Tenders Are Invited For Construction Of A Pedestrian And Bicycle Path Along Ul. Polna In Komorniki And Ul. Komornicka In G uch w

Tender Detail

65809074
ZP.271.16.2023
Self-Funded
Tenders Are Invited For Construction Of A Pedestrian And Bicycle Path Along Ul. Polna In Komorniki And Ul. Komornicka In G uch w
ICB
Central Europe
European Union
29-06-2023

Work Detail

1. The Subject Of The Contract Includes The Construction Of A Pedestrian And Bicycle Path Along Ul. Polna In Komorniki And Ul. Komornicka In G uch w.2. The Detailed Scope Of Works, In Accordance With Which The Works Should Be Performed, Is Included In The Design Documentation, Stwior, Bills Of Quantities, Constituting Attachments To This Swz.3. Site Inspection: The Contracting Authority Provides For The Contractors Obligation To Carry Out A Site Inspection In Order To Check The Conditions Related To The Performance Of The Works Being The Subject Of The Contract. The Costs Of Inspection Of The Construction Site Are Borne By The Contractor. Date And Rules For Participation In The Site Inspection: The Site Inspection Will Take Place On June 16, 2023. Meeting Of Contractors At 10.00 At The Building Of The Polish Post Office At Ul. Polna 120 In Komorniki. Contact Persons: Daria Stefaniak, Arkadiusz Klemczak. Representatives Of The Contractor Will Be Required To Sign A List Of Participation In The Site Inspection, Indicating The Name Of The Contractor. Pursuant To Art. 226 Sec. 1 Point 18 Of The Public Procurement Law, The Offer That Has Been Submitted Without The Site Inspection Will Be Subject To Rejection.4. The Contractor Is Obliged To Develop As-Built Documentation In 5 Copies In Paper And Electronic Version On A Cd - 2 Copies And Submit It To The Employer.5. A Detailed Description Of The Conditions For The Performance Of The Subject Of The Contract Is Included In The Draft Provisions Of The Contract Constituting Appendix No. 10 To Swz.6. Throughout The Period For Which The Agreement Will Be Concluded, The Contractor Is Obliged To Have A Civil Liability Insurance In The Scope Of Its Activities Related To The Subject Of The Contract For The Guarantee Sum Not Less Than Pln 1,500,000.00 (In Words: One Million Five Hundred Thousand Zlotys 00/100), Valid No Later Than From The Date Of Signing The Contract Until The Final Acceptance. The Ordering Party Shall Accept The Document Of Third Party Liability Insurance Held By The Contractor In The Scope Of The Activity Related To The Subject Of The Order For The Guarantee Sum Required By The Ordering Party, Which Will Be Concluded For An Annual Period And Will Be Renewable With Continuity Of Insurance Protection Until The Final Acceptance. In Such A Situation, The Contractor Is Obliged To Provide The Ordering Party With A Valid Third Party Liability Insurance Document Within The Scope Of The Activity Related To The Subject Of The Contract Within 7 Days From The Date Of Issuing This Document At The Latest.7. Warranty And Warranty - Required Warranty Period - According To The Offer, Minimum 36 Months, Maximum 84 Months. - The Scope Of Warranty Rights Is Regulated By The Provisions Of The Civil Code. 8. Information On The Use Of Products, Materials And Equivalent Technologies. In The Case Of Names Of Materials Used In The Documentation Of The Procedure, They Should Be Understood As Exemplary - With Parameters Desired By The Ordering Party. This Means That The Ordering Party Allows In Each Case To Use A Material Equivalent In Terms Of The Main (Essential) Technical And Operational Parameters, While Maintaining At Least The Same Level Of Quality, Durability, Functionality And Compatibility With Other Materials Used (Built-In) During The Execution Of The Order. Only Such Changes Of Materials Are Allowed, Which Are Within The Framework Of The Contained Construction, Technological And Technical Solutions. In Such A Situation, The Ordering Party Requires The Submission Of Relevant Documents Confirming The Parameters Of Materials And Devices. If It Intends To Use Any Solutions Or Equivalent Materials, The Contractor Is Obliged To Describe Them In Detail In The Offer And Demonstrate Their Equivalence. In Such A Case, The Contractor Shall Attach To The Offer A List Of Equivalent Solutions Together With Its Description Or Standards. Pursuant To Art. 101 Sec. 4 Of The Public Procurement Law, If The Documents Describing The Subject Of The Contract Contain A Reference To The Standards, Technical Assessments, Approvals, Technical Specifications And Technical Reference Systems Referred To In Art. 101 Sec. 1 Point 2 And Sec. 3 Of The Public Procurement Law, And Such References Were Not Accompanied By The Phrase Or Equivalent, The Employer Allows Solutions Equivalent To Those Described In Each Such Standard, Technical Assessment, Approval, Technical Specification And In Each Technical Reference System. According To Art. 101 Sec. 5 Of The Public Procurement Law, The Contractor Who Refers To Solutions Equivalent To Those Described In The Documents Is Obliged To Prove It By Attaching To The Offer Relevant Evidence Referred To In Art. 104-107 Of The Public Procurement Law That The Proposed Solutions Meet The Requirements Specified In The Description Of The Subject Of The Contract To An Equivalent Degree. The Offered Devices And Equivalent Materials Must Have The Appropriate Attestations Or Admissions To Economic Circulation Required By Law. All Requirements Set Out In The Documents Indicated In The Design Documentation Are Requirements Minimum, And Their Fulfillment Is Mandatory. Failure To Meet The Above Minimum Requirements Will Result In The Rejection Of The Tender As Inconsistent With The Terms Of The Contract Pursuant To Art. 226 Sec. 1 Point 5 Of The Public Procurement Law.9. Requirements For The Employment By The Contractor Or Subcontractor Of Persons On The Basis Of An Employment Relationship 22 1 Of The Act Of June 26, 1974 - Labor Code. Type Of Activities Necessary For The Performance Of The Contract, To Which The Requirements Of Employment On The Basis Of An Employment Relationship By The Contractor Or Subcontractor Of Persons Performing Activities During The Performance Of The Contract Apply: Earthworks, Paving Works, Construction Roads, As Well As Equipment Operators. The Method Of Verifying The Employment Of The Above. Persons, The Employers Rights To Control The Contractors Compliance With The Requirements Related To The Employment Of Persons And The Sanctions For Failure To Meet These Requirements Are Specified In 6 Of The Draft Provisions Of The Contract (Annex 10 To The Tor).

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail