GTR 66392176

Tenders Are Invited For Reconstruction Due To A Change In The Use Of Some Rooms In The Building At Ul. Jana Nowak Jeziorańskiego 53 For Residential Purposes

ICB — International Competitive Bid Closed Central Europe
Tender Information
GTR Reference
66392176
Tendering Authority
Subscribe to view
Tender No
MZB/Jezioranskiego 53 /2023
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Reconstruction Due To A Change In The Use Of Some Rooms In The Building At Ul. Jana Nowak Jeziorańskiego 53 For Residential Purposes
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
07-07-2023 Closed
Work Detail
1. The Subject Of The Contract Is A Change In The Use Of Part Of The Premises Of The Former School For Residential Purposes, As A Result Of Which A Multi-Family Residential Building Will Be Erected At The Address: Ul. Jana Nowaka - Jeziorańskiego 53, 25-432 Kielce, Plot No. 869/10, 869/33 Precinct: 0007, Reg. Unit: 266101_1 City Of Kielce In Accordance With The Design Documentation And The Diagram Of Work Stages Contained In The Documentation, Bill Of Quantities And Specification Technical Execution And Acceptance Of Works. After The Reconstruction, It Will Be A Multi-Family Residential Building. The Project Consists In The Reconstruction Of The Existing Building Of The Former School With The Change Of Use For Residential Premises. The Existing Building Built On A Rectangular Plan, Three-Storey, With A Basement. It Is Designed To Preserve The Existing Simple Shape And The Basic Dimensions Of The Building. 21 Apartments Are Designed On 3 Above-Ground Floors - 7 Apartments On Each Floor, With Associated Loggias Built Into The Body Of The Building. Storage Rooms As Well As Technical And Utility Rooms Have Been Designed In The Basement Of The Building. The Scope Of Works Of The Subject Of The Order Includes: A) Demolition Works: Demolition Of External Longitudinal Curtain Walls; Demolition Of Partition Walls, Disassembly Of The Existing Window And Door Carpentry, Demolition Of The Ceiling In The Place Of The Designed Staircase And Elevator Shaft, Demolition Of Staircases, Dismantling Of Curbs, Concrete Edges, Pavement With Removal Of Rubble, Earth And Material From Disassembly, Transfer Of Materials For Disposal And Cleaning Construction Site B). Construction Works: Making A Grid Of Steel Sections In Order To Make Openings In The Ceiling And As A Support For The Existing Walls, Making A Reinforced Concrete Staircase With An Elevator Shaft, Plugging And Bricking Up Openings In The Basement And Ceiling, Making New Window And Door Openings In Prefabricated Wall Elements, Lintels In Structural Walls, Execution Of Balconies, Roofing Slabs, Partition Walls C). Internal Central Heating, Water And Sewage Systems As Well As External Sanitary And Rainwater Sewage Systems. The Building Has A Central Heating System. And Wod-Kan. Heat For Central Heating And Hot Water Is Taken From The District Heating Network. In The Part Of The Building Subject To Change Of Use, The Existing Installations Should Be Dismantled. Designed Central Heating Installations And Hot Water Will Be Connected Directly To The Low Performance Node Located In The Middle Of The School. Sanitary And Rainwater From The Building Will Be Discharged Outside The Building To The Existing Connections. Parking Drainage Will Be Connected To The External Rainwater System. In Particular, The Scope Of Works Will Include: - Cold And Hot Water, Circulation And Sewage Installations - Rainwater Drainage Connection - Sanitary Sewage Connection - Central Heating Installations D). Electrical Installations: Execution Of Power Supply For Switchgears, Delivery And Assembly Of Switchgears, Execution Of Cable Routes, Execution Of Power Supply Installation, Execution Of Basic Lighting Installation, Execution Of Emergency And Evacuation Lighting Installation, Installation Of Plug Sockets, Execution Of Call System Installation, Execution Of Intercom Installation, Rtv And Rtv Installation Lan, Earthing And Lightning Protection Installation, As-Built Measurements; E). Road Works: Preparatory Works, Earthworks, Demolition Works, Execution Of Curbs, Fences And Edges, Execution Of Sidewalks, Access Roads And Parking Spaces, Execution Of Regulatory Works, Execution Of Lawns And Execution Of Geodetic As-Built Inventory - F). Photovoltaic Installation, Designed Photovoltaic Modules Will Be Mounted On The Roof Of The Building Which Is Part Of The Complex. Installation On A Dedicated Mounting Structure. The Connected Modules Will Be Connected To The Inverter With A Double-Insulated Cable, Resistant To Uv Radiation And Changing Weather Conditions, Dedicated To Photovoltaic Applications. The Inverter Will Be Connected In Parallel To The Existing Electrical Installation Of The Facility Using A Cable Designed To Work With Alternating Current. Note. In The Design Documentation, The Apartment No. 1-F Was Indicated As Adapted For People With Disabilities, But Due To The Size Of The Apartment, It Does Not Meet The Minimum Requirement Of 5% Of Housing Units Intended For Families Referred To In Art. 4 Section 3 Of The Act Of November 4, 2016. About Support For Pregnant Women And Families For Life. Therefore, Pursuant To Art. 13 Sec. 4 Of The Act Of December 8, 2006. The Ordering Party Changes The Premises No. 1-F To The Premises No. 1-G As The One That Is Adapted For The Disabled.2. A Detailed Description Of The Subject Of The Contract And The Scope Of Works Covered By The Subject Of The Contract And The Conditions For Their Execution Are Specified In: • Building Design - (Appendix No. 10 To The Tor), • Technical (Executive) Design - (Appendix No. 11 To The Tor), • Bills Of Quantities - (Appendix No. 9 To The Swz), • Draft Provisions Of The Contract - (Appendix No. 5 To The Swz), • Material And Financial Schedule - (Appendix No. 8 To The Swz), • Technical Specification For The Execution And Acceptance Of Works - (Appendix No. 12 To The Swz), • Implementation Order Is Subject To Polish Law, Including In Particular The Act Of September 11, 2019 - Public Procurement Law (Journal Of Laws Of 2022, Item 1710, As Amended), The Act Of July 7, 1994. – Construction Law (Journal Of Laws Of 2023, Item 682, As Amended), And In Matters Not Covered By The Public Procurement Law, The Civil Code Of 23 April 1964 (I.E. Of 2022, Item 1360, As Amended) And The Provisions Referred To In Swz. 3. The Contracting Authority Requires That The Contractor Familiarize Himself With The Area Indicated In The Tor Where The Works Will Be Carried Out And Obtain All Information That May Be Necessary To Prepare The Offer. The Ordering Party Will Reject The Contractors Offer Pursuant To Art. 226 Section 1 Point 18 Of The Public Procurement Law, If It Is Submitted Without A Site Visit. The Contracting Authority Places Full Documentation Of The Subject Of The Order On The Website: Https://Platformazakupowa.Pl/Pn/Mzb_Kielce4. In Order To Get Acquainted With The Construction Site And The Scope Of Works, The Employer Provides For A Site Visit Of The Contractors At The Place Of The Works, I.E. In Kielce, Ul. Nowaka - Jeziorańskiego 53 (Construction Site) On June 28, 2023. From 10:00 To 12:00 11:005. In The Event Of A Change In The Date Of The Meeting, The Contractors Will Be Informed By Posting Information On The Website: Https://Platformazakupowa.Pl/Pn/Mzb_Kielce In The Announcements Section.6. The Bill Of Quantities Is Only An Auxiliary Material And Is Of Informative Nature For The Preparation Of The Valuation.7. Pursuant To Art. 95 Section 1 Of The Public Procurement Law, The Employer Requires That Persons Performing Physical Work Be Employed By The Contractor Or Subcontractor Under An Employment Contract In The Manner Specified In Art. 22 Par. 1 Of The Act Of June 26, 1974 - Labor Code (Journal Of Laws Of 2022, Item 1510, As Amended). The Obligation To Employ Under An Employment Contract Does Not Apply To Persons Who Will Manage The Works Covered By The Order And Who May Be Employed By The Contractor Also Under Other Employment Relationships Permitted By Law. Before Signing The Agreement, The Contractor Or Subcontractor Will Indicate In Appendix 1 To The Agreement The Persons Who Will Perform The Order In The Scope Referred To Above And Will Be Obliged To Submit A Statement On Meeting The Employment Requirement Under An Employment Contract In Order To Document This Staffing. The Ordering Party Reserves The Right To Carry Out An On-Site Inspection Of The Subject Of The Agreement In Order To Verify Whether The Persons Performing The Activities Related To The Execution Of The Order Are Persons Indicated By The Contractor/Subcontractor. Changing The Persons Referred To Does Not Require An Annex To The Agreement (The Contractor/Subcontractor Submits A Correction To The List Of Persons Performing The Order For The Information Of The Ordering Party). The Method Of Verifying The Employment Of These Persons Entitles The Ordering Party To Control The Contractors Compliance With The Requirements Referred To Above And The Sanctions Specified In The Draft Provisions Of The Contract (Appendix No. 5 To The Swz) For Failure To Meet These Requirements. 8. The Contractor Undertakes To Perform The Order In Accordance With The Material And Financial Schedule Approved By The Employer (Appendix No. 8 To The Swz) In Accordance With § 10 Of The Draft Provisions Of The Contract (Appendix No. 5 To The Swz). 9. The Required Minimum Guarantee Period For The Works Performed Is 36 Months. 10. The Contractor Is Obliged To Perform The Subject Of The Contract Ensuring The Use Of Electric Vehicles Or Vehicles Powered By Natural Gas At The Levels Required By The Provisions Of The Act Of May 23, 2022 On Electromobility And Alternative Fuels (Journal Of Laws Of 2023, Item 875, As Amended). . Amended).
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
d22d93ab-a909-402e-8ea8-55461526d5d8.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders