GTR 66330457
Tenders Are Invited For Selection Of A Contractor For The Reconstruction Of The Building Of The Aviation Science Facilities In Wrocław, In Order To Establish An Industry Skills Center In The Field Of Industrial Automation At Lzn In Wrocław
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
66330457
Tendering Authority
Subscribe to view
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Selection Of A Contractor For The Reconstruction Of The Building Of The Aviation Science Facilities In Wrocław, In Order To Establish An Industry Skills Center In The Field Of Industrial Automation At Lzn In Wrocław
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
06-07-2023
Closed
Work Detail
1. The Subject Of The Public Procurement Is The Performance Of Construction Works In The System - Design And Build - Consisting Of: Stage I1) Performance Of Design And Technical Documentation Regarding The Reconstruction Of The Existing Building On The Premises Of Lotnicze Zakłady Naukowe In Wrocław, At Ul. Kiełczowska 43 - For A Public Utility Building With An Educational Function, Comprising Seven Industry Laboratories (Electronics And Assembly Studio, Modern Control Systems Studio, Automation Lab, Automation And Robotics Lab, Intralogistics Lab, Industry 4.0 Studio, Stationary Industry Training Studio) And A Social Room, Air Compression Room, Administrative Rooms (At Least 2 Rooms), Conference Room, Womens And Mens Toilets (Including Toilets For The Disabled), Storage Room, Passageways - Along With Making The Necessary Arrangements And Obtaining The Necessary Decisions Or Certificates - At The Appropriate (According To Powers And Properties) Of The Authorities. The Detailed Scope Of The Development Of The Design Documentation Should Include: A) The General Concept Agreed With The Employer; B) Execution Of Fire Protection Expertise For The Entire Building - For This Purpose, The Employer Will Provide The Contractor With The Appropriate Power Of Attorney To Submit It To The Competent Commander Of The State Fire Service - In Order To Obtain His Decision. Preparation Of A Construction Project With A Set Of Required Agreements In The Following Industries: - Studio Technology - Architecture - Land Development - Safety And Health Instructions To The Extent Necessary To Perform The Contract, In The Scope Of Adaptation To Applicable Regulations, Including Fire Regulations And Adaptation To The Requirements Of A Construction And Appraiser Fire Protection D) Preparation Of Technical Designs Broken Down By Industries: - Architecture - Industrial Automation Technology With Room Equipment - Water And Sewage Systems, Central Heating, Technical Gases - Cooling, Ventilation And Air Conditioning Systems (If Necessary) - Electrical And Ict Installations - Installations Fire Alarm System (Selection Of Loop Elements), Smoke Detectors (Smoke Detectors), Determination Of Requirements For Cable Routes (If Necessary) - Land Development With Planting Vegetation) Preparation Of Investment Cost Estimates And Bills Of Quantitiesf) Preparation Of Technical Specifications For Works Execution And Acceptanceg) Preparation Of An Expert Opinion On The Load Capacity Of Ceilings In Order To Adapt Them To The Creation Of Studiosh) Other Documents, Including Opinions And Expert Opinions, Necessary For The Proper Execution Of The Design Documentation,I) Obtaining A Building Permit Or Notification, If The Need To Obtain Them Results From The Provisions Of The Construction Law Stage Ii2 ) Implementation Of Construction Works In The Field Of Reconstruction Of The Building Along With The Adaptation To Applicable Fire Regulations, In Order To Create The Industry Skills Center At Lotnicze Zakłady Naukowe In Wrocław - Based On Redesigned Documentation And Obtained Permits - If Necessary. The Scope Of Works Necessary To Be Performed Includes In Particular: A) Preparatory And Demolition Works: - Disassembly Of The Central Heating System - Disassembly Of The Electrical And Telecommunication Installation - Disassembly Of The Existing Floor Layers - Disassembly Of Door And Window Frames - Removal Of Loose Plaster - Demolition Of The Existing Land Development Adjacent To The Of The Building - Removal Of Loose Plaster On The Facade Of The Building Up To The 2Nd Floor B) Construction Works: - Fencing Of The Construction Site, - Reinforcement Of The Ceilings In Accordance With The Requirements Of The Expert Opinion - Preparation Of The Surface For The Execution Of Floor Layers - Execution Of New Floor Layers And Finishing Layers - Modernization Of The Passenger Lift - Supplementing The Plaster - Execution Of Finishing Coats - Execution Of A System Suspended Ceiling - Adaptation Of Communication Routes To The Applicable Regulations And Separation Of Fire Protection Zones - Replacement Of Door And Window Joinery - High Standard Of Toilet Finishing, Sanitary Equipment Based On The Functioning Of A Photocell, Access Control, Toilet For The Disabled With All Amenities, Walls Finished With Pvc Lining Adapted To Public Utility Buildings - Double Painting Of Walls With Varnish To A Height Of 2 M - Creation Of Glass Soundproof Walls Separating The Studios From Communication Routes. - Land Development On The Plot Belonging To The Building - Repair Of Cracks On The Buildings Facade - Construction Of A New Facade On The Building Up To The Height Of 2 Storeysc) Installation Works: - Replacement Of The Electrical System - Construction Of A New Switchboard - Emergency Lighting Should Be Installed - Emergency Lighting Should Be Installed - Execution Of A Fire Protection System - Execution Of A Notification System - Assembly Of General Installations Necessary For The Proper Functioning Of The Rooms, As Well As Assembly Of Installations Necessary For The Proper Functioning Of The Equipment Located In The Laboratories. - Replacement Of The Central Heating Installation - Installation Of Technical Gases Necessary For The Operation Of The Planned Workshops, Including Compressed Air D) Land Development: - Construction Of Sidewalks Around The Building In Accordance With The Guidelines Of The Relevant Services - Removal Of Inactive Elements Of Land Development, Including A Lighting Pole - Lighting Of The Area In Question - Construction Of A Relaxation Zone With Benches And Tables Etc. - Planting Plants And Greenery Care
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
f7037fb2-2a43-40ec-939c-d88fa810001e.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.