H henhof Interchange Hub Lot 2C: Covered Trench Under N1 Oa1156 The Works Consist In Particular Of: - Civil Engineering Works (Covered Trench, Partly Prefabricated With Installation By Shifting, Partly Poured In Place); - Road Works; - Network Works (Sanitation, Dry Networks, Drinking Water Pipes, Etc.) Quantity Of Work: - General Excavation From Soils Cl 2 To 5: 9,000 M3 - General Excavation From Soils Cl 6 To 7: 17,000 M3 - Contiguous Embankments: 5,200 M3 - Excavations In Trenches: 1,800 M3 - Bituminous Coatings: 270 To - Drinking Water Pipe Fd Dn 80: 440 M - Disconnector On Drinking Water Network: 1 Piece - Formwork (Ordinary Walls, Neat, ): 3,800 M2 - Quality Concrete For Structures: 1,700 M3 - Passive Reinforcement: 530,000 Kg - Bituminous Waterproofing (Membrane): 775 M2 Overall Work Completion Time:
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.