The Scope Of The Task Includes The Design, Delivery And Assembly Of Individual Household Biological Sewage Treatment Plants In The Amount Of: - 15 Biological Treatment Plants With A Rotating Biological Bed - 5 Pe, Flow Rate 0.75 M3/D, Complete With A Control Cabinet And Power Cable - 5 Biological Treatment Plants With Rotating Biological Bed - 8 Pe Flow 1.2 M3/D, Complete With A Control Cabinet And A Power Cable Assembly Of Household Sewage Treatment Plants In The Commune Of Szerzyny Implemented In The Commune Of Szerzyny Outside The Szerzyny Agglomeration. The Installation Contractor Is Obliged To Verify The Location Of The Planned Treatment Plants In Consultation With The Employer And Property Owners, Verify The Ground And Water Conditions In Terms Of The Type Of Soil And The Depth Of The Groundwater Table, As Well As The Actual Ground Level, Which Will Determine The Need To Use A Sewage Pump (Pumping Station) Cleaned, As Well As Other Aspects Affecting The Scope Of Deliveries And Field Works. The Contractor Shall Deliver And Install Devices, Installations And Materials That Are Complete And Ready For Use In All Respects And Meet The Requirements Of The Fup. The Purpose Of The Investment Is To Replace Septic Tanks For Liquid Waste, Often Unsatisfactory Technical Condition (Leaks), Which In Turn Will Prevent Direct Penetration Of Liquid Impurities Into The Soil. The Selection Of Appropriate Technological Devices Allows For Reducing Operating Costs Due To The Fact That The Technology Does Not Require Constant Supervision Of The Operator And, Due To Its Uncomplicated Design, Has Very Low Energy Consumption. Requirements Of The Pn-En 12566-3+A2:2013-10 Standard. It Is Required That The Offer Is Secured With A Full Test Report, In Accordance With The Pn-En 12566-3+A2:2013-10 Standard, Including Those In Accordance With Annex B - The Procedure For Testing The Effectiveness Of Cleaning, Issued By A Laboratory Notified By The European Commission, Issued For A Specific Series Of Types Of Devices. The Delivered Devices Are To Be Complete, Brand New Products That Have Been Tested As A Whole. Only Those Units Listed In The List Available On The European Commissions Website Will Be Recognized By The Contracting Authority As Authorized To Carry Out This Type Of Research. In Addition, The Report Must Refer To The Indicators Required By The Employer, I.E. Energy Consumption And The Expected Degree Of Wastewater Treatment. Possession Of The Above-Mentioned Document Is Tantamount To The Possibility Of Marking The Product With The Ce Mark. Offers Must Be Accompanied By The Ce Declaration Of Performance Issued By The Manufacturer On The Basis Of Tests Carried Out By A Notified Body Drawn Up In Accordance With The Regulation Of The European Parliament And Of The Eu Council No. 305/2011 Of March 9 2011 Laying Down Harmonized Conditions For The Marketing Of Construction Products And Repealing Council Directive 89/106/Eec (Journal Of Laws Of The European Union Of 4 April 2011 L 88/5) And Applicable National Regulations And A Summary Report Issued By A Notified Body Carrying Out The Tests, Containing All The Detailed, Valuable Test Results For Compliance With The Pn-En 12566-3+A2:2013-10 Standard.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.