GTR 66769065
Tenders Are Invited For Execution Of Construction Works As Part Of The Task: Establishing And Equipping The Senior+ Club In Warka
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
66769065
Tendering Authority
Subscribe to view
Tender No
IR.271.3.13.2023
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Execution Of Construction Works As Part Of The Task: Establishing And Equipping The Senior+ Club In Warka
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
17-07-2023
Closed
Work Detail
The Subject Of The Contract Is: Task 1. Adaptation Of A Workshop Room Located At -124 Cm Below The Floor Level Of The Ground Floor Of The Cesir Building In Warka For Rooms Intended For The Senior + Club. Utility Program After The Renovation And Adaptation Of The Room: - Meeting Room - Area Usable Area Of About 45.00 M2 - Kitchenette - Area About 15.00 M2 - Corridor - Area About 12.5 M2 - Cloakroom - Area About 5.00 M2 - Social Room - Area About 7.00 M2 - Washbasin And Womens Toilet Room - Area About 4.50 M2 - Washbasin And Mens Toilet Room - Area About 4.50 M2. Task 2. Adaptation Of A Part Of The Workshop Located At -124 Cm Below The Floor Level Of The Ground Floor Of The Cesir Building In Warka For A Utility Room. Storage Room - Area About 13.94 M2. Scope Of Works To Be Performed Task 1: 1. Demolition Works. Demolition Works Of The Existing 12 Cm Thick Brick Partition Walls. Demolition Of Internal Steel Stairs, Demolition Of Plasterboard Walls, Remnants Of A Makeshift Bathroom And Kitchenette. Demolition Of Surface-Mounted Electrical Installations, Water And Sewage Installations And Pvc And Steel Ventilation Ducts. Cutting Out The Window Opening And Dismantling The Wall Under The Window In Order To Install The Aluminum Entrance Door. Forging An Internal Door, Making A Lintel And Widening The Opening For A New Wider Door In Order To Ensure Accessibility For The Disabled. Removal Of Rubble From The Site Of Works.2. Supplementing The Space With Dug Sand Raising The Level Of The Existing Floor By Supplementing The Space With Sand Along With Compaction And Preparation For Underlayment, Insulating And Flooring Layers. 3. Execution Of A Concrete Foundation On Sand Stabilized With Layers, Anti-Moisture Insulation Made Of Foil And Thermal Insulation Made Of Expanded Polystyrene Thick. 10 Cm, Making A Leveling Concrete Layer For Stoneware Floors. Flooring Made Of Gres Tiles. 4. Execution Of Partition Walls From Aerated Concrete Blocks, Thickness. 12.0 Cm With Machine Gypsum Plaster. Assembling Internal Door Joinery For The Planned Rooms - Wooden Or Mdf Joinery In A Wood-Like Veneer. Finishing The Existing Walls With Gypsum Plaster, In The Washbasins And Toilet Rooms, Tiles Up To A Height Of 2.05 M, In The Kitchenette, Tiles From 80.0 Cm To The Height Of Any Hanging Cabinets, I.E. Up To A Height Of 140 Cm (60 Cm Belt). 5. Construction Of An Internal Sill Made Of Stone Conglomerate 6. Suspended Ceiling A Suspended Ceiling Will Be Made Of A Metal Structure With Filling With Armstrong Mineral Fiber Boards 60/60 Cm Or 60/120 Cm To Be Agreed. Water And Sewage In The Room. The Installation Is Embedded In The Walls And Hidden In The Floor. Water Supply Systems Made Of Pp Pipes, Sewage Systems Made Of Pvc Pipes. In The Sanitary Rooms, Washbasins On Cabinets And Compact Porcelain Toilet Seats Are Planned, In The Kitchenette A Single-Chamber Sink With A Stainless Steel Drainer Is Planned. Due To The Lack Of Hot Water Installation Two-Phase Electric Flow Heaters Are Planned At The Sink And Washbasins. 8. Electrical Works. Power Supply And Lighting Installation Divided Into Lighting And Power Supply Circuits In Individual Rooms. Installation On Walls, Flush-Mounted In Grooves, On The Ceiling Above The Suspended Ceiling. Energy-Saving Led Lighting - Coffers For Mounting In The Armstrong Ceiling, Lighting Intensity For The Functions Of Individual Rooms Should Be Selected On The Basis Of Applicable Standards And Regulations. In Addition, Emergency And Evacuation Lighting Should Be Installed In The Rooms. 9. Installation Of The Air-Conditioner And Air Curtain. It Is Planned To Install An Internal Air-Conditioner With A Power Of 5 Kw And An Air Curtain With A Power Of About 2 Kw At The External Entrance Door. It Is Possible To Use The Existing Ventilation Shaft To Lead Out The External Unit Of The Air-Conditioner. Gravitational Ventilation And Mechanical Exhaust Ventilation In The Case Of Wc Rooms Should Be Provided In The Rooms. Coupled With Bathroom Lighting. In The Annex Room, The Possibility Of Installing An Electric Cooker Hood Should Be Provided. 10. In Connection With The Execution Of The Entrance From The Outside, It Is Planned To Construct Two-Stage External Entrance Stairs With A Landing - Preferably, The Stairs Should Be Made Of Prefabricated Concrete Elements (Palisade, Filling The Steps And Landing, Concrete Cubes, E.G. Jadar Or Libet Type, Etc. The Scope Of Works To Be Performed Task 2: 2. Demolition And Renovation Workscutting Out The Opening For The Installation Of The Door.Removal And Removal Of Rubble.Execution Of The Lintel For The Planned Door Opening And Filling The Aluminum Door From The Disassembly From Task 1. 2.Filling The Space With Dug Sandraising The Level Of The Existing Floor By Supplementing The Space With Sand Along With Compaction And Preparation Under The Base, Insulating And Floor Layers 3. Execution Of A Concrete Base On Sand Stabilized With Layers, Anti-Moisture Insulation Made Of Foil And Thermal Insulation Made Of Polystyrene 10 Cm Thick, Execution Of A Concrete Leveling Layer For Stoneware Floors. 4. Performing Machine Gypsum Plaster On The Newly Created Wall, Supplementing The Plaster, Painting The Walls And Ceiling 8. Electrical Works Disassembly Of The Existing Installation And Construction Of A New Power Supply And Lighting Installation With Connection To The Buildings Installation, Assembly Of Led Lamps From Disassembly, Lighting Intensity Should Be Selected For A Room With Warehouse Function. A Detailed Description Of The Subject Of The Contract Is Included In Chapter Iv Of The Swz, Stwior Constituting Annex No. 9 To The Swz And In The Bill Of Quantities Constituting Annex No. 8 To The Swz.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
71912d50-1ee6-40fd-b903-edeb8739987a.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.