GTR 67461561
Tenders Are Invited For Construction Works For The Repair Of Changing Rooms And Public Baths, Located In The Basement Of Building No. 1 Of The Barracks, In The Stawy Military Complex Administered By The 41St Blsz In Dęblin
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
67461561
Tendering Authority
Subscribe to view
Tender No
47/23/P
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction Works For The Repair Of Changing Rooms And Public Baths, Located In The Basement Of Building No. 1 Of The Barracks, In The Stawy Military Complex Administered By The 41St Blsz In Dęblin
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
08-08-2023
Closed
Work Detail
1. The Subject Of The Contract Is Construction Works In The Scope Of Repairing The Cloakroom And Public Bath Rooms, Located In The Basement Of The Barracks Building No. 1, In The Stawy Military Complex Administered By The 41St Training Aviation Base In Dęblin - In The Scope Of The Following Works: Demolition And Preparatory Works; Construction Carpentry Works; Walls And Partitions; Plasters And Facings; Painting Works; Floor And Wall Coverings; Hydraulic Installation Works; Co Installations; Installing Ventilation; Electrical Installation Works; Finishing And Other Works. Construction Works Should Be Performed In Accordance With The Scope And Requirements Specified In The Bill Of Quantities Constituting Annex No. 7 To The Tor (Appendix No. 2 To The Agreement); Detailed Technical Specification For The Execution And Acceptance Of Works, Hereinafter Referred To As Stwior, Constituting Appendix No. 8 To The Tor (Appendix No. 3 To The Agreement) And The Draft Provisions Of The Public Procurement Contract, Which Will Be Included In The Content Of This Agreement (Appendix No. 5 To The Tor). The Contractor Is Also Obliged To Perform Construction Works Not Included In This Documentation, And Without Which The Contract Cannot Be Performed, Taking Into Account The Requirements Of The Technical Conditions For The Execution And Acceptance Of Construction Works, As Well As Their Implementation In Accordance With The Standards And Applicable Regulations. The Subject Of The Order Should Be Performed In Accordance With The Requirements Contained In This Swz And In Accordance With The Attachments Thereto. A Detailed Description Of The Subject Of The Order (Detailed Scope Of Works And Conditions For Their Implementation) Is Contained In The Following Attachments To The Swz: - Detailed Technical Specification For The Execution And Acceptance Of Construction Works - Appendix No. 8; - Bill Of Quantities - Appendix No. 7; - Draft Provisions Of The Public Procurement Contract To Be Introduced Into The Content Of This Contract - Appendix No. 5. For Technological And Social Purposes, The Contractor Undertakes To Use His Own Sources Of Electricity And Water, Or He Will Install Own Cost Water Meter Or Own Electric Switchgear With A Meter (Measuring Devices Should Have A Valid Legalization), Sealed By A Representative Of The Infrastructure Of The 41St Training Aviation Base In Dęblin. For The Utilities Used, Based On The Installed Meters, The Contractor Will Be Charged With Invoices: 1) For Water - Issued By The Employer; 2) For Electricity - By The Administrator - District Infrastructure Board Of Lublin, After Signing The Contract For The Use Of Electricity Or Water. In The Construction Site Handover Report, The Contractor Will Indicate The Option Of Securing Utilities For The Execution Of The Contract. The Guarantee Is Calculated From The Moment Of Signing The Faultless Final Acceptance Protocol Of Construction Works Without Reservations By The Parties. Completion Of The Subject Of The Contract Must End With Signing The Acceptance Protocol Without Reservations By The Parties Within 100 Calendar Days From The Date Of Signing The Contract. , Located In The Basement Of Building No. 1 Of The Barracks, In The Stawy Military Complex, Should Be Carried Out From 7:00 To 15:00 From Monday To Friday, The Need To Carry Out Works On Working Days After 15:00 And On Non-Working Days Should Be Reported At Least 3 Days (Three Days) Before The Commencement Of Works, By A Written Notification By The Contractor Of The Works To The Stawy Warehouse Manager, 3 Rblog Kraków, 08-530 Dęblin, Specifying The Names Of The Persons And The Type Of Equipment. Contractors Interested In A Site Visit Should Report On 26 July 2023 (Wednesday) At 10:00 To The Military Complex Stawy - Dęblin (Main Gate - Pass Office). Pursuant To Art. 131 Sec. 2 Of The Public Procurement Law, The Employer Provides For The Possibility Of The Contractors Carrying Out A Site Inspection. Presence At The On-Site Visit Is Not Required To Submit An Offer. The Contracting Authority Does Not Divide The Contract Into Parts, And Thus Does Not Allow Partial Offers. The Contractor May Submit An Offer For The Full Scope Of The Contract. The Selected Contractor Is Obliged To Conclude A Contract At His Own Expense Insurance And Delivery To The Ordering Party No Later Than On The Date Of The Handover Of The Construction Site In A Protocol: 1) A Paid Civil Liability Policy For The Conducted Activity, Including Also: A) Contractual Liability For Non-Performance Or Improper Performance Of Obligations, B) Pure Financial Losses, And In The Absence Of Other Document Confirming That The Contractor Is Insured Against Civil Liability In The Scope Of Activities Related To The Subject Of This Contract For The Amount Of At Least Pln 200,000 (In Words: Two Hundred Thousand Zlotys); 2) A Paid Construction Site Insurance Policy Against All Risks (Insurance Of Construction And Assembly Risks ). The Remuneration For This Contract Will Be In The Form Of A Lump Sum. The Parties Agree That The Subject Of The Final Acceptance Is The Faultless Performance Of The Subject Of The Order Covered By This Order, Confirmed By The Final Acceptance Protocol. The Employer Will Appoint A Committee And Perform The Final Acceptance. Commencement Of Acceptance Activities Will Take Place Within 7 Days From The Date Of Notification By The Contractor Of Readiness For Acceptance. Completion Of The Acceptance Activities Should Take Place No Later Than On The 14Th Day, Counting From The Date Of Their Commencement. The Contractor Should Attach To The Offer As An Auxiliary And Informative: Offer Cost Estimate. Of The Public Procurement Law). The Contractor In Accordance With Art. 462 Sec. 1 Of The Public Procurement Law May Entrust The Performance Of Part Of The Order To A Subcontractor. In This Case, The Contracting Authority, In Accordance With Art. 462 Sec. Art. 95 Sec. 1 Of The Public Procurement Law, The Employer Requires Employment On The Basis Of An Employment Relationship Throughout The Entire Period Of Performance Of The Subject Of The Contract By The Contractor Or Subcontractor Of Persons Performing The Following Activities During The Performance Of The Contract - All Activities - Physical Work - On The Construction Site Consisting Of Construction Works In The Field Of Repairing Cloakrooms And Public Baths , Located In The Basement Of Building No. 1 Of The Barracks, In The Stawy Military Complex, The Performance Of Which Consists In Performing Work In The Manner Specified In Art. 22 § 1 Of The Act Of 26 June 1974 - Labor Code, I.E.: A) Activities Related To Demolition And Preparatory Works; B) Activities Related To The Performance Of General Construction Works; C) Activities Related To The Performance Of Electrical Works; D) Activities Related To With The Performance Of Sanitary Works The Contractor Or Subcontractor Is Obliged To Employ, On The Basis Of An Employment Contract, During The Period Of Performance Of The Subject Of The Contract, Persons Performing All Activities - Physical Work - On The Construction Site Consisting Of Construction Works In The Field Of Repairing The Locker Rooms And Public Bathhouse, Located In The Basement Of Building No. 1 Barracks, In The Stawy Military Complex. The Employer Does Not Require That The Persons Supervising The Personnel Directly Implementing The Subject Of The Contract On The Part Of The Contractor Are Employed On The Basis Of An Employment Contract (The Requirement Of Employment On The Basis Of An Employment Contract Does Not Apply To The Required: Construction Manager In The Construction And Construction And Works Managers In The Electrical And Sanitary Industries).
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
d91006b8-88bc-4b0f-ae74-e1668447f8bf.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.