GTR 65543098
Tenders Are Invited For Reconstruction Of The Heating System In Municipal Buildings In Sokołów Budzyński
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
65543098
Tendering Authority
Subscribe to view
Tender No
GKM.272.8.2023
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Reconstruction Of The Heating System In Municipal Buildings In Sokołów Budzyński
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
19-06-2023
Closed
Work Detail
The Subject Of The Contract Is Renovation Works Related To The Reconstruction Of The Heating System Of The Solid-Burning Boiler House In The Municipal Building In Sokołów Budzyński No. 28 Located On The Plot With Registration Number 248/1. As Part Of The Subject Of The Contract, General Construction Works In The Construction, Electrical And Sanitary Industries Will Be Performed. Heat Is Generated By Two Water Boilers With A Total Power Of 115 Kw. Installation With A Heating Water Pump Circuit. Central Heating Manifold Is Located In A Room Adjacent To The Boiler Room. Installation Made Of Steel Pipes Joined By Welding. Threaded And Flanged Pipe Connections. Smoke Exhaust To An External, Single-Walled, Free-Standing Chimney On Its Own Foundation. As Part Of The Boiler Room Renovation Works, The Following Should Be Performed: Disassembly Of The Boiler Unit In The Boiler Room, Disassembly Of The Boiler Smoke Flue, Installation Of One Boiler Unit With A Total Capacity Of 95 Kw Fired With Pellets With Connection By A New Double-Walled Flue Dn 180 Mm To The Designed Chimney Dn 180, Installation Of A Feather Reel With A Feeder In Room S - Fuel Composition, Installation Of A Feeder, Installation Of A Loading Conveyor, Installation Of A Heat Buffer Tank With A Capacity Of 1000 L, Installation Of A Pump Installation Of A Compact Water Treatment Station Installation Of New Piping Made Of Steel Pipes From The Boiler To Manifolds Installation Of New Manifolds Made Of Steel Pipes With Circuits Fittings Installation Of Heat Sub-Meters In Each Section Fitting Fittings, I&C And Wiring Of Boiler Room Automatics In Accordance With The Technological Diagram (Fig. No. S-2) Or In Accordance With The Guidelines Of The Manufacturer Of The Boiler Selected For Installation In The Building · Construction Renovation Works In The Boiler Room, I.E.: - Demolition Of Partition Walls And Creation Of A Fuel Depot, - Demolition Of The Ventilation Chimney Along With Supplementing The Flat Roof - Make A Concrete Screed Made Of C16/20 Concrete, Reinforced At The Bottom With A Mesh Of #12 Steel Bars, Class B500a (Former A-Iiin), Crosswise Every 20 Cm, - Cover The Place Of The Screed With A Sheet Of Heat-Weldable Roofing Felt With An Overlap Of 25 Cm On The Existing Roofing And Make A New Additional Layer Of Roofing Felt Heat-Weldable On The Entire Roof Above The Boiler Room, - Walling Up The Indicated Openings With Aerated Concrete Blocks, Type 1200, On Thin-Joint Mortar - Replace The Window In The Boiler Room, Alu Profile, Warm, Umax = 0.9 W/M2k, - Replace The Entrance Door To Boiler Room, Steel, Insulated Umax = 1.3 W/M2k, - Supplement The Internal Plasters Cem-Lime. Category Iii, - Make New Wall Coverings Made Of Glazed Tiles Along The Entire Height Of The Rooms, Light Gray Tiles, Graphite Grouting - Paint The Ceilings With Latex Paint For Internal Painting, White - Secure The Wall Crack In The Axis Of The Flat Roof Rim By Sewing The Wall With Steel Bars #10 Mm B500a L=1.0M - Replace The Washbasin In The Boiler Room With A New Steel One, Perform Electrical Repairs, I.E.: - Replace The Entire Electrical Installation With A New One, Make Wiring Of The Installation With Copper Wires, - Use Led Lighting Fixtures - On The External Wall At The Entrance Door To The Boiler Room, Install The Main Fire Switch Pwp - In Room R - Central Heating Manifold And In Room K - Boiler Room, Make A New Equipotential Bonding Rail Made Of Fezn 25X4mm Steel Tape Scrapping And Recycling Of The Dismantled Elements Of The Boiler Room. A Detailed Description And Scope Of The Subject Of The Order For Individual Parts Of The Order Are Included In The Design Documentation, Which Includes: - Technical Documentation (Project Construction), - Bills Of Quantities (Offer Cost Estimates), - Technical Specifications For The Execution And Acceptance Of Construction Works (Hereinafter Referred To As Stwiorb). Design Documentation Is Available On The Website Of The Procedure At: Https://Ezamowienia.Gov.Pl The Above Documents Have Been Grouped Accordingly For Each Part Of The Tender Procedure And Constitute Appendix No. 9 To This Swz. Note: The Attached Bills Of Quantities (Offer Cost Estimates) Constitute The Scope Of Works Covered By This Procedure And Serve As An Aid To Contractors In Estimating Investment Costs.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
f5b415e8-ded1-44aa-a7d9-14539ff9f514.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.