GTR 67352441

Tenders Are Invited For Preparation Of Complete Design And Cost Documentation For The Construction Of A Water Treatment Plant

ICB — International Competitive Bid Closed Central Europe
Tender Information
GTR Reference
67352441
Tendering Authority
Subscribe to view
Tender No
Nr ZGK 341.3.2023
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Preparation Of Complete Design And Cost Documentation For The Construction Of A Water Treatment Plant
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
28-07-2023 Closed
Work Detail
1. The Subject Of The Contract Is: Part I: Development Of Complete Design And Cost Documentation For The Expansion And Reconstruction Of The Water Treatment Plant In Czyczkowy, Brusy Commune;2. The Material Scope Of The Design And Cost Estimate Documentation Includes: Part I: 1) Expansion And Reconstruction Of The Water Treatment Plant In Czyczkowy (Plot No. 93) With The Target Capacity Of Qdśr = 520 M3/D, Including The Water Treatment Line With The Treated Water Tank. 2) Basic Technological Line: - Well Casing, Pump, Pipelines, Fittings (Existing No. 2 For Renovation), - New Designed Well No. 3 - Dosing Of Reagents Related To The Process Of Removing Impurities (If Required), - Filtration And Aeration For Iron Removal And Manganese (If Required), - Water Disinfection System, - Treated Water Equalization Tank With A Minimum Capacity Of 300 M3, - 2Nd Degree Pumping Station (Including Pumps For Night And Backup Operation) Ensuring Living Needs And Fire Protection Requirements, - Sanitary And Technological Sewage System Connection With A Pumping Station With Discharge To The Existing Pressure Sanitary Sewage System,  Chemical Warehouse (Ensuring Storage Of Min. 3-Month Reserve), - Power Generator (Ensuring The Operation Of The Suw In An Automatic Cycle), - Installation Of Photovoltaic Cells With Energy Storage. 3) The Station Should Provide Service Rooms For Periodic Maintenance, Including: - Service Room With A Local Control Room, - Sanitary Facility.4) Land Development, Including: - Roads And Yards Within The Station Area, - Replacement Of The Fence, - Alarm Monitoring System (Motion And Opening Sensors), - Lighting, - Access Road With The Arrangement Of Entry From The Existing Public Road, - Replacement Of The Power Connection (If Required), - Connection Of The Sanitary And Technological Sewage System With A Pumping Station With Discharge To The Existing Pressure Sanitary Sewage Network, - Post-Coagulation Sludge And Technological Sewage Tank (If Required), - Sedimentation Plot (If Required),5) Control And Measurement Equipment And Automation - A System Of Full Control And Monitoring Of Equipment Operation Should Be Designed Along With Measuring Equipment Based On A Plc Controller. The System Must Ensure Fully Automatic, Unattended Operation. The Controller Should Be Connected Via A Radio Communication System With The Control Room Located In The Administrative And Social Building Of The Sewage Treatment Plant In Brusy, Ul. Bolta 10. In The Control Room, A Computer Operator Station With An Implemented Scada System For Visualization And Control Of The Wtp Operation Should Be Provided. Radio Communication System With The Existing Base Station Located In The Sewage Treatment Plant In Brusy. For Service Purposes, A Local Operator Panel Should Be Designed, Installed On The Facade Of The I&C Cabinet In The Suw Facility. An Anti-Burglary System And An Access Control System Should Be Included In The Master System. Moreover, The Design Should Take Into Account The Following Assumptions: - All Physicochemical And Microbiological Indicators Of Water After Treatment Should Meet The Requirements Of The Quality Of Water Intended For Human Consumption In Accordance With The Current Regulation Of The Minister Of Health On The Quality Of Water Intended For Human Consumption For Human Consumption. The Station Is To Be Controlled Unattended By Means Of A Water Treatment Technology Management Program With The Possibility Of Viewing And Controlling The Wtw Automatically By Means Of Monitoring In A Separate Control Room At The Wastewater Treatment Plant In Brusy. Devices Operating At The Wtp Should Be Selected, Allowing For Full Automatic Operation With Ad Hoc Supervision Of The Operator. The Czyczkowy Intake Currently Supplies The Following Towns: Czyczkowy, Asmus, Antoniewo, Wielkie Chełmy, Małe Chełmy, Żabno, Brusy Wybudowanie, Czarniz, Kinice, Huta, Rudziny, Kosobudy Wybudowanie, Krównia Wielkie Chełmy, Małe Chełmy, Żabno, Brusy Wybudowanie, Czarniż, Kinice, Huta, Rudziny, Kosobudy Wyróżnienie, Krównia And Serve As A Reserve Intake For The Suw In Męcikale And The Suw In Brusy. 3) The Municipal Management Plant In Brusy Has A Hydrophore Plant With A Deep Well With A Single-Stage Pumping System Located On Plot No. In Appendix No. 5 To Swz) 4) The Exploitation Resources Of The Intake Were Approved By The Voivodship Office In Bydgoszcz In The Amount Of Q = 65.00 M3/H With Depression S = 3.00 M, Decision No. Gpo/Gl 410/130/74 Of March 25, 19745) The Municipal Management Plant In Brusy Has Decision No. Os Ii-9530/25/48/89 Of March 17, 1989 Issued By The Voivodeship Office In Bydgoszcz Approving The Project Covering The Drilling Of Borehole No. 3 To A Depth Of 45.0 M In 20 And 18 Pipes 3. The Scope Of One Set Of Design And Cost Estimate Documentation Includes: 1) Wwtp Water Treatment Concept - 2 Copies 2) Construction And Technical Designs To Be Developed In Accordance With The Regulation Of The Minister Of Development Of September 11, 2020 On The Detailed Scope And Form Of The Construction Design (Journal Laws Of 2020, Item 1609) - In The Amount Of 4 Copies In The Paper Version And In The Electronic Version In The Pdf Format (Cd - 2 Copies). 3) Bill Of Quantities Prepared In Accordance With The Regulation Of The Minister Of Infrastructure Of September 2, 2004 On The Detailed Scope And Form Design Documentation, Technical Specification For The Execution And Acceptance Of Construction Works And The Functional And Utility Program (Journal Of Laws Of 2013, Item 1129) - 1 Copy (Only Electronic Version). The Bill Of Quantities Should Include: Will Be The Amounts For Individual Works, Expenditures For Dismantling Works, Transport, Waste Management (Quantities In Tonnes) And All Other Expenditures Affecting The Lump-Sum Cost Of The Works, Reference To The Technical Specification For Works Execution And Acceptance. Health Protection - Developed In Accordance With The Regulation Of The Minister Of Infrastructure Of September 2, 2004 On The Detailed Scope And Form Of Design Documentation, Technical Specification For The Execution And Acceptance Of Construction Works And The Functional And Utility Program (Journal Laws Of 2013, Item 1129) - 4 Copies (In Conjunction With The Construction Design). 5) Technical Specification For The Execution And Acceptance Of Construction Works, Developed In Accordance With The Regulation Of The Minister Of Infrastructure Of September 2, 2004 On The Detailed Scope And Form Of Design Documentation, Technical Specification For Execution And Acceptance Of Construction Works And The Functional And Utility Program (Journal Of Laws Of 2013, Item 1129) - 2 Copies; 6) Investors Cost Estimate, Developed In Accordance With The Regulation Of The Minister Of Infrastructure Of May 18, 2004 On Determining The Methods And Grounds For Preparing A Cost Estimate Calculation Of The Planned Costs Of Design Works And The Planned Costs Of Construction Works Specified In The Functional And Utility Program (Journal Of Laws Of 2004, No. 130, Item 1389) - 2 Copies Duration Of Its Implementation - 2 Copies. All Studies Should Be Delivered In A Paper Version In The Indicated Number Of Copies And In An Electronic Version In Pdf Format, Saved On A Data Carrier (Cd - 2 Copies). The Investors Cost Estimate Together With The Bill Of Quantities Should Be Delivered In The Ath.4 Format. The Contractor Shall Attach To The Design Documentation A List Of Prepared Studies And A Written Statement That It Is Made In Accordance With The Contract And Complete From The Point Of View Of The Purpose It Is To Serve.5. At The Request Of The Employer, The Contractor Is Obliged To Update The Cost Estimates Free Of Charge Until The Investment Is Completed, But Not Longer Than 3 Years From Obtaining The Final Decision On The Building Permit.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
7b2d7595-8860-46b7-9a2f-5f52f72580e2.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders