Bord Na Móna Have A Requirement To Refurbish The Electrical Installation Within Cuil Na Móna Workshop, Building 6. This Existing Workshop Constructed In The Early 80’S Requires A Complete Electrical Installation Refurbishment. It Is Intended To Strip Out All Existing Electrical Services And Maintain Containment As Much As Possible. The Contractor Will Be Responsible For The Strip Out And Installation Of The New Electrical Services. The Site Is Supplied From An Existing Bord Na Móna Switch Room Which Will Remain In Place Unaffected By The Works. The Contractor Will Be Responsible For All Certification For The Electrical Installation.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.