GTR 65197168

Tenders Are Invited For Available Milejów As Part Of The Reconstruction And Renovation Of The Building Of The Milejów Commune Office

ICB — International Competitive Bid Closed Central Europe
Tender Information
GTR Reference
65197168
Tendering Authority
Subscribe to view
Tender No
IPR.271.16.2023
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Available Milejów As Part Of The Reconstruction And Renovation Of The Building Of The Milejów Commune Office
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
12-06-2023 Closed
Work Detail
4.1. The Subject Of The Contract Accessible Milejów As Part Of The Reconstruction And Renovation Of The Building Of The Milejów Commune Office Is The Performance Of Construction Works Consisting In The Reconstruction Of The Building As Part Of The Task Accessible Local Government - Grants.4.2. The Scope Of The Order Includes Construction Works, Including: - Demolition Works, - Earthworks, - Reinforced Concrete Structures, - Masonry Works, - Partition Walls, - Door Joinery, - Interior Plastering, - Facing Walls, - Painting Works, - Floors, - Locksmith Works, - Elevator - Electrical And Teletechnical Installations For The Arrangement Of The Entrance Area And Construction Of The Elevator - Installation Of The Call System - Tests And Measurements - Smoke Extraction Installations - Installation Of Mechanical Ventilation: Devices, Ventilation Ducts, Insulation, Ventilation Ducts Reinforcement, Tightness And Patency Tests - Water And Sewage Systems: Internal Sanitary Sewage System, Cold And Hot Water And Circulation Systems - Hydrant System4.3. The Scope Of The Subject Of The Contract Also Includes: − Development Of A Material And Financial Schedule For The Implementation Of The Investment, − Execution Of Works On The Basis Of Design Documentation And Technical Specifications For Works Execution And Acceptance; − Development Of As-Built Documentation In All Sectors (Including Reports, Admission Certificates, Attestations, The Guarantee Granted).4.3. In Addition, The Scope Of The Contract Includes: − Preparation Of As-Built Documentation, − Geodetic Services And Carrying Out The As-Built Geodetic Inventory, − Performance Of Operational Tests, Leak Tests, Trial Operation, In Accordance With Applicable Law And Stwiorb Provisions − Implementation Of All Necessary Works, Works And Activities That Are Necessary For The Proper Performance And Proper Completion Of The Subject Of The Procedure, Taking Into Account The Issued Administrative Decisions, Conditions, Permits, Arrangements And Applicable Construction, Environmental Protection, Sanitary And Health And Safety Regulations. Fire Protection, The Employers Requirements Specified In This Tor, − Obtaining, On Behalf Of And For The Employer, An Effective Notification Of The Commencement Of Works In The Architectural And Construction Authority Or Construction Supervision. All Costs (Including Administrative Costs) Resulting Therefrom Are Borne By The Contractor. − Undertaking All Necessary Actions And Actions In Relation To The Performed Works, Along With Full Support And Advice To The Employer In Order To Obtain An Occupancy Permit (In The Case Of The Requirements Of The Pinb In ​​Łęczna). − Preparation And Implementation Of Temporary Traffic Organization For The Duration Of Construction Works, − Preparation, Execution, Agreement And Implementation Of A Permanent Traffic Organization Design, Including Marking In The Field After Prior Agreement With The Employer, − Preparation Of A Media Meter Record Before The Start Of Their Collection And Notification Of This Fact Of The Ordering Party. In The Absence Of A Protocol For Writing Down The Media Meter By The Contractor In The Presence Of The Ordering Party, Which The Contractor Will Use During The Performance Of The Contract, It Will Be Tantamount To The Contractors Consent To Be Charged By The Ordering Party For The Used Utilities In A Flat-Rate Manner Determined By The Ordering Party During Or After The Performance Of The Contract, Note. Planning And Carrying Out Construction Works, Continuous And Uninterrupted Work Of Employees Of The Municipal Office In Milejów Should Be Provided For And Ensured In Accordance With The Designated Opening Hours.4.5. A Detailed Description Of The Subject Of The Contract Can Be Found In Appendix No. 1 To The Tor. It Consists Of The Following Documents: 1) Design Documentation; 2) Technical Specifications For The Execution And Acceptance Of Construction Works (Stwior); 3) Bills Of Quantities. Should Be Based On The Scope Indicated In The Documentation Referred To In Point 4.5. Items 1-2). The Bill Of Quantities Is Auxiliary. Occurrence Of Works Not Included In The Bill Of Quantities Or Works In A Larger Quantity Than Accepted In The Bill Of Quantities During The Performance Of The Contract Will Not Entitle The Contractor To Demand Additional Remuneration - If These Works Were Included In The Documentation Referred To In Point 4.5. Points 1-2).4.6. Equivalent Solutions. In Each Case Of Using Standards, Technical Assessments, Technical Specifications And Technical Reference Systems Referred To In Art. 101 Sec. 1 Point 2 And Par. 3 Of The Public Procurement Law, The Contractor Should Assume That Such A Reference Is Accompanied By The Words Or Equivalent. If References To Standards, European Technical Assessments, Approvals, Technical Specifications And Technical Reference Systems Are Used In The Design Documentation, The Employer Allows Solutions Equivalent To Those Described. When Analyzing The Design Documentation, The Contractor Should Assume That Each Reference Used In The Design Documentation Is Accompanied By The Word Or Equivalent. If Trademarks Are Used In The Design Documentation Or Technical Specification For The Execution And Acceptance Of Works, This Means That They Are Given As Examples And Only Define The Minimum Expected Quality Parameters And The Required Standard. The Contractor May Use Materials Or Devices Equivalent, But With Similar Or Better Technical And Quality Parameters, The Use Of Which Will In No Way Adversely Affect The Proper Functioning Of The Solutions Adopted In The Design Documentation. The Contractor Who Uses The Devices Or Materials Equivalent Will Be Obliged To Demonstrate During The Execution Of The Contract That The Equipment And Materials Used By Him Meet The Requirements Specified By The Employer. The Use Of A Label In The Design Documentation Means That The Employer Accepts All Labels Confirming That Given Works, Supplies Or Services Meet Equivalent Requirements Specified By The Employer Labels. If The Economic Operator, For Reasons Beyond Its Control, Cannot Obtain The Label Or Equivalent Label Specified By The Contracting Authority, The Contracting Authority, Within The Time Limit Set By It, Accepts Other Relevant Evidence, In Particular The Manufacturers Technical Documentation, Provided That The Given Economic Operator Proves That The Construction Works , Deliveries Or Services To Be Performed By Him Meet The Requirements Of A Specific Label Or Specific Requirements Indicated By The Ordering Party. The Use In The Project Documentation Of The Requirement To Have A Certificate Issued By A Conformity Assessment Body Or A Test Report Carried Out By This Body As A Means Of Evidence Confirming Compliance With The Requirements Or Features Specified In The Description Of The Subject Of The Contract, Tender Evaluation Criteria Or Contract Performance Conditions Means That The Contracting Authority Also Accepts Certificates Issued By Other Equivalent Conformity Assessment Bodies. The Employer Also Accepts Other Appropriate Means Of Proof, In Particular The Manufacturers Technical Documentation, In The Event That A Given Contractor Has Neither Access To Certificates Or Test Reports Nor The Possibility Of Obtaining Them In A Timely Manner, Unless This Lack Of Access Cannot Be Attributed To A Given Contractor , And Provided That The Given Contractor Proves That The Construction Works, Supplies Or Services Performed By Him Meet The Requirements Or Criteria Set Out In The Description Of The Subject Of The Contract, Tender Evaluation Criteria Or Requirements Related To The Performance Of The Contract. Knnr Indicating The Need To Use Specific Equipment With Specific Parameters During The Execution Of The Order. The Employer Allows The Use Of Other Equipment, Provided That It Ensures The Achievement Of The Assumed Design Parameters And Does Not Cause The Risk Of Non-Compliance Of The Performed Works With The Technical Documentation.4.7. Accessibility Requirements. Design Documentation Referred To In Section 4.5 1) Swz Meets The Requirements For Accessibility For People With Disabilities And Design For All Users In Accordance With The Provisions Of The Construction Law And Executive Regulations To The Extent Required By These Regulations. 4.8. Warranty. The Length Of The Warranty Period For Construction Works And Installed Materials And Devices - Is A Criterion For Evaluating Tenders. The Contracting Authority Defines It For A Period Ranging From 36 Months (Minimum Term) To 60 Months (Maximum Term). The Ordering Party Has Full Rights Under The Warranty For Defects Resulting From The Provisions Of The Civil Code Within The Time Limits Specified Therein - Regardless Of The Warranty Rights. 4.9. Insurance. The Ordering Party Requires Insurance From The Contractor In Accordance With The Conditions Specified By The Ordering Party In § 11 Of The Draft Agreement.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
ddd89b42-d336-407e-a318-033b6b43822b.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders