Tenders Are Invited For Creation Of A Virtual Shooting Range - Adaptation Of Rooms No. 12 And 11 In The Main Building Of The School Complex No. 3 Im. Mikołaj Rej In Kędzierzyn-Koźle In 2023.

ICB — International Competitive Bid Closed Central Europe
Tender Information
GTR Reference
66635541
Tendering Authority
Subscribe to view
Tender No
AG.26.22.2023.JSK
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Creation Of A Virtual Shooting Range - Adaptation Of Rooms No. 12 And 11 In The Main Building Of The School Complex No. 3 Im. Mikołaj Rej In Kędzierzyn-Koźle In 2023.
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
14-07-2023 Closed
Work Detail
The Subject Of The Order Consists Of: A. Demolition Works, Including: - Disconnection Of Wires With A Cross-Section Of Up To 6 Mm2 From Terminals Or Pins, - Disassembly Of Cable Wires With A Total Cross-Section Of Wires Up To 30 Mm2 From A Brick Or Concrete Substrate With The Removal Of Holders, - Forging Pins Or Unscrewing The Screws, - Disassembly Of Flush-Mounted Plug Sockets With Blanking, Disassembly Of Flush-Mounted Installation Connectors With A Current Intensity Of Up To 10 A, - Disassembly Of Fluorescent Lamp Fittings With A Cover, - Disassembly Of A Washbasin And Wash-Basin Faucet, - Disassembly Of The Outflow Connection Made Of Cast Iron Pipes, - Disassembly Of The Intake Valve (Outlet ) With Plugging The Approach,  Disassembly Of The Galvanized Steel Pipeline,  Removal Of Internal Plasters From Lime Mortar,  Cutting Out Shreds In The Cross-Section Of The Wall Made Of Bricks With A Thickness Of 1 Brick. On Lime Mortar, - Disassembly Of The Wall Covering, - Tearing Off The Plastic Floor, - Disassembly Of The Floor Made Of Slats, - Supplementing Ordinary Internal Plaster, - Scraping And Washing Off The Old Paint In The Rooms B. General Construction Works, Including: - Supplementing The Walls Or Bricking Up The Openings In Walls On Cement-Lime Mortar With Cellular Concrete Blocks, - Supplementing Internal Plasters, - Internal Single-Layer Gypsum Finishing Coats On Walls Made Of Prefabricated Elements And Poured Concrete, - Painting Old Interior Walls With Emulsion Paints Twice In A Dark Color, - Painting Old Walls Twice With Oil Paints Internal Wall Plasters With One-Time Mudding, - Priming Of Substrates With Preparations Such As Ceresit Ct 17 And Atlas Uni Grunt, - Single-Layer Internal Gypsum Finishing Coats On Ceilings Made Of Prefabricated Elements And Poured Concrete, - Two-Time Painting Of Old Interior Ceiling Plasters With Emulsion Paints, - Two-Time Oil Painting Of Radiator Radiators, - Double Painting Of Water And Gas Pipes With Oil Paint, - Leveling And Smoothing Layers Made Of Self-Leveling Mortar, 5 Mm Thick, Applied Indoors, - Leveling And Smoothing Layers Made Of Self-Levelling Mortar, - Floor Coverings Made Of Artificial Stone Tiles With Regular Shapes On Thin-Layer Adhesive Mortar; - Tiles With Dimensions Of 33X33 Cm, - Wall Plinths Made Of Plinth Fittings With A Height Of 10 Cm On A Thin-Layer Mortar;  Fittings 28-40 Cm Long,  Double Painting Of Previously Painted Door Woodwork With Oil Paint,  Walls And Cabinets With The Same Surface Area, Mechanical Cutting Of Grooves For Plug-In Cables In Bricks,  Mechanical Cutting Of Grooves For Plug-In Cables At The Contact Point Of Concrete Elements,  Plug-In Cable Total Cross-Section Of Wires Up To 7.5 Mm2 (Concrete Surface) Laid In Plaster, - Installation Of Bakelite Boxes On A Ready Surface, - Installation With Connection Of Tunnel Fluorescent Luminaires In A Plastic Housing With A Cover - Screwed -1X20w - Through-Hole Pcs. 4 Pcs ., - Assembly And Connection Of Fluorescent Luminaires Made Of Steel Sheet With Suspended Louver 2X20w - Final 8 Pcs., - First Measurement Of The Effectiveness Of Zeroing, Checking And Measurement Of A Complete 1-Phase Low Voltage Electrical Circuitc. Equipment - Delivery And Installation Of Blackout Roller Blinds In Castes 4 Pcs. - Delivery And Arrangement Of Mattresses 4 Pcs. The Full And Precise Scope And Description Of The Subject Of The Order Is Defined By: - ​​Bill Of Quantities (Only Auxiliary Material For Calculating The Price); - Stwiorb; Published On The Website Of The Procedure. The Execution Of The Subject Of The Order Also Includes: A. Execution Of Geodetic Works, If Necessary; B. Maintaining The Marking During The Execution Of Works; C. Making The Necessary Arrangements Related To The Implementation Of The Task (E.G. Property Owners) And Incurring Related Costs, If Necessary; D. Organization, Development And Marking Of The Construction Site And Liquidation Of The Construction Site; E. The Contractor Is Obliged To Organize And Carry Out Construction Works In A Safe Manner, Not Posing A Threat To People Staying On The Investment Site. In Particular, He Is Responsible For Carrying Out Construction Works In Accordance With The Requirements Of The Regulation Of The Minister Of Infrastructure Of February 6, 2003 On Occupational Health And Safety During Construction Works (Journal Of Laws Of 2003, No. 47, Item 401); F. In The Event Of Damage To The Existing Media And Other Existing Elements, Compensation For Losses Will Be Enforced On The Basis Of The As-Built Calculation And Losses Resulting From The Lack Of Power Or Transmission, Prepared By The Injured User Or Owner; G. Maintaining Order During The Execution Of Works, Systematic Ordering Of Work Places And Tidying Up After The Completion Of Works; H. Roads Used To Support The Construction Site Should Be Kept Clean And Tidy. It Is Forbidden To Pledge The Above-Mentioned Roads For Parking Construction Vehicles. The Contractor Is Obliged To Systematically Clean And Rinse The Dust, Dust And Dirt From The Pavements And Roadways Caused By The Construction; I. The Contractor Is Obliged To Submit To The Supervision Inspector For Approval All Working Solutions, Workshop Drawings With Appropriate Descriptions, Calculations, Material Samples, Product Prototypes Both Included And Not Included In The Design Documentation Together With The Required Certificates, Approvals, Attestations, Etc.; Before Making Or Ordering Individual Elements, The Contractor Must Check Their Dimensions On Site; J. Before Ordering Materials, Devices And Equipment, The Contractor Is Obliged To Take Measurements On The Site And Provide The Employer With Material And Color Proposals For Approval; K. The Contractor Should Perform All Activities Necessary For The Execution Of Works In Such A Way That, Within The Limits Resulting From The Need To Fulfill Contractual Obligations, It Does Not Disturb Public Order More Than Necessary, Access, Use Or Occupation Of Roads, Pavements And Public And Private Squares To And On Areas Belonging To Both To The Ordering Party And To Third Parties; L. The Contractor Should Indemnify The Employer Against Any Claims, Proceedings, Damages And Costs That May Result From Failure To Comply With The Above Provision; The Contractor Should Protect The Access Roads To The Construction Site From Damage By Traffic Related To The Activities Of The Contractor And Subcontractors, Selecting Routes And Using Vehicles So That Special Traffic Related To The Transport Of Materials, Devices And Equipment Of The Contractor To The Construction Site Is Reduced To A Minimum And So As Not To Cause Damage To These Roads; N. The Contractor Should Secure And Compensate The Employer For Any Claims That May Be Directed In This Connection Directly Against The Employer And Undertake Negotiations And Pay Claims That Arise As A Result Of The Damage; O. The Contractor Is Obliged To Participate, At The Request Of The Ordering Party, In Meetings And Other Activities During The Implementation Of The Subject Of The Agreement And During The Guarantee Or Warranty Period; P. Preparation Of A Safety And Health Protection Plan, If Separate Regulations Require Such A Plan; Q. Tests And Acceptances With The Participation Of The Required State Institutions, Investor And User;R. Execution Of Post-Inspection And Post-Acceptance Recommendations; P. Waste Management - The Contractor As A Waste Producer, Within The Meaning Of Art. 3 Sec. 1 Point 32 Of The Act Of December 14, 2012 On Waste (I.E. Journal Of Laws Of 2022, Item 699, As Amended) And The Act Of April 27, 2001 - Environmental Protection Law (I.E. Journal Of Laws Of 2022, Item 2556, As Amended); Reimbursement Of The Costs Of Utilities Collected From The Ordering Party (Water, Electricity), If Any; U. Tidying Up The Construction Site And Restoring The Site To Its Original Condition After Completion Of The Works;V. Preparation Of As-Built Documentation And Its Delivery Together With A Written Notification Of Readiness For Final Acceptance Of Works; Performing A Geodetic As-Built Inventory, If Required;X. Preparation Of The As-Built Cost Estimate In The Layout Of Integrated Elements Prepared By The Contractor And Presentation Together With The Last (Final) Invoice After The Complete Completion Of The Task And Signing The Fault-Free Protocol Of The Final Acceptance Of The Work; Presentation, Together With A Partial Invoice, Of At Least A Cost Statement For The Performance Of Works In The Integrated Elements System;Z. The Contractor Is Obliged To Obtain Appropriate Permits Under The Provisions Of The Act Of 14/12/2012 On Waste (Journal Of Laws Of 2022, Item 669, As Amended) And The Act Of 27/04/2001 - Environmental Protection Law ( Journal Of Laws Of 2022, Item 2556, As Amended) If The Performance Of Works Falling Within The Scope Of The Subject Of The Contract So Requires; The Contractor Is Obliged To Perform The Order In A Manner Consistent With The Act Of January 11, 2018 On Electromobility And Alternative Fuels (Journal Of Laws Of 2023, Item 875). When Calculating The Bid Price, The Contractor Should Pay Particular Attention To The Exclusions Of Vehicles Contained In The Above-Mentioned Act.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
7fe0feb8-7161-4f56-8cf5-8fdce3b486eb.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders