GTR 65754796

Tenders Are Invited For Construction And Reconstruction Of The Water Supply System Intended For Human Consumption And The Collection Of Domestic Sewage In The Commune Of Jaświły

ICB — International Competitive Bid Closed Central Europe
Tender Information
GTR Reference
65754796
Tendering Authority
Subscribe to view
Tender No
Rl.271.11.2023
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction And Reconstruction Of The Water Supply System Intended For Human Consumption And The Collection Of Domestic Sewage In The Commune Of Jaświły
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
21-06-2023 Closed
Work Detail
1. The Subject Of The Contract Is The Preparation Of Design Documentation And Construction Works In The Design And Build System As Part Of The Investment Entitled: Construction And Reconstruction Of The Water Supply System Intended For Human Consumption And The Collection Of Domestic Sewage In The Jaświły Commune, Consisting Of: - Reconstruction And Expansion Of The Water Treatment Plant In Mikicin - Expansion Of The Municipal Sewage Treatment Plant In Dolistowo Nowe - Construction Of 3 Household Sewage Treatment Plants In The Commune Of Jaświły - Construction Of A Water Supply Network With Connections In The Villages Of Dolistowo Stare And Dolistowo Nowe1.1. Water Treatment Plant In Mikicin - The Planned Scope Of Works Includes: A) Disassembly Of The Existing Equipment, B) Reconstruction And Extension Of The Existing Building, Adapting It To Current Requirements, C) Construction Of Equalization Tanks With A Capacity Of 100 M3 Eachd) Construction Of A Settling Tank, Washings) Construction Of Two Tanks With A Capacity Of 2 M3 Each For Domestic Wastewater And Wastewater From The Chlorinator Roomf) Construction Of Underground Water Supply, Sewage And Electrical Systemsg) Construction Of Access Roads To The Facilitiesh) Construction Of Fencing1.2. Sewage Treatment Plant In Dolistowo Nowe - The Planned Scope Of Works Includes: A) Preparation Of The Site For The Construction Of A Sand Screen B) Construction Of A Sand Screen With A Max. Capacity Q = 20 Dm 3 /S With Necessary Installations1.3. Household Sewage Treatment Plants - The Planned Scope Of Works Includes: A) Design And Construction Of 3 Complete, Biological Sewage Treatment Plants With A Capacity Of Up To Qdśr = 1.20 M3 / Db Each B) Construction Of Necessary Underground Sewage And Power Systems1.4. Construction Of The Water Supply Network - The Planned Scope Of Works Includes: A) Construction Of The Water Supply Network Made Of Pe Rc Ø 110 Mm Pipes, Approx. 620 Running Meters Long) Water Supply Connections In The Right-Of-Way Made Of Pe Rc Ø 32 Mm Pipes, Approx. 6 Months Long, Location Of The Water Supply On Municipal Roads 2. Scope Of All Works To Be Performed Under The Contract: The Scope Of The Contract Includes: - Development Of Maps For Design Purposes - Preparation Of Necessary Preliminary Materials For The Implementation Of The Investment - I.E. Information Card Of The Project In Order To Obtain The Decision On Environmental Conditions For The Implementation Of The Investment And The Decision On The Location Of The Public Purpose Investment, If Required, - Preparation Of Construction Designs And Obtaining For Them The Following: Opinions, Consents, Arrangements And Permits, Together With A Building Permit Or Notification Works, Including Obtaining A Positive Opinion Of The Poviat Sanitary Inspector In Mońki Regarding The Mikicin Water Treatment Plant - Performing Ground Tests, - Geodetic Services, - Performing Technical Designs In Accordance With Applicable Law, - Performing Construction And Assembly Works Based On Designs, - Conducting The Required Tests And Tests, And Preparation Of Documents Related To The Commissioning Of The Facilities For Operation And Use, - Designers Supervision, - Obtaining A Decision From The Poviat Building Supervision Inspector In Mońki For The Use Of The Suw Facility Or Submitting A Notification, - Preparation Of A Water Law Survey For Water Services Consisting In The Abstraction Of Groundwater And Discharge Of Sewage (Water Washing Water) And Obtaining A Decision On A Water Law Permit For The Mikicin Water Treatment Plant And Drawing Up A Water Law Report For The Discharge Of Treated Wastewater From The Sewage Treatment Plant In Dolistowo Nowy And Obtaining A Decision On A Water Law Permit - Ensuring A Guarantee Of Proper Performance Of Works3. The Employer Requires The Development Of Design Documentation In Accordance With Current Regulations And The Current Level Of Technical Knowledge.4. The Ordering Party Does Not Allow The Use Of Prototype Solutions.5. A Detailed Description And Method Of Task Implementation Are Presented In The Functional-Utility Program - Appendix No. 1 To The Swz.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
575e58f9-fe3d-4026-860f-47b1d155384e.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders