GTR 67100351

Corrigendum - Quotation Are Invited For K51 And K52 Unit Dfo System Painting Work

NCB — National Competitive Bid Closed Asia
Tender Information
GTR Reference
67100351
Tendering Authority
Subscribe to view
Tender No
2332301447
Financer Name
Self-Funded
Work Title
Corrigendum - Quotation Are Invited For K51 And K52 Unit Dfo System Painting Work
Bid Type
NCB — National Competitive Bid
Country
Subscribe to view
Geographical Region
Asia
Political Region
Arab World,Gulf Cooperation Council GCC,Middle East,Middle East and North Africa MENA
Last Date of Bid Submission
12-07-2023 Closed
Work Detail
Quotation Are Invited For K51 And K52 Unit Dfo System Painting Work. Surface Preparation And Protective Coating Of Dfo Filter Skids And Its Ancillaries Including Structure At #K# Stations, Jebel Ali T Echnical Specification 1.0#Scope Of Work For Dfo Pipeline At K Station: (Hydro Blasting & Painting) ·#The Scope Includes Provision F Or Carrying Out The Painting Work, Site Preparation, Surface Preparation By Hydro Jetting To Wj2/Sc1 Standards As Per Sspc Sp 12/Nac E No 5, Supply & Application Of Most Suitable Protective Coatings As Per Existing Coating System, On External Surfaces Of Dfo Filter S Skids And Its Ancillaries Including, Structures, Ladders, And Handrails Of ·#Supply Of Uhp Wj Machine (Pressure Above 25000Psi) An D Its Accessories, Any Temporary Water Storage Equipment, Cleaning Agents, All Applicable Coating Materials, Application / Inspectio N Tools & Equipment And All Required Consumables Including Tarpaulin/Plastic Sheets To Protect Sensitive Equipment From Spill/Splash Of Jetting And Painting Materials To Be Provided By Contractor. ·#The Contractor Shall Visit The Site And Make Himself Fully Famili Ar With The Work Scope, Plant Access, Facilities, Complexities, Etc., Before He Submits His Quotation. Dewa Will Not Accept Any Clai M For Extras Beyond The Order Rates / Prices During And After The Execution Of Work Ordered. ·#Joint Inspection To Be Carry Out Of C Omplete Skids Including Dfo Pipelines, Equipment(Like Valves, Tanks, Fitter Vessels, Etc.), Skid Supports Structures, Platforms, Han Drails, Ladders, Grating Etc. Following The Cleaning & Before Apply The Paint/Coatings To Ensure No Corrosion Damages, Which Need To Repair / Replace By Dewa. ·#Covering Of Actuators, Impulse Lines And Cables By Tarpaulin Or Any Other Protective Covers To Avoid Da Mage During Hydro Blasting. ·#Covering Of Flange-To-Flange Joints With Ceramic Tape To Avoid Water Ingress In The Gasket Seating Are A. ·#Degrease The Surface If Required As Per Sspc -Sp01 Standards. ·#Complete Removal Of The Existing Coating To Bare Metal By Hydro Jetting To Wj2/Sc1 (Waterjetting-2/Surfacecleaniness-1) Standards As Per Sspc Sp 12/Nace No 5. ·#Manual Cleaning Using Hand And Pow Er Tools (Only By Pneumatic And Non-Spark Tools) Wherever Necessary And At Non-Reachable Areas. ·#Arrangement Of Water Tanker And Wa Ter Storage Tanks To Store Water Required For Hydro Blasting. ·#Arrangement Of Air Compressor For Hydro Blasting And Painting.(Durin G Tsd Service Air Will Not Be Available. Contractor Must Bring Their Own Compressor Required For The Job.) ·#Application Of Complete Coating In Compliance With Existing Coating For All Components Under This Scope. ·#Party Has To Repaint/Remark The Direction And Th Ickness Measurement Points On The Pipeline As Per Existing. ·#Stage Wise Coating Inspections And Quality Assurance At The Completion Of Each Activity. ·#Preparation Of Checklists And Reports At The Beginning, During, And End Of Each Activity. ·#Removal Of The Tarp Aulin Or Any Other Protective Covers From The Actuators, Impulse Line, And Cables. ·#Handing Over The Final Report With All Checklis Ts To The Concerned Dewa Engineer. 2#Physical Boundary And Volume Of The Contract S. No#Unit#Description#Approximate Area (M²)# 1# Unit 51#Gt 51 Dfo Coalesce Filter Vessel (4 Nos), Pipes, Steel Structural Supports, Frames, Handrails, Ladders, And All The Steel A Ncillaries Attached With The Skids#350M²# 2# Unit 52#Gt 52 Dfo Coalesce Filter Vessel( 4 Nos), Pipes, Steel Structural Supports, Fra Mes, Handrails, Ladders, And All The Steel Ancillaries Attached With The Skids#350M²# 2.1#For K Station Dfo Pipeline And Its Skids Including, Equipment (Dfo Coalescer Fitter Vessels (8 No, Valves, Etc.), Steel Structural Supports, Frames, Handrails, Ladders, An D All The Steel Ancillaries Attached With The Skids And Pipelines In Unit 51&52. Qty: 1 K51 And K52 Unit Dfo System Painting Work Standard Terms & Conditions 1) Prices Should Be Ddp Delivery Duty Paid At Dewa Stores. 2) Quotation To Be Submitted Only In Local Currency U.A.E Dirhams 3) Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material 4) No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company, And Your Participation In Dewa Tenders / Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest. Supplier Registration: Https://Srm.Dewa.Gov.Ae/Irj/Portal/Anonymous/Regis Tender Link : Https://Www.Dewa.Gov.Ae/Api/Rfxdownload/Get/2332301447
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
8fcf1009-be63-44ea-95c4-c335fe229380.pdf
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders