Migging Leversen-Moorburg Line. The Project Envisages The Pigging Of A 13 Km Long Pipeline Between Leversen And Moorburg That Was Previously Designed For Dp70 Bar. The Pipeline Is Mostly Built In Dn500, But Also Includes Sections (Approx. 350 M.) In Dn400. In The Past, The Line Was Lowered To 25 Bar And Various Modifications Were Made, Which Cannot Be Proven To Be Designed For 70 Bar. In Addition, There Is No Or Only Insufficient Documentation For Part Of The Line. The Plan Is To Increase The Pressure In This Line To 70 Bar And To Switch To Hydrogen.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.