GTR 66053182
Quotation Are Invited For Comprehensive Amc Of Daikin Water Cooled Chillers
NCB — National Competitive Bid
Closed
Asia
Tender Information
GTR Reference
66053182
Tendering Authority
Subscribe to view
Tender No
2332301319
Financer Name
Self-Funded
Work Title
Quotation Are Invited For Comprehensive Amc Of Daikin Water Cooled Chillers
Bid Type
NCB — National Competitive Bid
Country
Subscribe to view
Geographical Region
Asia
Political Region
Arab World,Gulf Cooperation Council GCC,Middle East,Middle East and North Africa MENA
Last Date of Bid Submission
20-06-2023
Closed
Work Detail
Quotation Are Invited For Comprehensive Amc Of Daikin Water Cooled Chillers. Comprehensive Amc Of Daikin Water Cooled Chillers At Ruwaiyah Dp Complex. A. Scope Of Work: - ·#The Contractor Is Required To Quote Lump Sum Price For Comprehensive Annual Maintenance Of Water-Cooled Chillers Including Spares Such As Display Board, Mother Board, C Ontrol Board And All Type Of Circuits Boards, Transducer, Leaving & Entering Sensors, Refrigerant Gas, Drier Filters, Oil, Guide Van Actuator And All Are Consumable Parts. ·#The Quotation Will Be Submitted As Per Dewa Specification And Survey Only. ·#Spare Parts R Equired To Carry Out The Rectification Activity Should Be Arranged At The Earliest Also Contractor Should Keep Spare Parts In The Bu Ilding In Order To Keep The Equipment Down Time To Minimum And Must Be Genuine Spares From Oem Or Oem Recommended Vendors #During Ppm Activities Contractor To Provide More Manpower To Carry Out Preventive Maintenance And To Be Completed As Per The Dewa Schedule. ·#All The Materials In General Will Conform As Per Latest Standards And Shall Be Submitted To Dewa For Engineers Approval. ·#The Co Ntractor Is Required To Take All Precaution. So As Not, Damage Any Of The Existing Equipment/ Structure Ete# ·#The Contractor Shall Deploy The Skilled Ac Technicians For Carrying Out The Maintenance Works. The Technicians Shall Be Approved By Dewa Engineer. ·#Shou Ld We Experience A Breakdown In Any Of Equipment/System At Any Time Of The Day Or Night, You Will Respond To Our Request With Your 2 4 Hours Emergency Call Out System Available 7 Days A Week All Year Round. Responding Time To Breakdown Calls Is Within 30 Minutes Af Ter Receipt Of Notification As Per Below Two Sla Conditions. ·#All Maintenance Activities Shall Be Performed In Presence/ Supervisio N Of Competent Supervisor. ·#Ppm Reports To Be Submitted With Their Own Check List And Dewa Check List As Well On A Quarterly Basis For Our Verification. ·#Contractor Is Required To Visit Every Month To Check Chiller Performance And Alarms To Be Verified And Repor Ts To Be Submitted Accordingly. ·#Contractor To Be Carried Out Descaling Of Condenser Tubes And Evaporator Tubes Once Per Year Or As Per Site Requirement. ·#Contractor To Be Perform Eddy Current Test For Condenser Tubes Once Per Year Or As Per Site Requirement And Reports To Be Submitted Accordingly #Based On The Eddy Current Reports Contractor To Be Plugged The Damaged Condenser Tubes As Pe R Site Requirement. ·#Contractor To Be Arranged Recovery Machine To Recover The Refrigerant In The System If Necessary, As Per Site Requirement. ·#Contractor To Be Rectified The Leakage (Oil & Refrigerant) In The System As Per Site Requirement. ·#Contractor To Be Supply The Refrigerant Gas To Refill In The System As Per Site Requirement. ·#Building Maintenance Contract To Be Handed Over After The Amc Tenure If The Amc Awarded To Another Party For Upcoming Year With Presence Of Dewa Supervisor Also Snag To Be Cleared Within 15 Days Dewa Supervisor Will Evaluate Snags Which Is Valid Or Invalid, If Failed To Clear The Snags As Per Sla, Dewa Will Get The Rectification Done Through Third Party And The Respective Cost Shall Be Deducted From Payment. ·#Contractor To Share Official Email I D /Call Center Number To Dewa For Forwarding And Registering Complaints. ·#Contractors To Be Submitted Their Own Check List For The Corrective Maintenance And Consumable Items To Be Mentioned For Dewa Verification And Record. ·#Corrective Maintenance Reports To Be Submitted Within Three Working Days With Their Own Service Report To Dewa Supervisor For Verification And Record. ·#Training To Be Provided By Specialized Trainer To Our Dewa Staffs. ·#Risk Assessment, Method Of Statement And Action Plan To Be Submitted Before Pr Oceeding Work, Such As Major Ppm And Corrective Maintenance. ·#The Contract Can Be Terminated By Employer Qty: 4 Comprehensive Amc Of Daikin Water Cooled Chillers At Ruwaiyah Dp Complex As Per Attached Specification. Standard Terms & Conditions 1) Prices Should Be Ddp Delivery Duty Paid At Dewa Stores. 2) Quotation To Be Submitted Only In Local Currency U.A.E Dirhams 3) Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material 4) No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company, And Your Participation In Dewa Tenders / Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest. Supplier Registration: Https://Srm.Dewa.Gov.Ae/Irj/Portal/Anonymous/Regis Tender Link : Https://Www.Dewa.Gov.Ae/Api/Rfxdownload/Get/2332301319
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
ec15d4ca-f1c6-4286-893e-efd3429ba44c.pdf
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.