GTR 67822707

Tenders Are Invited For Fire Protection Of The School Building In Wiry

ICB — International Competitive Bid Closed Central Europe
Tender Information
GTR Reference
67822707
Tendering Authority
Subscribe to view
Tender No
ZP.271.21.2023
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Fire Protection Of The School Building In Wiry
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
09-08-2023 Closed
Work Detail
1. The Subject Of The Contract Is The Execution Of Fire Protection Of The Primary School Building In Wiry.2. The Detailed Scope Of Works, In Accordance With Which The Works Should Be Performed, Is Included In The Design Documentation, Stwior, Bills Of Quantities, Constituting Attachments To This Swz.3. The Contractor Is Obliged To Prepare As-Built Documentation In 4 Copies In Paper And Electronic Version On A Cd And Submit It To The Employer.4. A Detailed Description Of The Conditions For The Performance Of The Subject Of The Contract Is Included In The Draft Provisions Of The Contract Constituting Annex No. 9 To Swz.5. The Scope Of Work Includes: 1) Relocation Of The Porters Lodge From Room 1.2 To Room 1.16, Construction Of An Internal Window In The Ei30 Fire Class, 2) Liquidation Of The Internal Window Opening In The Room No. 1.2 - Bricking Up The Opening In The Rei60 Fire Resistance Class, 3) Inserting The Ei30 Class Fire Door Into The Switchgear Room - No. 1.2, 4) Increasing The Fire Resistance Of The Partitions (Walls And Ceiling) Separating The Switchgear Room To The Rei60 Fire Resistance Class, 5) Sealing The Installation Culverts In The Switchgear Room With Sealing Compounds To The Min. Eis60, 6) Closing The Basement With The Boiler Room And Utility Rooms With Doors In The Ei30 Class - In The Staircase In The E Segment, 7) Raising The Fire Resistance Of The Ceiling Above The Basement To The Rei60 Class By Enclosing The Ceiling From The Bottom With Plasterboard Type Df, 8) Sealing All Installation Passages Passing Through The Walls And Ceiling Of The Underground Storey To Eis60 Class, 9) Closing The Boiler Room With An External Door And In The Fire Class Ei30, Equipped With A Handleless Closure From The Inside, Opening Under Pressure - A Roller Lock, 10) Replacement Of The Internal Door In The Boiler Room With A Door In The Fire Protection Class. Ei30, 11) Equipping The Existing Doors From The Rooms To The Corridor And Staircases With Self-Closers, 12) Ensuring Full Tightness Of The Assembly Of The Combustible Housing Of The Wooden Structure Of The Roof And The Roof Cover By Placing A Second Layer Of Fire-Resistant Plasterboards On The Existing Plasterboard Housing, 13) Implementation Of Inspection Hatches In Housings In The Ei60 Fire Class, Enabling Access To Detectors Located In The Unused Attic Space, 14) Installation Of A Fire Alarm System - Full Protection Of The Building, 15) Modernization Of The Emergency Evacuation Lighting System, 16) Modernization Of The Internal Hydrant System. 6. It Is Allowed To Change The Ceiling Protection Technology To The Rei60 Class - To Other Solutions, Provided That The Contractor Confirms With Documents That He Has Obtained The Rei 60.7 Fire Resistance Class Of The Ceiling. The Works Will Be Carried Out In Accordance With The Design Documentation Developed On The Basis Of The Technical Expertise On Meeting Fire Safety Requirements In A Different Way Than Specified In The Technical And Construction Regulations And Fire Regulations, Regarding The Adaptation Of The Facility To Applicable Fire Safety Standards And The Decision Of The Wielkopolska Province Commander Of The State Fire Service No.: Wz.5595.362.1.2021.Łk, Wz.5595.362. 1.2021.Łk, Wz.5595.362.1.2021.Łk Of November 9, 2021, Which Is A Consent To Meet Fire Safety Requirements In The Building In A Different Way Than Specified In The Applicable Technical And Construction And Fire Regulations.8. Throughout The Period For Which The Agreement Is Concluded, The Contractor Is Obliged To Have A Civil Liability Insurance In The Field Of Activities Related To The Subject Of The Order For The Guarantee Sum Not Less Than Pln 500,000.00 (In Words: Five Hundred Thousand Zlotys 00/100), Valid Not Later Than From The Date Of Signing The Agreement Until The Final Acceptance. The Ordering Party Shall Accept The Document Of Third Party Liability Insurance Held By The Contractor In The Scope Of The Activity Related To The Subject Of The Order For The Guarantee Sum Required By The Ordering Party, Which Will Be Concluded For An Annual Period And Will Be Renewable With Continuity Of Insurance Protection Until The Final Acceptance. In Such A Situation, The Contractor Is Obliged To Provide The Ordering Party With A Valid Third Party Liability Insurance Document Within The Scope Of The Activity Related To The Subject Of The Contract Within 7 Days From The Date Of Issuing This Document At The Latest.9. Work Carried Out During The School Year Will Take Place At A Working Educational Institution. 10. Information On The Use Of Products, Materials And Equivalent Technologies. In The Case Of Names Of Materials Used In The Documentation Of The Procedure, They Should Be Understood As Exemplary - With Parameters Desired By The Ordering Party. This Means That The Ordering Party Allows In Each Case To Use A Material Equivalent In Terms Of The Main (Essential) Technical And Operational Parameters, While Maintaining At Least The Same Level Of Quality, Durability, Functionality And Compatibility With Other Materials Used (Built-In) During The Execution Of The Order. Only Such Changes Of Materials Are Allowed, Which Are Within The Framework Of The Contained Construction, Technological And Technical Solutions. In Such A Situation, The Ordering Party Requires The Submission Of Relevant Documents Confirming The Parameters Of Materials And Devices. If It Intends To Use Any Solutions Or Equivalent Materials, The Contractor Is Obliged To Describe Them In Detail In The Offer And Demonstrate Their Equivalence. In Such A Case, The Contractor Shall Attach To The Offer A List Of Equivalent Solutions Together With Its Description Or Standards. Pursuant To Art. 101 Sec. 4 Of The Public Procurement Law, If The Documents Describing The Subject Of The Contract Contain A Reference To The Standards, Technical Assessments, Approvals, Technical Specifications And Technical Reference Systems Referred To In Art. 101 Sec. 1 Point 2 And Sec. 3 Of The Public Procurement Law, And Such References Were Not Accompanied By The Phrase Or Equivalent, The Employer Allows Solutions Equivalent To Those Described In Each Such Standard, Technical Assessment, Approval, Technical Specification And In Each Technical Reference System. According To Art. 101 Sec. 5 Of The Public Procurement Law, The Contractor Who Refers To Solutions Equivalent To Those Described In The Documents Is Obliged To Prove It By Attaching To The Offer Relevant Evidence Referred To In Art. 104-107 Of The Public Procurement Law, That The Proposed Solutions Meet The Requirements Specified In The Description Of The Subject Of The Contract To An Equivalent Degree. The Offered Devices And Equivalent Materials Must Have The Appropriate Attestations Required By Law Or Admission To Economic Circulation. All Requirements Set Out In The Documents Indicated In The Design Documentation Are The Minimum Requirements, And Their Fulfillment Is Obligatory. Failure To Meet The Above Minimum Requirements Will Result In The Rejection Of The Tender As Inconsistent With The Terms Of The Contract Pursuant To Art. 226 Sec. 1 Point 5 Of The Public Procurement Law11. Requirements For The Employment By The Contractor Or Subcontractor Of Persons On The Basis Of An Employment Relationship 22 § 1 Of The Act Of June 26, 1974 - Labor Code. The Type Of Activities Necessary For The Performance Of The Contract, To Which The Requirements Of Employment On The Basis Of An Employment Relationship By The Contractor Or Subcontractor Apply To Persons Performing Activities During The Performance Of The Contract: Bricklaying, Installation, Insulation, Assembly, Painting Works, As Well As Equipment Operators. Persons, The Employers Rights To Control The Contractors Compliance With The Requirements Related To The Employment Of Persons And The Sanctions For Failure To Meet These Requirements Are Specified In § 6 Of The Draft Provisions Of The Contract (Annex 9 To The Tor).
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
b09f0d66-c868-4ef5-b4f2-0864be336586.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders