GTR 66735625
Bids Are Invited For Float Reconstruction – Port Clements
ICB — International Competitive Bid
Closed
Northern America
Tender Information
GTR Reference
66735625
Tendering Authority
Subscribe to view
Tender No
cb-6846-1875530
Financer Name
Self-Funded
Work Title
Bids Are Invited For Float Reconstruction – Port Clements
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Northern America
Political Region
Asia Pacific Economic Cooperation APEC,G20,APAC Asia Pacific
Last Date of Bid Submission
14-07-2023
Closed
Work Detail
Float Reconstruction – Port Clements . Background Small Craft Harbours (Sch) Pacific Region Requires The Complete *Replacement An Existing Timber Float (Float 802) With A New 12’ Wide Timber Float At The Federal Government Owned Harbour At Port Clements (Site) On Haida Gwaii Island, British Columbia. Objective Of This Work Is To Fabricate A New Float, **Removal And Disposal Of The Old Float, And The Complete Installation Of The New Float With Existing Timber Mooring Pile In Place. The Existing Timber Mooring Pile Will Not Be Replaced. *Replacement: Removal Of Existing Component Including Treated Timber, Hardware And Fasteners And To Be Replaced With New Component Including Supply And Install Of New Hardware And Treated Timber, Drilling, Field Fitting And Field Treating As Required. **Removal: Dismantling, Demolition, Handling, Sorting, And Hauling Material Away From Site. Owner Supply Sch Will Supply All Timber Material And Hardware Required For The Complete Float Fabrication. Summary Of Work The Lump Sum Portion Will Be For The Following: • Mobilization And Demobilization • New Timber Float Fabrication • Removal And Disposal Of Existing Float 802 • New Float Install Cost Plus Portion Will Be For The Following: • Float Utilities Remove And Re-Install Site Specific Requirements: Work Must Be Done To Minimize The Period On When Float 802 Is Out Of Commission To Minimize The Time Vessels Are Relocated Due To This Project. Contractor Must Pre-Fabricate The New Floats And Ready To Install In Place Before The Removal Of The Existing Float 802. Maximum Time That Float 802 Can Be Out Of Commission Is Four (4) Weeks. The Contractor Cannot First Remove The Old Float So That Is No Float While The New Float Is Being Fabricated. Contractor To Provide At Least Two (2) Weeks Notification On When They Want The Vessels To Be Relocated From Float 802 Two Phase Selection Process This Is The First Phase (Phase 1) Of A Two-Phase Competition: The First Phase Will Evaluate The Qualifications Of All Bidders; Second Phase (Phase 2) Will Invite The Qualified Bidders To Provide A Financial Bid On The Project Based On The Specifications And Drawings. Upon Award Of Contract In Phase Two The Pre-Qualification List Will Be Terminated, No Additional Contracts Will Be Awarded.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
268aa216-ca4f-41a3-86e6-5f83eb369bdd.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.