Quotation Are Invited For Field Application Of Uv Protection Layer For Gre Pipe & Fitting At Emirates Road Pumping Stations (Suction & Discharge Header Pipelines Outside Pump Bay Area)
Quotation Are Invited For Field Application Of Uv Protection Layer For Gre Pipe & Fitting At Emirates Road Pumping Stations (Suction & Discharge Header Pipelines Outside Pump Bay Area)
Arab World,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
12-06-2023
Work Detail
Quotation Are Invited For Field Application Of Uv Protection Layer For Gre Pipe & Fitting At Emirates Road Pumping Stations (Suction & Discharge Header Pipelines Outside Pump Bay Area) 1032301662Rfx Standard Terms & Conditions 1) Prices Should Be Ddp Delivery Duty Paid At Dewa Stores. 2) Quotation To Be Submitted Only In Local Currency U.A.E Dirhams 3) Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material 4) No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company, And Your Participation In Dewa Tenders / Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest. Supplier Registration: Https://Srm.Dewa.Gov.Ae/Irj/Portal/Anonymous/Regis 1 Item-00001 Field Application Of Uv Protection Layer For Gre Pipe & Fitting At Emirates Road Pumping Stations (Suction & Discharge Header Pipeli Nes Outside Pump Bay Area) As Per Attached Specifications Please Contact Mr. Noor (04-3229439) For Further Clarifications. 1.0#Sc Ope Of Work A.#Field Application Of Uv Protection Layer On Gre Pipes (Dn1200 & Other Sizes) & Fitting At Dip2 Pumping Station (A & B Stream Suction And Discharge Header Outside Pump Bay Area) B.#Cleaning The Area Of The Pipes Surface C.#Cleaned Area Shall Be Blo Wn Out With Air Or Cleaned Using A Clean & Dry Cotton Cloth. D.#Epoxy Resin With Mixture Of Uv Absorber To Be Applied E. Uv Inhibito R/Uv Stabilizer To Be Applied On The All Exposed Pipes. F.#Any Kind Of Lifting Tools (Tripod, Mobile Crane, Chain Block, 1 Set Pallet-Trol Ley And Scaffolding Etc.) Required To Carry Out This Job Must Be Arranged By Contractor. G.#Contractor Shall Visit The Site & Measur E The Total Pipeline Length (Exactly) Need To Be Applied Uv Protection Layer 2.0#Prior To Submission Of Quotation, The Following S Hall Be Determined Carefully: A.#The Contractor Shall Visit The Site And Make Himself Fully Familiar With The Work Scopes, Complexi Ties, Etc., Before Submitting The Quotation. B.#Dewa Will Not Accept Any Claim For Extras Beyond The Order Rates / Prices During And After The Execution Of Work Ordered. C.# The Contractor Should Submit The Time Schedule /Bar Chart Indicating Each Activity Special Notes / Instructions: Field Application Of Uv Protection Layer For Gre Pipe & Fitting At Emirates Road Pumping Stations (Suction & Discharge Header Pipelines Outside Pump Bay Area) Tender Link : Https://Www.Dewa.Gov.Ae/Api/Rfxdownload/Get/2332301250
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.