As A Wind Farm Developer, Asset Owner And Operator, The Contracting Entity Requires Accurate Assessments Of The Performance Of Their Future Wind Farm Developments. The Accuracy Of The Contracting Entity S Annual Budgeted Energy Production Per Asset Is Integral To The Contracting Entity S Operational Planning From A Business Perspective. The Specification Outlines The Three Projects For Which Energy Yield And Terrain/Obstacle Assessments Are Required. The Total Work Package Consists Of The Following Deliverables For The Three Projects: Work Package 1: Banking Standard Energy Yield Assessment For Each Wind Farm Project: O Energy Yield Modelling Based On Wasp Wind Flow Model O Energy Yield Assessment Report Based On Industry Best Practice Banking Standard Site Meteorological Conditions Assessment Report For The Wind Farm Project Work Package 2: Iec 61400 Terrain And Obstacle Assessment Please Refer To Appendix 1 For Details On How To Access The Full Tender Specification.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.