GTR 66966035

Tenders Are Invited For Creating A Network Of Sheltered Housing.

ICB — International Competitive Bid Closed Central Europe
Tender Information
GTR Reference
66966035
Tendering Authority
Subscribe to view
Tender No
BGN.271.2.7.2023
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Creating A Network Of Sheltered Housing.
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
20-07-2023 Closed
Work Detail
Description Of The Subject Of The Contractdetailed Description Of The Subject Of The Contract: Creating A Network Of Protected Flats. As Part Of The Task, Two Apartments Were Renovated. Flat No. 1 Creating A Network Of Sheltered Flats - Pniewy, Ul. Wroniecka 43/5.” The Planned Renovation Includes Construction Works Aimed At Adapting The Apartment To The Needs Of People With Disabilities. As Part Of The Task, In Accordance With The Task Documentation, The Following Actions Should Be Performed: A) Disassembly Of The Existing Partition Walls From Two Layers Of Boards, Wall And Floor Linings; B) Disassembly Of The Bathtub, Sink, Kitchen Sink, Toilet, Steel Gas Heater; C) Forging A New Entrance Opening With The Installation Of A New Entrance Door Inside The Staircase; D) Bricking Up The Old Door Opening; E) Renovation Of The Bathroom - Replacement Of Water And Sewage Systems, Replacement Of Doors, Installation Of A Linear Drain, Installation Of Bathroom Fittings, Installation Of Handrails For The Disabled With A Seat ; Wall And Floor Linings; F) Replacement Of The Electrical System; G) Filling, Painting; H) Installation Of Pvc Flooring In The Room With A Kitchenette; I) Ventilation; J) Removal And Disposal Of Demolition Materials. Protected – Pniewy, Ul. Wolności 9/5”: A) Demolition Of The Existing Partition Walls, Wall And Floor Linings, Floor Layers, Stoves And Cores, A Fragment Of The Ceiling Above The Basement Room; B) Disassembly Of The Shower, Sink, Kitchen Sink, Toilet; C) Change Of The Functional Layout Of The Premises D) Execution Of An Accessible Bathroom - Replacement Of Water And Sewage Systems, Replacement Of Doors, Execution Of A Linear Drain, Installation Of Bathroom Fittings, Installation Of Handrails For The Disabled With A Seat; Wall And Floor Linings; E) Liquidation Of The Basement, New Floor Layers; F) Thermal Insulation Of The Ceiling Above The Ground Floor; G) Replacement Of Windows And Doors; H) Replacement Of The Electrical System; In The Premises, K) Puttying, Painting; L) Laying The Pvc Floor Covering In The Room With A Kitchenette; M) Ventilation; The Scope Also Includes: 1) Participation Of People With Skills And Knowledge In The Field Of Construction, Electrical And Sanitary Industry, Additionally Authorized To Perform Individual Functions In The Construction Industry - To Manage Works In The Construction, Electrical And Sanitary Industry, Including A Construction Manager Authorized To Manage Construction And Construction Works - Construction, 2) Preparation Of The Acceptance Documentation In Accordance With § 7 Sec. 9 Point 3 Of The Contract. Before Submitting The Offer, The Potential Contractor Is Obliged To Visit The Site In Order To Familiarize Himself With The Circumstances Affecting The Offer. The Facilities Covered By The Procedure Are Publicly Available. A Detailed Description And Scope Of The Contract Are Included In The Technical Documentation - Appendix 6 To The Swz. By Submitting An Offer, The Contractor Undertakes To Perform The Contract Described In The Design Documentation. All Documents Describing The Subject Of The Contract (Construction And Executive Design, Bill Of Quantities) Should Be Treated As Mutually Complementary And Explanatory In The Sense That In The Event Of Any Ambiguity Or Ambiguity, The Contractor May Not Limit Either The Scope Of His Obligation Or The Scope Of Due Diligence In Performing His Obligations Arising From The Public Procurement Contract And Any Requirement Contained In One Of These Documents Is As Binding As If It Appeared In All Documents. Constituting The Description Of The Subject Of The Contract, The Trade Name Of The Company, Goods Or Product Is Indicated, The Ordering Party - In Relation To The Parameters Or Data (Technical Or Any Other) Indicated Directly In The Documentation Of The Procedure, Directly Or Indirectly Identifying The Goods Or Product - Allows Equivalent Solutions In Accordance With With The Technical Data And Parameters Contained In The Above-Mentioned Documentation. Equivalent Solutions Should Be Understood As Solutions Characterized By Parameters Not Worse Than Required. If The Ordering Party Allows Equivalent Solutions, But Does Not Specify The Minimum Parameters That Would Confirm This Equivalence - The Contractor Is Obliged To Offer Products That Have At Least The Same Or Better Standards And Technical Parameters; Qualitative, Functional, Will Be The Same Thematically And For The Same Purpose, And Will Not Lower The Standards Specified In The Description Of The Subject Of The Contract. In The Case Of Using Equivalent Replacement Materials Or Devices, Their List Together With Technical Parameters Should Be Attached To The Offer.1. General Requirements: 1) The Contractor Is Obliged To Perform Construction Works In Accordance With The Construction Art, Applicable Regulations And Standards, And In Compliance With Health And Safety Regulations, With The Maximum Limitation Of The Nuisance Of Carrying Out Works Carried Out At The Contracting Authoritys Premises. The Contractor Also Guarantees The Execution Of The Subject Of The Contract Under The Supervision Of Persons With The Required Professional Preparation To Perform Independent Technical Functions In The Construction Industry. For A Safety Mark, Declarations Of Conformity Or Certificates Of Compliance With The Polish Standard. 3) The Contractor Shall Secure The Construction Site, Having Regard In Particular To The Employers And His Own Property, In Particular The Contractor Is Obliged To Secure Devices, Equipment And Materials At His Own Expense. 4) The Contractor During The Execution Of The Works Is Responsible For The Safety Of Its Employees And Other Persons Within The Area Of ​​The Transferred Construction Site For The Works Carried Out. For The Materials Used, Documentation Regarding The Construction Works Performed.6) For The Duration Of The Contract, The Contractor Must Have A Civil Liability Insurance In The Scope Of The Business Conducted In The Amount Of At Least Twice The Gross Offer Price. Proof Of Payment Of The Premium Due. For Damage/Destruction. In The Event Of Any Damage Caused By The Fault Of The Contractor, He Is Obliged To Inform The Ordering Party And Repair The Damage At His Own Expense And On His Own Responsibility Before The Date Of Final Acceptance, If It Is Feasible Within This Period. 8) After Completion Of The Works, But Before The Final Acceptance By The Ordering Party, The Contractor Is Obliged To Tidy Up The Area Of ​​The Works.2. Requirement Of Employment Under An Employment Contract. Pursuant To Art. 95 Sec. 1 Of The Act, The Employer Does Not Require The Contractor Or Subcontractor To Employ Persons Performing Work Covered By The Subject Of The Contract On The Basis Of An Employment Relationship, If The Performance Of These Activities Consists In Performing Work In The Manner Specified In Art. 22 § 1 Of The Act Of 26 June 1974 - Labor Code: This Requirement Applies To Persons Who Perform Activities Directly Related To The Performance Of Works, I.E. The So-Called Manual Workers Performing General Construction Works. The Requirement Does Not Apply To E.G. The Following Persons: Construction Managers, Contractors, Suppliers Of Building Materials. In The Event Of Termination Of Employment Before The End Of The Order, He Undertakes To Immediately Hire Another Person To Replace It, If It Is Necessary To Maintain The Continuity Of Works. Method Of Documenting Employment Within 5 Days From The Date Conclusion Of The Contract, During The Execution Of The Order, At Each Call Of The Ordering Party, Within The Time Limit Set In This Call, The Contractor Shall Be Obliged To Submit To The Ordering Party: - A Statement Of The Employed Employee, Or - A Statement Of The Contractor Or Subcontractor On Employment Under An Employment Relationship Of Persons Performing The Above-Mentioned Activities, Or - A Certified True Copy Of The Employment Contract Of The Employed Employee, Or - Other Documents Containing Information, Including The Name And Surname Of The Employed Employee, Date Of Concluding The Employment Contract, Type Of Employment Contract, Scope Of Duties Of The Employee.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
0d4a4b19-6b75-4487-b27c-b055e882d6b6.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders