GTR 67259560

Tenders Are Invited For Renovation Of Part Of Building No. 3 In The Military Complex At Al. 3-Go Maja 2-4 In Chełmno - Case Number 53/2023

ICB — International Competitive Bid Closed Central Europe
Tender Information
GTR Reference
67259560
Tendering Authority
Subscribe to view
Tender No
53/2023
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Renovation Of Part Of Building No. 3 In The Military Complex At Al. 3-Go Maja 2-4 In Chełmno - Case Number 53/2023
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
31-07-2023 Closed
Work Detail
The Subject Of The Contract Is The Renovation Of A Part Of Building No. 3 In The Military Complex At Al. 3-Go Maja 2-4 In Chełmno, In Accordance With The Requirements Set Out In The Contract And A Detailed Description Of The Subject Of The Contract And Its Scope Contained In The Technical Specification For The Execution And Acceptance Of Works (Stwiorb) And Design Documentation, Including The Bill Of Quantities. The Facility In Which The Works Will Be Carried Out Will Be Open For The Duration Of Their Execution, Excluding The Part Of The Building Where The Works Will Be Carried Out. All Construction Works Must Be Organized And Carried Out In Such A Way As To Ensure Safety For People Staying In The Complex, Building And Uninterrupted Use Of The Building. Scope Of The Subject Of The Contract: ►Sanitary Works: Replacement Of The Water And Sewage System; Replacement Of Sanitary Facilities; Replacement Of Radiators And Central Heating Pipes; ►Electrical Works: Replacement Of Wires, Sockets And Connectors; Replacement Of Lighting Fixtures; Assembly Of Switchgear Boxes; ►Construction Works: Disassembly And Demolition Works; Replacement Of Door Joinery; Replacement Of Window Joinery; Masonry Works; Vertical And Horizontal Damp Insulation Of Rooms; Installation Of Sewage And Water Risers With Plasterboards; Chipping Off Old And Making New Internal Plasters; Laying Wall And Floor Tiles; Laying Floor Coverings; Painting Works On The Surface Of Walls And Ceilings With Prior Application Of Gypsum Plasters; Removal And Disposal Of Construction Waste And Scrap. ►The Scope Of Works Also Includes Accompanying Works Consisting In Lighting The Work Site, Securing The Work Site With Warning Signs, Construction And Maintenance Of Construction Site Facilities, Marking And Securing Installations And Devices On The Work Site. The Contractor Shall Implement The Above With His Own Efforts And At The Price Of The Contract. ►The Contractors Remuneration For The Performance Of The Subject Of The Order Is Determined In A Cost Estimate Manner, According To The Price Indicated In The Contractors Offer. ►The Contractor Provides All Materials And Equipment Necessary To Perform The Subject Of The Contract On Its Own And At Its Own Expense, And Is Obliged To Use Construction Products In Accordance With The Technical Specification For The Execution And Acceptance Of Works And Approved For Use By The Act Of July 7, 1994 Construction Law ( Journal Of Laws Of 2023, Item 682, Consolidated Text), With Valid Attestations And Certificates Allowing For Their Use. ►The Contractor Is Obliged To Perform Works In Accordance With The Construction Art And Construction Standards, Applicable Regulations And Technical And Technological Standards, While Maintaining Applicable Health And Safety Regulations. ►Transportation Of All Materials And Equipment To The Site Of The Works And Their Operation Are The Responsibility Of The Contractor. ►The Contractor Is Obliged To Ensure, On His Own, The Collection And Disposal Of Waste (Garbage, Rubble, Etc.) In Accordance With Applicable Law, In Particular The Act On Waste (Article 3(1)(32) Of The Act On Waste Of December 14, 2012, Journal Of Laws Of 2022, Item 699, As Amended) And Documenting These Activities. The Contractor (Or His Subcontractor) Should Be Authorized To Obtain Permits Under The Waste Act And Meet The Requirements Of The Waste Act Of 14 December 2012 (Journal Of Laws 2022, Item 699, As Amended). ►The Contractor Is Obliged To Collect And Remove The Scrap Obtained During Construction Works. The Scrap Obtained From The Disassembly On An Ongoing Basis Should Be Immediately Weighed In The Presence Of The Supervision Inspector On The Side Of The Employer. Removal Of Scrap From The Construction Site Will Be Possible After A Written Notification And Approval Of The Document By The Supervision Inspector. ►The Employer Requires The Contractor Or Subcontractor To Employ Persons Performing General Construction Works Under An Employment Contract - The Performance Of These Activities Consists In Performing Work In The Manner Specified In Art. 22 § 1 Of The Act Of June 26, 1974 - Labor Code (Journal Of Laws Of 2022, Item 1510, Consolidated Text). The Contractor Or Subcontractor Is Obliged To Employ Persons Under An Employment Contract At Least For The Duration Of The Contract Concluded Between The Contractor And The Employer - Art. 95 Of The Public Procurement Law
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
6581c854-2fc4-4f39-9a78-178918e06937.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders