GTR 66861855
Tenders Are Invited For Construction Work In The Scope Of 2 Parts: Part. 1 - Renovation Of Building No. 17 In The Military Complex In Hrubieszów; Vol. 2 - Renovation Of Sanitary Facilities In Building No. 3 In The Military Complex In Hrubieszów.
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
66861855
Tendering Authority
Subscribe to view
Tender No
ZP/TP/31/2023
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction Work In The Scope Of 2 Parts: Part. 1 - Renovation Of Building No. 17 In The Military Complex In Hrubieszów; Vol. 2 - Renovation Of Sanitary Facilities In Building No. 3 In The Military Complex In Hrubieszów.
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
19-07-2023
Closed
Work Detail
The Subject Of The Contract Is Construction Work In The Scope Of 2 Parts: Part 1 - Renovation Of Building No. 17 In The Military Complex In Hrubieszów; - Disassembly Of External Door Joinery; - Disassembly Of Window Grilles, Steel; - Demolition Of Plastic Floors, Ceramic Tiles; - Chipping Old Concrete Sleepers; - Forging Terrazzo Windowsills From The Wall Throughout The Building; - Reflection Of Internal Plasters From Cement-Lime Mortar; - Disassembly Of The Ceramic Tiles In The Sanitary Facilities; - Removal Of Post-Demolition Materials - Wood, Rubble, Ceramics, Tiles, Etc.; - Transport Of Scrap Steel To The Soi Gz Hrubieszów Warehouse. B) General Construction Works: - Cutting Holes In The Walls Of Ceramic Bricks With Cement .-Wap For The Door Joinery (1 Item) - Walling Up The Openings After The Door Frames Have Been Cut Out (1 Item); - Adding A Solid Brick Partition Wall In The Bathroom To The Full Height Of The Room; - Lintels In The Internal Walls (1 Door Opening); Placing Window Sills Made Of Stone Conglomerates (12 Pcs.); Up To Full Height; - Facing The Wall Of The Social Room With Glazed Tiles Up To 1.40 M High; 13 Mm; - Installation Of Light Ltt Partition Walls Made Of Hpl Board, Thickness. 13 Mm In The Guard Commanders Room And In The Rest Room (Separation Of Some Rooms); - Wrapping The Windows In The Sanitary Room With Milk Foil (Full Height Of The Glass), Wrapping The Windows With Milk Foil In Other Rooms To Ensure That No View Is Possible - Glazing Glass Up To 2/3 Of The Window . Execution Of Furniture In The Social Room, Standing Construction With Dimensions Specified In The Bill Of Quantities (Built-In With A Sink), Assembly Of A Hanging Cabinet Above The Standing Built-In. C) Floors: - Execution Of A Cement Floor Smoothed Sharply (Underlay Made Of Compacted Sand On The Ground, Concrete Underlayment, Anti-Moisture Insulation Made Of Wide Pe Foil, Thermal Insulation Made Of Foamed Polystyrene Boards; Cement Floor) - Execution Of Floors Made Of Tiles (Gres) With Dimensions Of 30X30 Cm, Including Plinths. 200 (5 Pcs.) - Delivery And Installation Of Steel Interior, Single-Leaf, Bathroom Doors With Ventilation Sleeves And A Steel Door Frame Covered In The Color Of The Door Leaf, Clear Dimensions Of The Door Frame 90/200 (2 Pcs.) - Delivery And Installation Of Single-Leaf External Doors With A Metal Door Frame , Rc3 External Doors (2 Pcs.) According To Specification, Clear Frame Dimensions 100/200); ; Delivery And Assembly Of External Aluminum Inspection Doors (1 Pc.) According To The Specification, The Size Of The Opening To Be Secured Is 1.30X0.80 M); Ordinary Category Iii Of Cement-Lime Mortar On The Walls; - Preparation Of Walls For Painting, Leveling The Walls With Leveling Of Irregularities; - Protection Of Convex Corners With Metal Corners; - Priming - Strengthening The Substrate With Preparations; - Double Painting Of Internal Plasters Of Walls And Ceilings With Latex Paint; F) Installation Of Steel Grilles: - Installation Of Window Grilles In The Rooms Of The Guardhouse (11 Pcs.), Including One Openable Window Grille (In The Room Indicated By The Employer), Grilles Made According To The Specification; - Installation Of Window Grilles In The Sanitary Facilities (1 Pc.), Grilles Made According To Specification; - Repair And Painting Of Window Reveals Before Inserting Steel Gratings; - Installation Of Grilles Protecting Ventilation Openings In All Rooms, Gratings Made According To The Specification - Gratings 35X35 Cm; - Installation Of Gratings Securing Entrances To The Attic Of The Building (2 Pieces), Made According To Specification.Ii. Sanitary Worksa) Water And Sewage System, Sanitary Devices - Disassembly Of A Washbasin; - Disassembly Of A Toilet With A Porcelain Bowl; - Disassembly Of A Washbasin Battery; - Disassembly Of The Internal Water And Sewage System; - Construction Of Plastic Pipelines With Welded Connections; (Hot And Cold Water Installation) ), Execution Of Inlet Connections To The Faucet;- Installation Of A Porcelain Washbasin, Washbasin Faucet;- Execution Of Sewage Pipelines (Pvc) With Push-In Connections And Outflow Connections To Sanitary Devices, Venting Of The Sewage System;- Installation Of A Compact Toilet Bowl;- Installation Of A Linear Outflow In Shower Cabin;- Installation Of A Shower Faucet With A Sliding Shower;- Installation Of A Tap With A Diameter Of Nominal 20 Mm;- Installation Of A Plastic Drain.- Replacement Of The Sewage Connection To The Building;- Installation Of A Pvc Sewage Chamber With A Diameter Of 600 Mm (Right And Left Inlet Base). B) Gravitational Ventilation Execution Of Gravitational Ventilation Ducts Made Of Flexible Pvc Pipes Connected By Push-Fit; Insulation Of Ventilation Ducts (Polystyrene Insulation); - Installation Of Axial Fans With A Diameter Adapted To The Ventilation Duct In The Sanitary Facilities (2 Pcs.); - Installation Of Ventilation Chimneys On The Roof (2 Pcs.). Iii. Electrical Worksa) Replacing The Connection - Excavation 80 Cm Deep In The Soil Category Iii; - Laying The Cable On The Pole With A Pipe Casing Adapted To The Diameter Of The Cable; - Making A Layer Of Compacted Sand For Laying The Cable; - Manual Laying Of Cables In Cable Trenches, Covering The Cable With Foil Blue Signaling; Parallel Arrangement Of The Hoop Iron; - Backfilling The Trenches: Covering With A 10 Cm Layer Of Sand, Backfilling The Trench With Native Soil; - Mounting The Power Supply Cabinet (Cable Connector) With The Use Of Polyester Casings; Installation Of The Main Power Switch. - Disassembly Of The Existing Overhead Connection. B) Disassembly Of The Old Electrical Equipment - Disassembly Of The Old Halogen Lighting Fixtures; Removal Of 230V Sockets; - Installation Of A New R-Box Switchgear (In Place Next To The New Cable Connector) Forging Grooves For Plug-In Wires In Solid Brick Walls, Making Passages Through The Walls (Groove Dressing); - Installation Of Flush-Mounted Installation Boxes With A Diameter Of 60 Mm; Flat Cable, Total Cross-Section Of Cores Up To 7.5 Mm2, Laid In Plaster [N2xh-J 3X2.5 Mm2 Cable] – Making Additional Circuits. Flat Cable, Total Cross-Section Of Cores Up To 7.5 Mm2, Laid In Plaster [N2xh-J Cable J 3X1.5 Mm2] – Additional Lighting. Round Cable, Total Cross-Section Of Wires Up To 7.5 Mm2, Laid On A Surface [Hgds Cable 5X1.5 Mm2]; D) Installation Of Installation Accessories, Installation Of Single And Double Flush-Mounted Installation Connectors, In An Installation Box With Connection; Installation Of Double And Single Plug Sockets With Connection [Sockets P/T 2X2p+Z 10/16A 230V Ip20, Sockets P/T 2P+Z 10/16A 230V Ip20]; Installation Of Single Splash-Proof Sockets 2P+Z 10/16A 230V Ip44].E) Installation Of Lighting Fixtures - Installation In A Suspended Ceiling Of Lighting Fixtures (With Connection) [Luminaire For Recessing In A Suspended Ceiling Modular Led 840 40 W 4000 Lm Ip20]; - Installation In Sanitary Facilities, On The Suspended Ceiling Surface-Mounted Lighting Fixtures (With Connection) [Led 840 13 W 4000 Lm Ip44 Modular Luminaire]; - Installation Of Outdoor Led Luminaires [Luminaire With Ip 65 Protection, External - One Luminaire With Description Wartownia, The Other Without Description] Installation With Connection To The Finished Surface Of The Lighting Fixture Above The Washbasin [Led Luminaire With Ip44 Protection, Designed To Be Installed In The Bathroom] F) Other Installation Works - Installation And Power Supply Of Axial Fans With A Diameter Of 150 Mm With Luminaires (2 Pcs. In The Bathroom) Checking And Measurement Of A Complete 1-Phase Low Voltage Electric Circuit; Measurement Of Insulation Resistance Of Electrical Installations - 1-Phase Circuit, First Measurement And Each Subsequent Measurement; Automatic Disconnection Of The Power Supply - Tests Of The Operation Of The Residual Current Device - The First And Each Subsequent One - Examination Of The Cable Line - Measurement Of Lighting Intensity At Workstations - Preparation Of As-Built Documentation For The Electrical Installation - Marking And Description Of Switchgears, Cable Connectors, Electrical Equipment. Detailed Description Of The Subject Of The Contract Is Described: In The Scope Of Part No. 1: 1) Technical Specification For The Execution And Acceptance Of Works (Stwior) - Constituting Appendix No. 1 To The Swz - In The Scope Of Part No. 1.2) Bill Of Quantities - Constituting Appendix No. 1A To The Swz In The Scope Of Part No. 1.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
00dd5051-3ffa-4fc6-9efe-d8b79a67591d.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.