GTR 66731291
Tenders Are Invited For Renovation Of The Roof, Attic Ceiling And Chimneys With The Replacement Of The Roofing And The Installation Of A Lightning Protection System For Residential Buildings At Ul. Dolna 35 And Dolna 37 Outhouse In Warsaw
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
66731291
Tendering Authority
Subscribe to view
Tender No
TZ-PNK.260.30.2023
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Renovation Of The Roof, Attic Ceiling And Chimneys With The Replacement Of The Roofing And The Installation Of A Lightning Protection System For Residential Buildings At Ul. Dolna 35 And Dolna 37 Outhouse In Warsaw
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
14-07-2023
Closed
Work Detail
Quote From Swz: 5.1. The Subject Of The Order Is The Renovation Of The Roof, Attic Ceiling And Chimneys With The Replacement Of The Roofing And The Replacement Of The Lightning Protection System Of Residential Buildings At Dolna 35 And Dolna 37 Streets In The Outbuilding In Warsaw. The Scope Of Works Includes: Roof Repair Demolition Works:- Demolition Of The Existing Roofing Felt, - Demolition Of The Existing Full Boarding, - Demolition Of The Existing Roof Hatch, - Assessment Of The Technical Condition Of The Roof Truss Construction Works: - Replacement Of Damaged Roof Truss Elements The Final Qualification Of Wooden Elements Of The Roof Truss For Replacement Should Be Made After Demolition Of The Roofing And Plank Sheathing, - New Roof Sheathing Made Of 25Mm Thick Boards, - New Roofing Made Of Heat-Weldable Roofing Felt (Underlayment Roofing Felt, Roofing Roofing Felt, Use 10Cm X 10Cm Isoclins In The Corners), - Rebuilding Of The Knee Wall, - Assembly Of Sewage Vents, - Installation Of A Roof Hatch, - Installation Of Chimney Benches, - Installation Of Flashings. Renovation Of The Attic Ceiling - Removal Of The Plaster, - Reinforcement Of The Ceiling Beams With A Steel U-Profile, - Installation Of Osb Boards Or Boards. Reinforced With Steel Mesh, - Painting With Silicone Paint In White, - Demolition Of The Existing Chimney Caps, - Making New Chimney Caps As Reinforced Concrete Ones, Th. Min. 12 Cm, Reinforced With A Grid Of Ø 8 Mm Rods Every 10 Cm, - Top Layer Of Roofing Felt, - Flashings. 62305 To Protect Elements Protruding Above The Roof Surface, - Connection Of The Down-Conductors With The Air-Termination Grid On The Roof Should Be Made By Means Of Screw Clamps, - Execution Of The Down-Conductors From Galvanized Steel Wire Dfezn Ф 8Mm, Routed In A Lightning Protection Tube Flush-Mounted In The Façade Layer, - Connection Of Down-Conductors With Wires Grounding Connections Should Be Made With The Use Of Control Connectors In Test Boxes, - The Grounding Wires From The Earth Electrode To The Control Connections Should Be Made Of A Galvanized Steel Flat Bar Fezn 30X4 Mm, Run Flush-Mounted In The Lightning Protection Pipe, - Execution For The Lightning Protection System, Vertical Earth Electrodes As Typical, Made Of Galvanized Steel Rods, Min. Ф20mm, - Earthing Resistance For The Needs Of The Lightning Protection System Should Not Be Higher Than 10Ω, - The Method Of Making The Lightning Protection System Is Shown In Figure E-18.5.2. The Activities Referred To In § 1 Section 1 Of The Provisions Of The Agreement Constituting Chapter Iii Of The Swz And In Point 5.1. Swz Will Be Carried Out Under The Supervision Of Supervision Inspectors Employed At The Real Estate Management Department In The Mokotów District Of The Capital City Of Warsaw Dom Konduktorska.5.3. Wherever The Swz And Its Appendices Mention The Type Or Manufacturer Of Materials Or Equipment By Name, The Employer Allows Equivalent Solutions. 5.4. The Terms Of The Contract And The Guarantee Include Bills Of Quantities, Specifying The Type, Method Of Execution And Quantity Of Works Planned To Be Performed - Constituting Chapter Vi Of The Swz And The Provisions Of The Contract Constituting Chapter Iii Of The Swz. 5.5. The Activities Referred To In § 1 Section 1 Of The Provisions Of The Agreement, Constituting Chapter Iii Of The Swz, Are To Be Performed In Accordance With The Principles Of Technical Knowledge And With: 5.5.1. Bills Of Quantities Specifying The Type, Method Of Execution And Quantity Of Works Planned To Be Performed - Constituting Chapter Vi Swz, 5.5.2. Conditions Resulting From Technical Regulations And Activities Listed In Art. 22 Of The Act Of 7 July 1994 Construction Law (I.E. Journal Of Laws Of 2023, Item 682, As Amended) - Hereinafter Referred To As The Construction Law And Its Implementing Regulations, 5.5.3. Technical Specifications For Execution And Acceptance Of Works, Constituting Chapter Iv Of The Swz, And Construction Designs Constituting Chapter V Of The Swz. 5.5.4. Requirements Resulting From Current Polish Standards And Technical Approvals, 5.5.5. In Accordance With The Design Documentation, 5.5.6. Conditions Resulting From The Provisions Of The Act Of April 16, 2004 On Construction Products (I.E. Journal Of Laws Of 2021, Item 1213) And The Regulation Of The Minister Of Interior And Administration Of June 7, 2010 On Fire Protection Of Buildings, Other Construction Facilities And Areas (Journal Of Laws No. 109, Item 719) 5.5.7. Conditions Arising From The Provisions Of The Contract Constituting Chapter Iii Of The Swz; The Contracting Authority Allows For The Possibility Of Introducing Changes To The Provisions Of The Contract Constituting Chapter Iii Of The Swz, In Relation To The Content Of The Offer, On The Basis Of Which The Contractor Was Selected In The Cases Indicated In The Provisions Of The Contract, Chapter Iii Of The Swz, 5.5.8. Regulation Of The Minister Of Infrastructure Of 12 April 2002 On The Technical Conditions To Be Met By Buildings And Their Location (I.E. Journal Of Laws Of 2022, Item 1225). 5.6. Materials And Products Referred To In § 3 Section 6 And 7 Of The Provisions Of The Agreement Should Meet The Requirements Of Art. 10 Of The Construction Law And The Construction Products Act And Have A Safety Mark Certificate For Products Subject To This Certification. For Other Materials - With The Exception Of Those Indicated In The Applicable Regulations Regarding The Determination Of The List Of Products That Have No Significant Impact On Meeting The Basic Requirements, Have A Declaration Of Compliance With The Reference Document, Which Is The Polish Standard, And In The Absence Of A National Technical Approval (At) Or European Approval (Eta). At Each Request Of The Ordering Party, The Contractor Shall Be Obliged To Present Certificates And Declarations Allowing The Product To Be Marketed And Used In The Construction Industry In Relation To The Indicated Materials. 5.7. The Contractor Will Be Obliged To Provide A Guarantee For The Works Performed By Him, Which Are The Subject Of The Contract, Referred To In Point 5.1. Swz And In § 1 Of The Provisions Of The Contract (Chapter Iii Swz) And For The Materials Used For A Period Of At Least 60 Months From The Date Of Faultless Final Acceptance Of The Works, With The Proviso That For Materials This Period May Not Be Shorter Than The Guarantee Provided By The Manufacturer, But Not Shorter Than 60 Months. The Contractor Shall Transfer To The Ordering Party The Warranty Conditions Of The Producers Of The Materials Used As Part Of The Performance Of The Subject Of The Order Specified In Point 5.1. Swz.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
83215621-2cc9-40d8-a3e3-1cf199f3cdf4.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.