GTR 66769120
Tenders Are Invited For Wpi - A Safe Toddler For A Start - School And Kindergarten Complex No. 13 (Sp51) In Katowice
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
66769120
Tendering Authority
Subscribe to view
Tender No
ZP/360/2023
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Wpi - A Safe Toddler For A Start - School And Kindergarten Complex No. 13 (Sp51) In Katowice
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
19-07-2023
Closed
Work Detail
The Subject Of The Contract Are Construction Works Consisting In Comprehensive Modernization Of A Fragment Of The Building Of The Primary School 51 In The Scope Of The So-Called 2 Houses With Connectors For The Needs Of Pre-School Departments, Separating The Internal Ramp With An Aluminum Wall, Modernization Of The Existing School Kitchen Floor, Construction Of A Playground With Land Development, Delivery And Assembly Of Kindergarten Equipment And Retrofitting The Kitchen With Zsp13, In Particular: 1. Scope Of Works In The Construction Industry: A) Construction Works External Area Of The Building - Insulation And Insulation Of Foundations And Ground Floor Walls: - Excavation, - Removal Of Plaster, - Cutting And Reprofiling Of Joints In Brick Walls, - Execution Of Renovation Plaster, - Execution Of Vertical Anti-Moisture Insulation With Emulsion Bituminous Insulation, - Laying A Thermomodernization Layer Made Of Xps Polystyrene, - Laying Dimpled Foil, - Installing A Plinth Strip, - Backfilling Excavations With Compaction, - Laying Concrete Cubes With Curbs And Making A Foundation, B) Construction Works Inside The Building: - Replacement Of Ei60 Aluminum Window Joinery Together With Window Sills Made Of Conglomerate, - Assembly Of External Window Sills Made Of Steel Sheet, - Assembly Of External Aluminum Door Frames With Opening Preparation, - Assembly Of Internal Aluminum Wall, Separation Of The Ramp, - Assembly Of Aluminum Walls For Individual Classes Rooms With Sliding Doors, - Assembly Of Aluminum Partition Walls Wc In The Classrooms, - Assembly Of An Aluminum Wall, - Entrance Vestibule, - Assembly Of A Plasterboard Wall, - Delivery And Assembly Of Hpl Wc Cubicles With Doors, - Assembly Of Internal Aluminum Doors, - Replacement Of Pvc Floors In Classrooms, Including Screed Removal, Insulation And Underlayment Concrete Floor, - Laying The Tile Floor With The Plinth In The Communication And Cloakroom, Including Breaking The Screed, Insulation And Concrete Base, - Laying The Tile Floor With Insulation, - Laying The Tiles On The Walls, - Disassembly Of The Suspended Ceiling With The Substructure And Insulation - Execution Of Gypsum Plaster On The Walls, - Painting Of The Walls, - Installation Of A Suspended Ceiling With Fire Resistance, Including The Substructure And Insulation, - Installation Of The Stair Lift In The School Corridor With The Balustrade, - Delivery And Assembly Of The Substructure For Ventilation, - Delivery And Assembly Of The Radiator Housing C) Delivery And Assembly Of Equipment For Teaching Rooms, Cloakrooms And The Kindergarten Kitchen Room, Including Connection, D) Delivery And Assembly Of Toilet Equipment, E) Construction Works In The Schools Existing Kitchen: - Removal And Disconnection Of Kitchen Equipment From The Mains, - Breaking The Floor - Disassembly Of The Elements Of The Reinforced Concrete Structure, - Chipping Of Wall Tiles From The Walls, - Execution Of A Concrete Screed, - Horizontal Insulation With Xps Board, - Replacement And Insulation Of Culverts In The Kitchen Ceiling, - Adaptation Of The Installation To Connect A Convection-Steam Oven And A Stool, - Tiles - Floor Tiles With Plinths, Including Surface Preparation, - Wall Tiles, Including Surface Preparation, - Delivery And Assembly Of Hpl Walls, - Delivery And Assembly Of Swing Doors, - Painting Of Walls And Ceiling, - Delivery And Assembly Of Kitchen Equipment, - Carrying And Assembly Along With Connecting The Existing Equipment, F) Canopy Over The Entrance To The Kindergarten: - Execution Of The Foundation Footing, - Insulation, - Walling Of Columns, - Supporting Structure, - Polycarbonate Roof, G) Amphitheater Stairs: - Delivery And Assembly Of Steel Substructure Under The Stairs , - Delivery And Assembly Of Seats, H) Off-Road Stairs: - Execution Of Excavations, - Execution Of Formwork, - Reinforcement, - Delivery And Assembly Of Prefabricated Concrete Stairs, - Delivery And Assembly Of Balustrades, - Delivery And Assembly Of A Lift For The Disabled, Cubes: - Execution Of The Trough And Foundation For The Sidewalk, - Footings For The Curb, - Concrete Paving, - Raising Fittings At The Connections To The New Gradeline, - Delivery And Installation Of Shoe Wipers, - Delivery And Installation Of Rainwater Tanks, J) Gravel Surface - Execution Of The Channel And Foundation, - Laying Of Geotextile, - Laying Of Gravel Surface, K) Greenery: - Mechanical Cutting Of Trees, - Fragmentary Felling Of Bushes, - Replacement Planting Of Trees, - Planting And Topsoiling Of The Area Along With Sowing The Lawn, - Care Of Trees And Shrubs, L) Fencing: - Execution Of The Entrance Gate, M) Delivery And Assembly Of Playground Equipment, Climbing Wall And Elements Of Small Architecture, 2. Scope Of Electrical Installation Works: - Disassembly Works, - Installation Of Basic, Emergency And Evacuation Lighting, Installation Of Plug Sockets, - Implementation Of A New Fire Protection System. With Executive Apparatus, - Execution Of Rtv Installation, - Execution Of Main Power Supply With Rg, - Assembly Of Power Supply And Complete Fuse Boards, - Assembly Of Low-Waste, Intercom And Cctv Installations, - Power Supply Of New Devices In The Kitchen, - Assembly Of Lightning Protection System, Execution Of Ring Earthing, Installation Of Equipotential Bonding, Control Measurements Of Completed Installations3. Installation Works In The Sanitary Industry: - Disassembly Of The Central Heating System (Radiator, And Pipes), - Cutting Out Horizontal And Vertical Grooves For Water Pipes, - Cutting Out Passages Through Walls And Ceilings, - Assembly Of Tight Passages Through Ceilings, - Sealing With Fireproof Masses, - Walling Up The Grooves - Concreting The Openings, - Assembly Of Multilayer Pipes Joined By Pressing, - Testing The Tightness Of The Water System, - Assembly Of Pvc-Hat Sewage Pipes Joined With Rubber Seals, - Assembly Of S Class Pvc-U Pipes With An Elongated Socket, Joined With A Rubber Seal (Under And External), - Assembly Of Thin-Walled, Galvanized Steel Pipes With Clamp Connections, - Tightness Test Of The Central Heating System Cold, - Tightness Test Of The Central Heating System - Execution Of Outflow Connections From Pvc Pipes, - Execution Of Inlet Connections, - Installation Of Ventilation Ducts From Spiro Pipes, - Insulation Of Ventilation Ducts, - Installation Of Ball Valves, - Installation Of Thermostatic Valves Equipped With A Thermostatic Head, - Installation Of Sanitary Equipment (Washbasins Toilet Bowls, Faucets), - Assembly Of Steel Plate-Convector Radiators, - Assembly Of Capacitive Electric Water Heaters, - Assembly Of Two Ventilation Units With A Recuperator, - Assembly Of Duct Fans, - Assembly Of Hydrant Installation, - Assembly Of Hydrant Boxes, - Test Of Hydrants Capacity, - Disposal Of Materials From Disassembly And Disposal Of Rubble And Materials From Disassembly. 4. Removal And Disposal Of Demolition Materials For A Comprehensive Scope Of Work.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
2ed81116-f8f0-4f28-a0aa-b090682f9c56.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.