Asia-Pacific Economic Cooperation, APEC,G20,APAC ( Asia Pacific)
01-06-2023
Work Detail
Weyburn Asphalt Repairs Part 1: Repair Of Watermain Replacement Trench On Duncan Drive Approximately 538 M2. Excavation Of Backfill Material To A Depth Of 75 Mm, Apply Tack Oil To Pavement Edges, Supply And Install 75 Mm Asphalt Overlay. Part 2: Repair Of Watermain Replacement Trench On Railway Avenue Approximately 513 M2. Excavation Of Backfill Material To A Depth Of 75 Mm, Apply Tack Oil To Pavement Edges, Supply And Install 75 Mm Asphalt Overlay. Part 3 And Part 4: 1St Street (Repair Area Is Approximately 293 M2) And 13Th Street (Repair Area Is Approximately 173 M2). Excavation Of Existing Asphalt, Base And Subgrade To A Depth Of 600 Mm. Install Woven Geotextile. Rebuild Base With City Supplied Reclaimed Asphalt (500 Mm Depth), Apply Tack Coat And 100 Mm Overlay Of New Asphalt.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.