GTR 65448616

Tenders Are Invited For Tidying Up The Water And Sewage Infrastructure In The Lubin Commune

ICB — International Competitive Bid Closed Central Europe
Tender Information
GTR Reference
65448616
Tendering Authority
Subscribe to view
Tender No
OR.271.28.2023
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Tidying Up The Water And Sewage Infrastructure In The Lubin Commune
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
16-06-2023 Closed
Work Detail
1. The Subject Of The Contract Is The Comprehensive Execution Of Construction Works Under The Following Tasks: Task No. 1 Entitled Expansion Of The Water Supply Network In: A) Osiek (Area Plot No. 177/126), B) Szklary Górne (Area Plot No. 6/8, 6/35), C) Krzeczyn Wielki (Area Plot No. 194, 155, 191/17) Stage Iia, Iib And Iii, Which Includes, Among Others: A) Construction Of A Network Of Approx. 131 M (Ø160 Mm) And Approx. 160 M (Ø90 Mm) Of Pe Pipes, And Installation Of Fittings And A Hydrant And Execution Of 7 Sets. Connections, B) Execution Of The Network With A Length Of Approx. 170 M From Pe Pipes (Ring System Of The Network), C) Stage Iia - Execution Of The Network De110 Mm With A Length Of Approx. 429 M And De90 Mm With A Length Of Approx. 5.8 M From Pe Pipes With Fittings And An Approach To The Hydrant, Stage Iib - Execution Of The De110 Mm Network, Approx. 766 Running Meters Long, De90 Mm, Approx. 26 Running Meters Long, De 63 Mm, Approx. 1.2 Running Meters Long, From Pe Pipes, Including Fittings And An Approach To The Hydrant, In Addition, Execution Of Approx. 247 M Of De40 Pe Pipelines, Stage Iii - Execution Of The De90 Mm Network From Pe Pipes With A Length Of Approx. 145 M With Fittings And An Approach To The Hydrant. Note. Due To The Need To Coordinate The Investment Tasks Carried Out By The Employer On The Plot 177/126 In Osiek, Consisting In The Expansion Of The Water Supply Network And The Reconstruction Of The Internal Road, The Task Related To The Water And Sewage Infrastructure (Listed Above In Point 1, Task No. 1 Item A)) Should Be Carried Out First, I.E. Before The Second Stage Of Road Reconstruction, Described In Separate Proceedings As Section C-D.Task No. 2 Entitled Expansion And Reconstruction Of The Water Supply Network In Siedlce (Area Plots No. 407, 205/20, 205/41, 205/19), Which Includes, Among Others: Execution Of The Ø160mm Pipeline With A Length Of Approx. 552M, Ø110mm With A Length Of Approx. 8 Running Meters And Ø90mm, Approx. 10.5 Running Meters Long, Made Of Pe Pipes, In Addition, 9 Sets Of Connections Ø63mm With A Length Of Approx. 32 Running Meters And Ø40mm With A Length Of Approx. 2 Running Metres. Task No. 3 Entitled Reconstruction Of The Water Supply Network Between Siedlce And Czerniec, Which Includes, Among Others: Construction Of A Ø160mm Pipeline With A Length Of Approx. 2271M From Pe Pipes With Fittings. Task No. Reconstruction And Expansion Of The Water Treatment Station In Obora (Stage Ii), Which Includes, Among Others: Reconstruction Of The Technological Building, Modernization Of The Treatment System With Replacement Of The Filtration System, Fittings, Devices And Piping, Renovation Of The Backwater Tank, Construction Of A Sewage Neutralizer, Hardening Area, Replacement Of The Fence And Entrance Gate With A Wicket, Construction Of A Lighting System, Construction Of A Pipeline For The Sewage Neutralizer Pvc Ø160, Execution Of Heating, Ventilation, Electrical And Sanitary Installations.Task No. Modernization Of The Hydrophore In Niemstów (Milosna Direction), Which Includes, Among Others: Modernization Of The Existing Water Storage Tank With All Technological And Electrical Equipment As Well As Control And Measurement Equipment And Automation (Icpia), Replacement Of Door Woodwork, Roofing Over The Entrance To The Pumping Station And Repair Of The Façade, Reconstruction Of Technological Pipelines, Installation Of A New Set Of Network Pumps Together With The I&C System; Installation Of A Water Disinfection System In The Network And Storage Tank As Well As A Monitoring And Visualization System For The Operation Of The Facility Along With Cctv Video Transmission; Construction Of A Neutralizer In A Chlorination Plant; Construction Of A New Fence For Roads, Squares, Sidewalks, Power Supply, Control And Lighting Installations, Equipping With A Power Generator.Task No. 6 Entitled Expansion Of The Water Supply Network And Sanitary Sewage Network In Zimna Woda (Area Plot No. 40), Which Includes, Among Others: Execution Of The Water Supply Network - Ø110mm Pipeline, Approx. 222.5 M Long And Ø90mm, Approx. 3.0 M Long Made Of Pe Pipes With Fittings And Construction Of A Sewage Network - Pvc Pipeline Ø200mm With A Length Of Approx. 144M; In Addition, Assembly Of 15 Sets. Tees With Fittings For Future Inclusion Of Service Recipients. A Detailed Description Of The Subject Of The Contract For The Above Tasks Is The Technical Documentation Made Available From Swz, Including I.A. Construction And Executive Designs, Technical Specifications, Bills Of Quantities And Other Materials. The Required Features Of The Construction Works Were Specified By The Contracting Authority In The Above-Mentioned Due To The Fact That The Design Documentation Made Available To The Contractors Includes, In The Case Of Some Tasks, The Execution Of A Larger Scope Of Works, The Ordering Party Informs That This Order Covers Only The Elements Described In The Above Part (Only The Stages Listed Above). The Contractor Is Obliged To Take Into Account That In The Lubin Poviat, A Change In The Geodetic Altitudinal System Took Place. Previously, The Kronstadt System Was In Force, And Now The Amsterdam Height System Is In Force. Each Time, The Geodetic Materials Contained In The Documentation Should Be Coordinated With The Materials Available At The Poviat Geodetic And Cartographic Documentation Center In Lubin And Adapted To The Current State. Of July 1, 2021 (As Amended By Resolutions Of The Council Of Ministers: No. 176/2021 Of December 28, 2021, No. 87/2022 Of April 26, 2022, And No. 205/2022 Of October 13, 2022) On The Establishment Of The Polish Governance Fund: Strategic Investments Programme, Available On The Website Https://Www.Bgk.Pl/Polski-Lad/Edycja-Prezentsza#C21554, Therefore The Contractor Will Provide Financing For The Implementation Of The Investment In The Part Not Covered By The Employers Own Share For The Period Preceding The Payment Of The Promise On The Terms Set Out In The Draft Provisions Of The Contract. If, After The Completion And Settlement Of The Procedure Resulting In The Selection Of The Contractor For The Works, Bank Gospodarstwa Krajowego Does Not Grant The Promise To The Employer Constituting The Basis For Concluding The Contract With The Contractor For The Works, It Will Not Be Possible To Sign The Contract For Construction Works Between The Ordering Party And The Contractor Of The Works. The Ordering Party Provides For Cancellation Of The Contract Award Procedure If The Above Public Funds That The Contracting Authority Intends To Allocate To Finance The Whole Or Part Of The Contract Will Not Be Awarded To It.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
48665ccc-be73-43f5-ac03-fbcebc2cf271.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders