GTR 67670444
Bids Are Invited For Services Building Condition Assessments-City Of Winnipeg Community Centre-Arenas
ICB — International Competitive Bid
Closed
Northern America
Tender Information
GTR Reference
67670444
Tendering Authority
Subscribe to view
Tender No
0000252663
Financer Name
Self-Funded
Work Title
Bids Are Invited For Services Building Condition Assessments-City Of Winnipeg Community Centre-Arenas
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Northern America
Political Region
Asia Pacific Economic Cooperation APEC,G20,APAC Asia Pacific
Last Date of Bid Submission
01-09-2023
Closed
Work Detail
Services Building Condition Assessments-City Of Winnipeg Community Centre-Arenas . Full Title:Professional Consulting Services - Building Condition Assessments - City Of Winnipeg Community Centre - Arenasd3. Scope Of Servicesd3.1 The Services Required Under This Contract Shall Consist Of Professional Consultingservices For A Comprehensive Building Condition Assessment (Bca) Along With Recommendations Formaintenance, Repairs, Upgrades And Related Construction Cost Estimates Of Nine (9) City Of Winnipegcommunity Centre-Arenas In Accordance With The Following:(A) Review Of Existing Building Data And Maintenance History Documentation For All Disciplinesprovided By The Project Manager And Representatives From Each Building, Site Investigations,Non-Destructive Testing Methods And Meeting With Facility Administration And Key Maintenancepersonnel;(B) The Consultant Shall Prepare A Detailed Report Comprised Of The Following Components:(I) Structural Conditions, Including But Not Limited To Foundations, Floors, Columns,Loadbearing Walls And Building Envelope (Exterior Walls, Exterior Door/Windows, Roofing Structure);(Ii) Thermographic Scanning Of Building Envelope To Observe Temperature Differentials Onbuilding Elevations With Areas That Are Consistent With Air Leakage, Inadequate Insulation Or Wetinsulation;(Iii) Mechanical Components, Including But Not Limited To Heating And Ventilation Systems,Controls, Refrigeration System (Ammonia/Freon Ice Plant), De-Humidification Systems, Domestichot/Cold Water Systems, Sanitary Waste And Vents, Fire Protection, Generator Fuel Systems;(Iv) Electrical Components, Including But Not Limited To Electrical Distribution Systems,Emergency Power, General Lighting, Lighting Controls, Access Control Systems, Fire Egress Signage,Fire Alarm Systems, Elevators And/Or Lifts;(V) Architectural Components, Including But Not Limited To Flooring Materials, Interiorwindows/Doors, Door Hardware, Ceilings, Interior Walls And Millwork;(Vi) Life Safety & Accessibility, Including But Not Limited To Roof Fall Arrest System, Fireextinguishers, Exit Stairwells, Change/Locker Rooms, Washrooms, Universal Washrooms,Elevators/Lifts, Hazardous Materials; And(Vii) Energy Audits, Including But Not Limited To Reducing Energy Consumption, Building Utilitycosts, Existing Peak Electricity And Identify Strategies To Move To Low Carbon Energy Sources.(C) Further To D3.1, The Consultant Team Is Recommended To Attend Two (2) Community Centre-Arenas Site Investigations In Order To Accurately Assess And Document Observations Of Existingconditions;(D) The Nine (9) Community Centre &Ndash; Arenas Which Are Part Of The Rfp No. 570-2023 Include Thefollowing Sites With Applicable Building Areas And Addresses:(I) Allard Arena (30,059 Sf) 80 Allard Avenue(Ii) Dakota C.C. - Sportsplex (65,843 Sf) 1188 Dakota Street(Iii) Garden City C.C. - Multiplex Arena (102,047 Sf) 745 Kingsbury Avenue(Iv) Gateway C.C. - Arena (55,790 Sf) 1717 Gateway Road(V) Glenwood C.C. - Arena (24,771 Sf) 27 Overton Street(Vi) Maples C.C. - Multiplex (27,557 Sf) 454 Adsum Drive(Vii) Richmond Kings C.C. - Arena (24,348 Sf) 666 Silverstone Avenue(Viii) St. Norbert C.C. - Arena (28,097 Sf) 3450 Pembina Highway(Ix) West Kildonan Memorial C.C. - Arena (25,951 Sf) 346 Perth Avenue(E) Consulting Team Personnel Will Be Required To Obtain And Maintain Security Clearances Asidentified In Part E, For The Duration Of The Assignment;(F) Existing Asbestos Containing Material Inventory Listing And Associated Drawings Shall Beprovided To The Successful Bidder By The Project Manager.(G) An Estimate Of The Deferred Maintenance And Update Calculations Of The Facility Conditionindex (Fci), Addressing Existing Deficiencies (Maintenance Needs) Only;(H) An Estimate Of The Requirement Index (Ri) Which Covers A Facility Need Or Deficientconditions That Should Be Addressed, Including Deferred Maintenance, Grandfathered Code Buildingissues And Building Equipment Needs;(I) A Final Draft Copy Of The Complete Detailed Report Is To Be Submitted For Review Andfeedback To The Project Manager And City Of Winnipeg Team Personnel Prior To The Final Deliverable.D3.1.1 The Services Required Under D3 Shall Be In Accordance With The City&Rsquo;S Projectmanagement Manual Http://Winnipeg.Ca/Infrastructure/Asset-Management-Program/Templates-Manuals.Stm#2 And Templates Http://Winnipeg.Ca/Infrastructure/Asset-Management-Program/Templates-Manuals.Stm#4 . Notwithstanding The Foregoing, The Consultant Is Beingengaged By The City For Their Professional Expertise; The Consultant Shall Bring To The Projectmanager&Rsquo;S Attention Any Aspect Of The City&Rsquo;S Project Managementmplates Which The Consultant Is Of The Opinion Is Not Consistent With Good Ry Practice.D3.2 Part A - Building Condition Assessment(A) The Consultant Is To Perform A Comprehensive Building Condition Assessment (Bca) Of Thespecified Buildings. Investigation Shall Be Through Visual, Non-Destructive Site Reviews Andreview Of All Available Supporting Documentation (Drawings, Specifications, Maintenance History). The Purpose Of The Bca Is To Facilitate A Better Understanding Of The True Extent Of Requiredupgrades Of The Specified Buildings. Based On The Age Of The Various Buildings Many Buildingsystems And Components Will Have Exceeded Their Expected Lifespan. This Is A Common Reality Amongthe City&Rsquo;S Building Inventory. The Consultant Is Expected To Document Observed Conditions Andprovide Informed Opinions Regarding A Realistic Remaining Lifespan Of All Building Components.(B) The Assessment Shall Evaluate The Existing Condition Of Architectural, Structural, Mechanicaland Electrical Components, Systems And Services. Note That Where Systems And Services Are Sharedor Interconnected With The Community Centre, It May Be Necessary To Evaluate Areas Occupied By Thecommunity Centre.(C) The Consultant&Rsquo;S Personnel Shall Require And Maintain Security Clearances As Identified Inpart E, For The Duration Of The Assignment.(D) The Content And Format Of The Building Condition Assessment (Bca) Shall Be In Conformancewith &Lsquo;Protocols For Building Condition Assessment&Rsquo; Published By The National Research Council.D3.3 Part B - Code Compliance Review(A) It Is Understood That All Applicable Codes And Standards Have Been Updated And/Or Introducedsince The Time Of The Facilities Construction. For The Purposes Of This Assessment, The Consultantis To Assume That The Intended Future Major Occupancies Within The Facilities Shall Be Group A,Division 3.(B) The Report Is To Provide A Comprehensive Assessment With Respect To Compliance With Presentcodes And Standards Including:(I) Winnipeg Building Bylaw(Ii) Manitoba Building Code(Iii) National Fire Code Of Canada(Iv) National Plumbing Code(V) Csa C22.1 Canadian Electrical Code(Vi) 2015 City Of Winnipeg Accessibility Design Standards (Wads)(C) Similar To The Building Condition Assessment, The Consultant Shall Exercise Professionaljudgement And Discretion In Determining The Feasibility Of Achieving Compliance With Current Codesor Standards. The Purpose Of This Code Compliance Review Is To Identify Existing Conditions Thatdo Not Comply With Current Code(S) And The Extent Of Upgrades Required To Achieve Compliance. Ineach Case, The Consultant Shall Include Applicable Code Reference(S).(D) Compliance With The Wads Applies To All City-Owned And City-Occupied Spaces. The Assessmentshall Identify Any Shortcomings Related To Compliance With This Standard. Compliance With Wads Isconsidered Mandatory, And No Exemptions Or Legacy Clauses (Grandfather Clauses) Shall Apply. Certain Exemptions Will Be Permitted Where It Is &Ldquo;Technically Not Feasible&Rdquo; To Comply. In Suchcases, Solutions Based On &Lsquo;Equivalent Facilitation&Rsquo; May Be Proposed (Refer To 2015 Cwads: P. 25).(E) While Certain Building Code Violations Are Likely To Be Permitted To Continue Under Agrandfather Clause, These Conditions That Represent Risks To Occupant Safety Or Heath Must Not Beignored. Remedial Work To Rectify These Conditions Is To Be Described In The Facility Renewalplan, Complete With Cost Estimates.(F) For Each Non-Compliant Condition, The Consultant Is To Determine:(I) The Degree To Which The Condition Represents A Risk To Occupant Safety (If Any);(Ii) Whether The Condition Will Be Permitted To Remain Under A Legacy Clause. The Consultantwill Be Required To Provide A Detailed Assessment Of Such Conditions. In Cases Where The Winnipegbuilding By-Law Is Not Clear, Consultation And Clarification With The Authority Having Jurisdictionmay Be Necessary;(Iii) Class 4 Estimate Of The Cost For Upgrades Necessary To Achieve Compliance With Presentcode. This Estimate Is To Be Included Regardless Of Whether A Condition Is Likely To Be Permittedunder Legacy Clause.D3.4 The Following Shall Apply To The Services:(A) Universal Design Policyhttp://Clkapps.Winnipeg.Ca/Dmis/Docext/Viewdoc.Asp?Documenttypeid=2&Docid=3604(B) Efficiency Manitoba Energy Audit Program - Ashrae Level 2 Or 3 Audits For Eligible Commercialbuildingshttps://Efficiencymb.Ca/Business/Commercial-Energy-Audit-Program/.D3.5 Part C Facility Renewal Plan(A) With Findings From The Building Condition Assessment (Part A) And The Code Compliance Review(Part B), The Consultant Shall Prepare A Facility Renewal Plan. The Plan Is To Include Aninventory Of The Building Components And Systems Along With An Indication Of Their Respective Ageand Condition. The Assessment For Each Component Shall Include:(I) Installation Date (If Available). If Unknown, Indicate The Approximate Age Of Each Component;(Ii) Estimated Remaining Service Life. Beyond The Date Of Installation And Life Expectancy, This Estimate Should Be Informed By The Present Condition And Maintenance History For Each Component;(Iii) Anticipated Cost For Major Repairs Or Maintenance. The Consultant Is To Identify And Prioritize Repairs Or Maintenance Expenditures Based On Degree Of Importance Andlong-Term Cost/Benefit Evaluation. Recommendations For Required Repairs Or Maintenance Work Shall Be Categorized As Follows:(I) Short Term Recommendations (Within 1-2 Years) &Ndash; High Priority For Repairs And Maintenanceincluding Mandatory Work In Order To Comply With Applicable Codes, Regulatory Issues And Standards.(Ii) Medium Term Recommendations (3-5 Years) &Ndash; Repairs Required To Address Deterioration Ofbuilding Components That Do Not Present An Immediate Safety Hazard And/Or Will Not Result In Asignificant Increase In Deterioration If Deferred.(Iii) Long Term Recommendations (5-10 Years) &Ndash; Repairs Required To Address Ongoing Or Low-Riskdeterioration, Replacement Of End Service-Life Components, And/Or To Improve Durability Of Thebuilding.(Iv) Long Term Considerations/Recommended Improvements (Not Time Critical) &Ndash; Optional Workincluding Recommended Improvements Presented For Future Consideration And Planning.(B) Certain Building Upgrades Will Result In Improved Energy Performance. In Such Instances, Theconsultant Shall Include An Estimate Of The Proposed Payback Period For Consideration.(C) The Consultant Is To Exercise Professional Judgement In Recommending The Cost-Effectivesolutions.D3.6 Part D - Cost Estimates(A) Consultant Shall Prepare Detailed Cost Estimates For Proposed Maintenance, Repairs Andupgrades As Presented In The Facility Renewal Plan.(B) Provide Separate Class 4 Construction Cost Estimates For Maintenance And Repair Work Asidentified In Parts A And B, Summarized In Part C Facility Renewal Plan (D3.5).(C) Costs In Each Estimate Shall Be Presented In Current Construction Market Pricing (Withoutescalation). Present This Information In A Table Format, As Per The Attached Template.(D) All Cost Estimates Are To Be Prepared By A Professional Quantity Surveyor.(E) Class 4 Cost Estimate Classification Shall Be In Accordance With Aace Internationalrecommended Practices.(F) The Services Required Under D3 Shall Be In Accordance With The City&Rsquo;S Project Managementmanual Http://Winnipeg.Ca/Infrastructure/Asset-Management- Program/Templats-Manuals.Stm#2 Andtemplates Http://Winnipeg.Ca/Infrastructure/Asset- Management-Program/Templates-Manuals.Stm#4.Notwithstanding The Foregoing, The Consultant Is Being Engaged By The City For Its Professionalexpertise; The Consultant Shall Bring To The Project Manager&Rsquo;S Attention Any Aspect Of The City&Rsquo;Sproject Managementmplates Which The Consultant Is Of The Opinion Is Not Consistent With Good Industry Practice.D3.7 Part E - Energy Audits(A) Buildings Represent One Of The Largest Sources Of Greenhouse Gas (Ghg) Emissions In Winnipeg, Accounting For 44.4 Percent Of Community-Wide Emissions In 2022. At The Corporate Level, City Facilities Accounted For 34 Percent Of Overall Energy Use And 21 Percent Of Emissions. Most Building Emissions At The Community-Wide And Corporate Levels Come From The Use Of Natural Gas For Heating Purposes.(B) Ourwinnipeg 2045 Sets Out The City&Rsquo;S Climate Target Of Net Zero Emissions By 2050 Which Aligns With Federal And International Targets. The Community Energy Investment Roadmap (Ceir) Identifies City And Community-Wide Systems Level Actions And Investments To Achieve This Updated Target. Ceir Identifies That, After Reducing The Need For Energy And Increasing Energy Efficiency, Electrification Of Buildings Is Key To Meeting Our Climate Targets. Council Directed The Public Service To Implement Ceir In July 2022.(C) The Main Objectives Of The Energy Audits Are To:(I) Reduce Energy Consumption At The Community Centre Arenas Through Various Methods Including Arena Improvements, Equipment Upgrades, Etc.(Ii) Reduce Building Utility Costs.(Iii) Reduce Existing Peak Electricity Demand.(Iv) Identify Strategies To Move To Low Carbon Energy Sources. In Manitoba This Means Movingfrom Fossil Fuel Usage To Electricity.(D) The Consultant Is To Perform An Ashrae Level 2 Energy Audit. The Following Is To Be Included:(I) Facility Description Including, Schedules, Energy Sources And Comfort Or Health Concernsincluding Indoor Environmental Quality (Ieq) Deficiencies.(Ii) Descriptive Information For The Following Components, But Not Limited To:(Iii) Building Envelope(Iv) Overall Enclosure Tightness(V) Hvac(Vi) Domestic Hot Water(Vii) Lighting (Interior And Exterior)(Viii) Plug Loads(Ix) Monthly And Annual Utility Data; A Minimum Of 12 Months Is Required, However Ideally 2-3Years Of Data Should Be Analyzed.(X) Utility Rate Information(Xi) Annual Energy Use Intensity And Energy Cost Index(Xii) Energy End-Use Breakdown(Xiii) Benchmarking(Xiv) Report Low-Cost And No-Cost Recommendations(Xv) Report Potential Capital Energy Efficiency Measure (Eem) Recommendations; Present Asummary Of The Implementation Cost For Each Measure, The Approximate Measure Life, The Simplepayback Period In Years And The Simple Return On Investment (Roi). The Payback And Roi Shouldinclude 2% Escalation On Both Electricity And Natural Gas Along With Carbon Tax With A Continuationof $170/Tonne Of Co2 Beyond The Year 2030.(Xvi) Potential Energy And Carbon Reduction Incentives And Grants From Corporations Such Asefficiency Manitoba And The Green Municipal Fund Etc.(E) Efficiency Manitoba Offer Financial Incentives And Technical Support For Building Owners Thatcomplete Ashrae Level 2 Or 3 Audits For Eligible Commercial Buildings:Https://Efficiencymb.Ca/Business/Commercial-Energy-Audit-Program/. Where Possible, Please Takeadvantage Of The Efficiency Energy Audit Program, However, Please Note That The Energy Auditor Hasto Be A Pre-Qualified Consultant And The Application Must Be Approved Prior To On-Site Assessmentwork.(F) The City Will Provide A Minimum Of 1 Year, Up To 3 Years Of Energy, Demand And Cost Dataalong With The Manitoba Hydro Rate Each Facility Falls Under To The Selected Consultant.(G) It Is Understood That Currently, Electricity Costs More Than Natural Gas. The Cityacknowledges That Transitioning To Electricity May Result In Increased Utility Costs, However, Thecity Is Keen On Exploring Electrification Options That Leverage A Coefficient Of Performance (Cop)Higher Than 1 For Applicable Applications.D3.8 The Funds Available For This Contract Are $450,000.00 (Mrst Included, Gst Extra).
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
2f5538ab-4eaa-4f86-800c-76807789e9ae.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.