And Contacts For Bathroom Rooms With New Ones, 3 Contacts, 3 Switches, Including 3 Double Switches, Along With The Replacement Of Cable Wires With A Total Length Of Approx. 30 M Note: • Colors Of Walls, Type And Color Of Tiles, Type Of Equipment, Etc. To Be Agreed With The Employer • Repair Of All Damaged Elements During Demolition And Construction Works, Including Existing Installations On The Contractors Side • Target Location For Mounting Elements Such As Paper Towel Container, Paper Holders Toilet, Dryer, Water Heater, Washbasin, Mirror, Etc. Should Be Agreed With The Employer. • All Installed Elements Of White Assembly And Bathroom Equipment Should Be Vandal-Proof. The Employer Requires A Site Visit To Inspect The Intended Operation, Confirmed By A Protocol Prepared By The Employer. Additional Requirements And Information. 1) The Employer Informs That The Renovation Works Being The Subject Of This Procedure Will Be Carried Out Within An Active Public Utility Facility That Must Function On An Ongoing Basis. In View Of The Above, The Offer Price Must Include All Costs Related To Difficulties In The Implementation Of Works Related To Securing Permanent Access To The Facility And Constant Reduction Of The Nuisance Of Carrying Out Construction Works, And Above All: - Regular Cleaning, - Securing Communication Routes Against Damage, - Making Temporary Separations Of Work Places From Other Parts Of The Building So As To Minimize The Penetration Of Pollutants Outside The Work Area, − Preparation Of Rooms For Renovation, − Strenuous Works Causing Noise, Vibrations, Dustiness, Unpleasant Odors Or Air Pollution With Harmful Substances The Contractor Will Carry Out Outside Working Hours Of The Ordering Party. 2) The Employer Allows The Possibility Of Performing Works From Monday To Friday. 3) Deliveries Of Materials And Elements Should Be Carried Out Successively, Due To The Lack Of Storage Space In The Building And Its Surroundings.4. Failure To Include In The Bill Of Quantities Any Works Required For The Proper Performance Of The Contract Does Not Release The Contractor From Their Performance And Valuation. The Contractor Undertakes To Perform The Subject Of The Contract On The Terms Contained In The Draft Contract.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
4dbb004d-de1a-495b-a638-27e879ab2111.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.