Tenders Are Invited For Demolition Of The Retaining Wall And Construction Of The Retaining Wall With Fencing And Drainage On Plot No. 309, Located In The District Of Possibly Żegiestów, Commune Muszyna.
Tenders Are Invited For Demolition Of The Retaining Wall And Construction Of The Retaining Wall With Fencing And Drainage On Plot No. 309, Located In The District Of Possibly Żegiestów, Commune Muszyna.
General Description Of The Subject Of The Contract: The Subject Of The Contract Is The Implementation Of The Investment Entitled: Demolition Of The Retaining Wall And Construction Of The Retaining Wall With Fencing And Drainage On Plot No. 309, Located In The District Of Possibly Żegiestów, Commune Muszyna. Detailed Description Of The Contract: The Material Scope Includes Construction Works To Be Carried Out On The Basis Of The Decision Of The Nowy Sącz Starost No. 2277/2021, Reference Number: Bud.6740.2422.2021 Of 06.12.2021. On A Building Permit For An Investment Involving The Demolition Of A Retaining Wall And Construction Of A Retaining Wall With Fencing And Drainage On Plot No. 309, Located In The District Of Possibly Żegiestów, Commune Muszyna - As Part Of The Investment Project Entitled: Renovation Of The Fence Of The Primary School In Żegiestów. This Task Includes The Construction Of A Retaining Wall To Support The Ground Pressing On The Side Of The Sports Field, And A Drainage Drainage Will Be Made From The Side Of The Sports Field, Which Will Protect The Wall Structure From Degradation And Will Regulate The Soil And Water Relations On The Plot, Possibly No. 309. The Height Of The Wall Is Variable, Depending On The Terrain Conditions. The Retaining Wall Will Be Covered With Anti-Moisture Insulation In Places Where It Meets The Ground And Painted With Gray Concrete Paint In Exposed Places. In Place Of The Degraded Concrete Wall, A New Reinforced Concrete Retaining Wall Is Planned With The Following Parameters: - Wall Thickness 25 Cm; - Total Height Variable Depending On The Cross-Section From 175 Cm To 280 Cm; - Total Length 83.0 M; - Foundation At A Depth Of 1.20 Below The Ground Level From The Side Of The Road; - Foundation Width 1.3 M; - Reinforced Wall. Construction And Maintaining Order At The Construction Site, B) Developing And Submitting To The Employer The Cost Estimate And The Material And Financial Schedule No Later Than On The Date Of Signing The Contract, And Introducing Changes To The Material And Financial Schedule In Accordance With The Employers Guidelines. Updating And Changing The Material And Financial Schedule Do Not Require The Preparation Of An Annex To The Contract, C) The Schedule Of Construction Works Should Be Agreed With The Employer. , Declaration Of Compliance With Pn, E) Keeping The Area Around The Site Of Construction Works Free Of Traffic Obstacles, F) Complying With Applicable Health And Safety And Fire Protection Regulations During Construction Works, G) Completing And Presenting To The Employer Documents Allowing For The Assessment Of The Correct Performance Of The Subject Of The Contract , And In Particular The Provision Of The Documents Referred To In §10 Of The Agreement, H) Enabling The Ordering Party To Inspect The Implementation Of The Subject Of The Agreement At Any Time, Including The Progress In The Implementation Of Construction Works Or Technical Documentation, Materials Used In Their Course And All Circumstances Regarding The Implementation Of The Subject Of The Agreement, I) Providing The Employer And All Persons Authorized By The Employer With Access To Any Place Where Construction Works In Connection With The Contract Will Be Or Are Being Performed, J) Tidying Up The Place Of Construction Works After Their Completion. Will Act As A Coordinator Of Subcontractors During The Performance Of The Subject Of The Agreement Or The Removal Of Any Defects. The Contractor Bears Full Responsibility Towards The Ordering Party For The Subject Of The Agreement, Which He Performs With The Help Of Subcontractors. The Contractor Is Responsible For The Actions Or Defaults Of Each Subcontractor, Supplier Or Third Party/Persons He Will Use In The Performance Of The Subject Of The Agreement As For His Own Actions And Omissions. Implementation Of The Task. M) Development Of The Construction Site At Its Own Expense, Including Securing The Supply Of Utilities And Incurring The Costs Of These Utilities, Including In Particular: - Water Supply And Sewage Disposal, - Electricity Supply, - Telephone Communication, - Temporary Access Roads To The Construction Site - Other Necessary Back-Up Facilities And Related Services, N) Securing (For The Duration Of The Works And Ultimately) The Existing Technical Equipment And Geodetic Signs Within The Works. Repairing Them And Bringing Them Back To Their Previous Condition. P) Ensuring The Continuity Of Operation Of The Relocated Networks In A Manner Agreed With The Entities Managing The Given Network. Q) Keeping Photographic Documentation Showing The Progress Of The Works, Taking Into Account The Works Specification. Construction Works, And Prior To The Final Acceptance, As Well As Restoring And Tidying Up The Occupied And Adjacent Land To At Least The Condition From Before The Construction Works, Including The Possible Reconstruction Of Pavements Along With The Surface Of Access Roads (Areas Damaged During The Execution Of Works). S) Preparation Of As-Built Documentation In Accordance With Provisions Of Law Along With A Set Of Attestations, Certificates And Declarations Of Conformity For The Built-In Materials And Devices.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.