GTR 66091043
Tenders Are Invited For Improvement Of Road Safety At Pedestrian Crossings Along Dk40 In Łąka Prudnicka, Mochów And Głogówek
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
66091043
Tendering Authority
Subscribe to view
Tender No
O/Op.D-3. 2411.28.2023
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Improvement Of Road Safety At Pedestrian Crossings Along Dk40 In Łąka Prudnicka, Mochów And Głogówek
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
30-06-2023
Closed
Work Detail
The Subject Of The Contract Is Improvement Of Road Safety At Pedestrian Crossings Along Dk40 In Łąka Prudnicka, Mochów And Głogówek. Within The Subject Of The Contract, The Following Works In Particular Should Be Designed And Performed: 1. Execution Of Dedicated Lighting Along With A Transitional Section Of Approx. 100 M (From The Direction Of Prudnik), At The Pedestrian Crossing On The Main Route (Ul. Głuchołaska) Of National Road No. 40 At Km 14+919.2. Execution Of Dedicated Lighting And Installation Of Textured Tiles At The Pedestrian Crossing On The Main Route (Ul. Piastowska) Of National Road No. 40 At Km 39+132.3. Execution Of Dedicated Lighting And Installation Of Textured Tiles At The Pedestrian Crossing On The Main Route (Ul. Piastowska) Of National Road No. 40 At Km 39+215.4. Execution Of Dedicated Lighting And Installation Of Textured Tiles At The Pedestrian Crossing At The Inlet Of The National Road No. 40 At Km 39+255.5. Implementation Of Dedicated Lighting, Replacement Of The D-6 Vertical Marking, Correction Of The Location Of The Pedestrian Crossing With The Necessary Correction Of Curbs And Installation Of Textured Tiles On The Pedestrian Crossing On The Main Route (Piastowska Street) Of The National Road No. 40 At Km 39+360.6. Implementation Of Dedicated Lighting, Installation Of Textured Tiles, Change Of The Location Of The Pedestrian Crossing Along With The Necessary Correction Of Curbs On The Pedestrian Crossing On The Main Route (Piastowska Street) Of National Road No. 40 At Km 40+350.7. Implementation Of Dedicated Lighting, Installation Of Textured Tiles, Widening Of The Pavement Along With The Installation Of Sectional Fences. Installation Of The U-12A Fencing Requires Widening The Pavement To A Width Of 3.0 M, Replacing The D-6 Vertical Marking At The Pedestrian Crossing At The Subordinate Inlet (Ul. Wodna) Of National Road No. 40 At Km 40+420.8. Implementation Of Dedicated Lighting, Renewal Of Vertical And Horizontal Markings, Installation Of Textured Tiles, At The Pedestrian Crossing At The Subordinate Inlet (Ul. Głubczycka) Of National Road No. 40 At Km 40+421.9. Execution Of Dedicated Lighting And Installation Of Textured Tiles At The Pedestrian Crossing On The Main Route (Piastowska Street) Of National Road No. 40 At Km 40+576.10. Execution Of Dedicated Lighting And Installation Of Textured Tiles At The Pedestrian Crossing At The Minor Inlet (Ul. Piotra Skargi) Of National Road No. 40 At Km 40+643.11. Execution Of Dedicated Lighting And Installation Of Textured Tiles At The Pedestrian Crossing On The Main Route (Ul. Piotra Skargi) Of National Road No. 40 At Km 40+706.12. Execution Of Dedicated Lighting And Installation Of Textured Tiles At The Pedestrian Crossing On The Main Route (Ul. Piotra Skargi) Of National Road No. 40 At Km 40+779.13. Execution Of Dedicated Lighting And Installation Of Textured Tiles At The Pedestrian Crossing At The Subordinate Inlet (Ul. Adama Mickiewicza) Of National Road No. 40 At Km 40+796.14. Execution Of Dedicated Lighting And Installation Of Textured Tiles At The Pedestrian Crossing At The Subordinate Inlet (Ul. Tadeusza Kościuszki) Of National Road No. 40 At Km 40+801.15. Implementation Of Dedicated Lighting, Installation Of Textured Tiles, Change Of The Crossing Location Along With The Necessary Correction Of Curbs On The Pedestrian Crossing On The Main Route (Ul. Plac Wolności) Of The National Road No. 40 At Km 40+823.16. Execution Of Dedicated Lighting, Installation Of Textured Plates And Installation Of U-12C Blocking Posts At The Pedestrian Crossing At The Subordinate Inlet (Ul. 3 Maja) Of National Road No. 40 At Km 40+919.17. Execution Of Dedicated Lighting And Installation Of Textured Tiles At The Pedestrian Crossing On The Main Route (Ul. Plac Wolności) Of National Road No. 40 At Km 40+897.18. Execution Of Dedicated Lighting And Installation Of Textured Tiles At The Pedestrian Crossing On The Main Route (Ul. Dworcowa) Of National Road No. 40 At Km 40+938.19. Execution Of Dedicated Lighting At The Pedestrian Crossing On The Main Route (Ul. Dworcowa) Of National Road No. 40 At Km 41+276.20. Performing Other Activities For The Purpose Of Implementing The Projects Listed In Point 1-19 And Those Resulting From The Completion Of The Design Stage, E.G.: - Site Inspection To Identify The Subject Of The Contract. - Reconstruction Of Colliding Devices And Networks Of The Existing Underground And Above-Ground Infrastructure: Teletechnical And Power Devices, Water Supply Networks, Rainwater And Sanitary Sewage Systems, Gas And Heating Networks, Drainage And Hydrological Devices, Etc. - Reconstruction Of The Damaged Surface During The Execution Of The Task. - Possible Correction Of Curbs Or Possible Replacement Of Damaged Curbs Within The Indicated Pedestrian Crossings. - Securing And Marking The Site During The Execution Of Works. Design Solutions, Taking Into Account The Materials Used For Approval. - Preparation Of Design Documentation For Lighting Pedestrian Crossings Along With The Necessary Arrangements. - Preparation Of Design Documentation For The Construction Of Lighting Of Transition Sections Or Adaptation Of Road Lighting For Transition Sections Along With The Necessary Arrangements. - Road Safety Audit. Obtaining On Behalf Of The Contracting Authority The Necessary Arrangements, Opinions, Decisions And Permits Required For The Proper Performance Of The Task, Including Arrangements With The Managers Of Subordinated Roads, As Well As Water-Legal Permits (New Or Changes Obtained So Far By The Ordering Party). - Preparation Of The Application And Obtaining A Certificate Of No Grounds For Raising Objections To The Notification Of Construction Works. Works Based On The Agreed And Approved Executive Designs. - Preparation Of The As-Built Geodetic Inventory (Of The Facility With The Connection). - Installation Of The Necessary Signage And Road Safety Devices In Accordance With The Completed Design Stage. - Preparation Of As-Built Documentation, Taking Into Account Changes And Corrections Introduced During The Works Construction. - Carrying Out Tests And Inspections Provided For The Above-Mentioned Works. - Carrying Out Tests And Inspections Provided For The Above-Mentioned It Is Also Necessary To Make Arrangements With Public Road Administrators And Real Estate Owners Regarding The Restoration Of Roads And Real Estate Used By The Contractor During Construction To A Condition Not Worse Than Before The Commencement Of Construction And To Implement The Above-Mentioned Liabilities.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
61008613-83cb-47ba-b0b3-6a442f1cfc40.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)