Tenders Are Invited For Thermal Modernization Of The Building Of The Marshals Office Of The Małopolskie Voivodship At Ul. Racławicka 56 In Krakow - Stage 1

ICB — International Competitive Bid Closed Central Europe
Tender Information
GTR Reference
66861797
Tendering Authority
Subscribe to view
Tender No
DG-VI.272.10.2023
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Thermal Modernization Of The Building Of The Marshals Office Of The Małopolskie Voivodship At Ul. Racławicka 56 In Krakow - Stage 1
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
20-07-2023 Closed
Work Detail
1. The Subject Of The Contract Is The Execution Of Construction Works, Consisting In The Replacement Of Window Joinery, Replacement Of The Heating System And Other Other Works, Described Below.2. The Contractors Duties Will Also Include Connection, Start-Up, Leak Tests And Acceptance Of Devices And Installations, Together With Incurring Any Costs Of Preparing The Documentation Necessary To Carry Out These Activities.3. The Detailed Scope Of Works Has Been Described In The Design Documentation: In The Bill Of Quantities, Drawings, Technical Design And In The Technical Specification For The Execution And Acceptance Of Construction Works (Stwior): - Plugging The Openings, - Disassembly Of Window Joinery, - Disassembly Of External Window Sills, - Installation Of Warm Under-Sill Profiles (Xps), - Installation Of Extension Profiles, - Installation Of Windows, - Installation Of External Window Sills, - Installation Of Plaster On The Inner Window Wall, - Other Accompanying Works , Undescribed And Necessary For The Proper Execution Of Construction Works. Note! The Replacement Concerns Only Part Of The Windows, In Accordance With The Attached Diagram - Figure A-1 And Figure A-2. The Disassembly Of The Windows Should Be Carried Out Without Interfering With The Existing Insulation Of The Walls And Structure. It Is Unacceptable To Dismantle The Insulation From The Walls And External Reinforced Concrete Columns. However, If As A Result Of Disassembly Works, Any Element Or Construction Material Becomes Detached, Detached Or Destroyed, The Contractor Shall Perform All Repair Works Necessary To Restore The Original Condition, Including Reconstruction Of The Structure, Texture And Color Of The Façade. In Such A Situation, The Contractor Is Not Entitled To Additional Remuneration. − It Is Not Allowed To Cut Out The Insulation In Order To Lead The Window Anchors Beyond The Outer Outline Of The Frames. 2) Replacement Of The Central Heating System: - Draining Water From The System, - Disassembly Of Radiators And Fittings, - Disassembly Of Branches Of Risers And Risers, - Disassembly Of Suspensions And Radiator Holders, - Assembly Of Risers And Branches, - Assembly Of Radiators, Fittings And Accessories, − Test Filling And Starting The System.3) Other Works: The Employer Requires That The Contractor Include In Its Offer All Preparatory Works Related To The Execution Of Works, In Particular: − Securing Walls, Floors, Ceilings, Built-In Furniture (Permanent Buildings), − Lifting And Re-Assembly Of Movable Furniture, - Disassembly And Re-Assembly Of Window Blinds, - Disassembly, Re-Assembly Of External Air-Conditioning Units (Including Filling And Restarting The Installation) - Disassembly And Re-Assembly Of Grilles, 4) Information And Additional Requirements Of The Employer: - W Upon Commencement Of Construction Works, The Contractor Becomes The Owner Of The Generated Construction Waste And Is Obliged To Recycle, Transfer It For Storage Or Disposal. − The Costs Of Disposal Of Materials From Disassembly And Possible Environmental Fees Charged For The Disposal Of Hazardous Materials Are Borne By The Contractor. − The Employer Will Not Provide The Contractor With Any Social Or Storage Space. − If It Is Necessary To Occupy A Road Lane, The Development Of A Traffic Organization Design And All Costs Related To Marking The Area Or Fees For Occupying The Lane Are On The Side Of The Contractor. − The Employer Does Not Allow Temporary Storage Of Materials, Within The Communication Routes. − Rubble, Materials, Devices And Elements Of Technical Devices Coming From The Disassembly, The Contractor Will, On His Own Efforts And At His Own Expense, Remove Them Outside The Property And Hand Them Over For Disposal Or Recycling. Temporary Storage Of The Above Is Allowed. Materials In Containers Placed Outside The Ordering Partys Plot. − No Goods Lift Has Been Installed In The Building. − It Is Not Allowed To Transport Any Elements From Demolition Using Passenger Cranes Located In The Building. − Transport Of Dismantling Materials To The Place Of Their Loading Or Temporary Storage Will Be Carried Out Manually Through Horizontal Communication (Corridors) And Staircases Designated By The Inspector. − It Is Not Allowed To Drop Or Lower Any Elements Through Window Openings. − It Is Not Allowed To Store Dismantled Elements In The Building Longer Than Until The End Of The Working Day On Which Have Been Dismantled. − It Is Not Allowed To Store Dismantled Elements On Escape Routes, Staircases, Entrances To Used Rooms.4. A Detailed Description Of The Subject Of The Contract And The Conditions For The Execution Of The Contract Are Specified In The Attachments To The Swz, I.E. In The Design Documentation (Including The Bill Of Quantities Constituting Appendix 1D To The Swz, Drawings A-1 And A-2 And A List Of Joinery Constituting, Respectively, Annexes 1E1 - 1E3 To The Swz And The Technical Design Constituting Appendix No. 1F To The Swz) And In The Technical Specification For The Execution And Acceptance Of Construction Works (Stwior) Constituting Appendix No. 1G To The Swz.5. The Conditions For The Performance Of The Contract Are Included In The Draft Provisions Of The Public Procurement Contract, Which Will Be Introduced To The Content Of This Contract - The Contract Template And Constitute Annex 1C To The Swz (Hereinafter Referred To As The Contract Template).6. If In The Documents Of This Contract /Especially In The Project Documentation, Technical Specification For The Execution And Acceptance Of Construction Works (Stwior)/ The Subject Of The Contract Is Described By Indicating Trademarks, Trade Names, Patents Or Origin, Source Or Specific Process That Characterizes The Products Or Services Provided By Specific Contractor Or By Reference To Standards, Technical Assessments, Technical Specifications And Technical Reference Systems, The Ordering Party Indicates That In Each Case It Allows Equivalent Solutions. Demonstration Of Equivalence For The Offered Materials, Systems And Technologies, Etc. Rests With The Contractor, Who Is Obliged To Demonstrate In Content Of The Submitted Offer, Their Equivalence By Providing The Name, Manufacturer, Type Or Model Of The Offered Product And A Description Of Its Technical, Functional, Quality, Utility, Architectural, Aesthetic, Color, Etc. Characteristics. In Addition, The Contractor Is Obliged To Attach To The Offer Appropriate Technical And Functional Or Technological Descriptions (E.G. Product Cards, Safety Data Sheets, Material Cards, Prospectuses, Catalogues, Folders, Statements Of The Manufacturer Or Its Authorized Representative Or Other Documents Or Statements) Allowing For The Assessment Of The Compliance Of The Offered Item With Its Criteria Used To Assess The Equivalence Of The Offered Materials, Systems And Technologies, Etc. Is, Respectively, To Meet All Applicable Standards Or To Have Technical, Operational, Operational And Aesthetic Parameters Not Worse Than Those Indicated In The Design Documentation, Including The Bill Of Quantities Or Stwior. In The Case Of Offering Equivalent Materials, Systems And Technologies, Etc., The Contractor, Prior To Their Use (Embedment), Should Present Relevant Documents Confirming Their Equivalence And Obtain The Approval Of The Employer And The Designer.7. Pursuant To The Disposition Resulting From Art. 95 Of The Act Stipulates That It Requires The Contractor Or Subcontractor To Employ, On The Basis Of An Employment Relationship, Persons Performing Activities In The Scope Of Contract Performance, Consisting In Performing Work In The Manner Specified In Art. 22 §1 Of The Act Of June 26, 1974 - Labor Code (I.E. Journal Of Laws Of 2022, Item 1510, As Amended).8. Type Of Activities Related To The Performance Of The Contract, Which Relate To The Requirement Of Employment Under An Employment Relationship Of Persons Performing These Activities During The Performance Of The Contract, The Method Of Verifying The Employment Of These People And The Employers Rights To Control The Contractors Compliance With The Requirements Related To The Employment Of These People And Sanctions For Failure To Meet These Requirements Requirements Are Included In The Contract Template Constituting Annex No. 1C To The Above. Information On The Site Inspection Carried Out By The Contractor1. The Ordering Party Informs That Due To The Specificity Of The Subject Of The Contract, It Requires The Submission Of An Offer After The Contractors Inspection Of The Site.2. The Site Inspection Is Scheduled For July 7, 2023 And July 14, 2023 From 10:00 To 14:00 At Ul. Racławicka 56 In Krakow (Contact Person: Mr. Roman Kocierz, Tel. 606 300 489). 3. The Contractor Conducts A Site Visit On One Of The Above Dates, Prior To Notifying The Contact Person The Name Or First Name And Surname, Registered Office Or Place Of Business Activity Or Place Of Residence And Nip Or Regon Of The Contractor Who Is Carrying Out The Site Visit.4. The Ordering Party Informs That Pursuant To Art. 226 Sec. 1 Point 18 Of The Act Will Reject The Contractors Offer If It Is Submitted Without An On-Site Inspection, As The Contracting Authority Requires It To Be Carried Out, Describing It In These Procurement Documents.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
7a414339-0bbe-46ee-9d74-2c50bfdc7f78.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you