1.1. The Subject Of The Contract Are Construction Works Related To The Task Entitled Modernization Of The Playing Field At The Primary School Located On Plot No. 116 In Meszna Opacka1.2. The Scope Of The Contract Includes The Modernization Consisting In The Construction Of A Sports Field In The Place Of The Dismantled Asphalt Sports Field In Meszna Opacka, Municipality Of Tuch w On Plot No. 116 For A Safe Surface.1.2.1. As Part Of This Modernization Of The School Playground, The Following Renovation And Construction Works Will Be Carried Out: 1.2.1.1. Disassembly Of Existing Goals For Team Games, 1.2.1.2. Disassembly Of The Existing Volleyball Posts, 1.2.1.3. Disassembly Of The Existing Basketball Stands, 1.2.1.4. Execution Of A Trough For Widening The Pitch From The North And East Side Of The Pitch, 1.2.1.5. Supplementing The Foundation For Widening The Pitch Made Of Natural Aggregate, 1.2.1.6. Execution Of The Bonding Layer For The Foundation Made Of Natural Aggregate, 1.2.1.7. Leveling And Compacting The New Foundation For The Proper Pitch Surface, 1.2.1.8. Assembly Of A Synthetic, Two-Color, Polyurethane-Rubber Surface With A Total Layer Thickness Of 13 Mm, Water-Permeable, With A Compact Structure (Two-Layer Surface - Sbr Mat, Thickness 11 Mm + 2 Mm, Epdm1.2.1.9 Spraying. Construction Of Steel, Galvanized And Powder-Coated Green Posts 6 M High On The Eastern Side Of The School Building Of The Modernized Pitch, 1.2.1.10. Construction Of Steel, Galvanized And Powder Coated In Green, 4 M High Barrier Netting Posts On The North And South Sides Of The Modernized Pitch, 7/421.2.1.11. Assembly Of Propylene Mesh Netting Nets With A Height Of 6.00 M Behind The Goals For Team Games, From The South And North, 1.2.1.12. Installation Of 4.00 M High Netting Nets Made Of Propylene Mesh From The North And South, I.E. From The Side Of The Existing Grass Pitch And From The Side Of The Existing Playground, 1.2.1.13. Execution Of Linear Drainage In The Form Of Drip Trays Installed Along The Pitch From The Northern And Eastern Slopes, 1.2.1.14. Reconstruction Of The Sidewalk Located At The Western Wall Of The School Building, Adapted For The Disabled, 1.2.1.15. Reconstruction Of A Part Of The Pavement From The Entrance Stairs To The School Building To The Existing Sports Field, Adapted For The Disabled, 1.2.1.16. Filling The Sleeve For Team Games, 1.2.1.17. Installation Of Football/Handball Goals, 1.2.1.18. Assembly Of Basketball Racks, 1.2.1.19. Installation Of Volleyball And Tennis Posts, 1.2.1.20. Leveling And Development Of The Escarpment Area Around The Pitch.1.2.2. The Local Water Supply Network Runs Through The Area Where The Renovation Of The Pitch Surface Will Be Carried Out, Which Remains Unchanged, Without The Need To Relocate It. After The New Surface Is Made On The Existing Pitch, The Amount Of Rainwater Will Remain Unchanged, Rainwater From The Northern And Eastern Escarpment Will Be Discharged To The Unpaved Area, Below The Existing Pitch.1.2.3. In The Area Designated For The Investment, There Is An Asphalt Pitch, The Pitch Is Partially Fenced With A Coated Steel Mesh, Behind The Goal From The West Side, Steel Posts 80X80 Mm, 6.00 M High, Covered With A Polycarbonate Net Serving As A Barrier Net, Are Installed. The Existing, Asymmetric Pitch With An Asphalt Surface With A Total Asphalted Surface Of 218.25 M2 Is A Trauma Field, The Surface Of The Field Is Heavily Exploited And Requires Modernization, I.E. Replacement Of The Existing Asphalt Surface With A New Artificial Surface That Is Safe For All Users.