GTR 64763737

Tenders Are Invited For Reconstruction Of Sanitary Rooms In The Building Of The Multi-Profile School Complex In Tarnowskie Góry

ICB — International Competitive Bid Closed Central Europe
Tender Information
GTR Reference
64763737
Tendering Authority
Subscribe to view
Tender No
AZ.272.4.10.2023
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Reconstruction Of Sanitary Rooms In The Building Of The Multi-Profile School Complex In Tarnowskie Góry
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
02-06-2023 Closed
Work Detail
1. The Subject Of The Contract Is The Reconstruction Of Sanitary Rooms Of The Multi-Profile School Complex In Tarnowskie Góry Located In Tarnowskie Góry At Ul. Sienkiewicza 6.2. The Scope Of The Subject Of The Contract Includes: 1) Demolition And Bricklaying Related To The Need To Make New Lintels And Ceiling And The Planned New Arrangement Of Rooms, 2) Fire Protection Of Lintel Elements, 3) Construction Of Brick Partition Walls And Gk Buildings, 4) Construction Of Sanitary Cabins System Systems, 5) Plastering And Leveling Gypsum Finishing Coats In The Area Of ​​Walls Within Sanitary Rooms, 6) Under-Tile Waterproofing, 7) Painting Inside Walls And Ceilings With Base Preparation, 8) Wall Facing With Base Preparation, 9) Installation Of Floor Tiles On New Floor Bases, 10) Installation Of New Suspended Ceilings, 11) Installation Of New Internal Door Woodwork, 12) Renovation Of Terrazzo Window Sills By Tiling Them, 13) Replacement And Installation Of Sanitary Utensils (Toilet Bowls, Washbasins, Urinals And Doors To Toilet Cubicles), 14) Reconstruction Of The Mechanical Ventilation System, 15) Reconstruction Of The Electrical Installations, 16) Installation Of New Lighting Fixtures, Connectors And Plug Sockets, 17) Foiling The Windows In The Rooms With Milk Foil, 18) Widening And New Openings In The Existing Structural Walls In The Areas Indicated In The Drawings Places,19) Disassembly Of Colliding Partition Walls Made Of Full Brick And Partitions,20) Disassembly Of Equipment Elements Such As: Panel Installations, Cables, Cabinets, Shelves, Redundant Pipes, Etc.,21) Chipping Off Damaged Plaster, 22) Wiping Remaining Plaster Of Walls And Ceilings Removal Of The Old Paint,23) Cutting Holes For Ventilation Ducts And Sewage Systems In Walls And Ceilings,24) Disassembly Of Floors And Floor Layers,25) Disassembly Of Roof Fans, 26) Disassembly Of Internal Wooden Doors,27) Disassembly Of Radiators, 28) Disassembly Of Fixtures Lighting Fixtures, Connectors And Plug Sockets, 29) Disassembly Of Surface-Mounted Electrical Installation Strips And Conduits, 30) Removal Of Wall Tiles, 31) Disassembly Of Wall Facings And Baseboards, 32) Disassembly Of White Fittings, Sanitary Fittings And Mirrors, 33) Disassembly Of Suspended Ceilings Gk, 34) Renovation And Reconstruction Of The Water And Sewage System, In The Field Of Modernized Sanitary Facilities, 35) Replacement Of Radiators With The Implementation Of Cut-Off And Thermostatic Valves, 36) Implementation Of Electrical Installations, 37) Reconstruction Of Mechanical Ventilation.3. The Detailed Scope Of The Subject Of The Contract, Description Of The Employers Requirements In Terms Of Implementation And Acceptance Are Specified In The Following Documents: 1) Architectural And Construction Design With Land Development Called Renovation And Reconstruction Of Some Sanitary Rooms In The Building Of The Multi-Profile School Complex In Tarnowskie Góry - Appendix No. 5 To Swz; 2) Executive And Technical Design Entitled Renovation And Reconstruction Of Some Sanitary Rooms In The Building Of The Multi-Profile School Complex In Tarnowskie Góry - Appendix No. 6 To Swz; 3) Technical And Executive Design - Structures Called Renovation And Reconstruction Of Some Sanitary Rooms In The Building Of The Multi-Profile School Complex In Tarnowskie Góry - Appendix No. 7 To The Swz; 4) Stwior - Renovation And Reconstruction Of Part Of The Sanitary Rooms In The Building Of The Multi-Profile School Complex In Tarnowskie Góry - Appendix No. 8 To The Swz 5) Decision No. 1388/22 Of October 20, 2022. Approving The Construction Design And Granting A Building Permit - Appendix 9 To The Swz, 6) Bill Of Quantities - Construction Industry - Appendix 10 To The Swz, 7) Bill Of Quantities - Electrical Industry - Appendix 11 To The Swz, 8) Bill Of Quantities - Water Industry -Kan And C.O. - Appendix No. 12 To Swz9) Bill Of Quantities - Mechanical Ventilation Industry - Appendix No. 13 To Swz10) Draft Provisions Of The Contract - Appendix No. 4 To Swz.4. The Required Guarantee And Warranty Period For The Performed Subject Of The Contract Is A Minimum Of 3 Years (In Words: Three Years), Counting From The Date Of Signing By The Employer, The Investors Supervision Inspector (In The Event Of Its Establishment) And The Contractor Of The Fault-Free Final Acceptance Report Of The Works.5. The Ordering Party Requires Employment By The Contractor Or A Subcontractor Under An Employment Contract Within The Meaning Of The Act Of June 26, 1974. The Labor Code (I.E. Journal Of Laws Of 2022, Item 1510, As Amended) In The Scope Of Order Performance Of Persons Performing Activities Included In The So-Called Direct Costs. Thus, This Requirement Applies To Persons Who Perform Activities Directly Related To The Performance Of Works, I.E. The So-Called Manual Workers. The Requirement Does Not Apply To, Among Others, Persons: Construction Site Managers, Works Managers, Geodetic Service Providers, Suppliers Of Building Materials.6. Where In The Construction Design, Detailed Design, Technical Design, Technical Specification For The Execution And Acceptance Of Works, Bills Of Quantities, A Trademark (Brand), Manufacturer, Supplier, Patent, Origin, Source Or Specific Process That Characterizes The Products Or Services Provided By A Specific The Contractor Or Standards, European Technical Assessments, Common Technical Specifications Or Other References Referred To In Art. 101 Section 1 Item 2 Or Section 3 Of The Act, The Ordering Party In Accordance With Art. 99 Sec. 5 Of The Act Allows The Submission Of An Equivalent Offer Or Pursuant To Art. 101 Sec. 4 Of The Act, Offering Equivalent Solutions To Those Indicated In The Documentation, Provided That They Ensure The Achievement Of Technical Parameters Not Worse Than Those Assumed In The Documentation And Are Consistent In Terms Of: 1) Dimensions And Construction (Size, Type, Physical Properties, Number Of Components) ,2) Utility Character (Identity Of Functions), 3) Material Characteristics (Type And Quality Of Materials), 4) Technical Parameters (Strength, Durability, Technical Data, Hydraulic Data, Linear Characteristics, Construction), 5) Safety Parameters Of Use, 6) Emission Standards.7. The Contractor, At Each Request Of The Ordering Party, Is Obliged To Present, In Relation To The Indicated Materials, Safety Marks, A Declaration Of Conformity Or Technical Approval Or A Certificate Of Conformity With The Polish Standard Transposing European Standards Or Equivalent Or The Standard Of The Member States Of The European Economic Area Transposing This Standard Or Equivalent Or Polish Standard Or Equivalent In The Absence Of A Polish Standard Transposing European.8. Whenever The Construction Design, Detailed Design, Technical Specification For The Execution And Acceptance Of Works, Bills Of Quantities Mention Polish Standards, It Should Be Understood As Polish Standards Transposing European Or Equivalent Standards Or Standards Of Other Member States Of The European Economic Area Or Equivalent Or Other Standards Or Documents, Referred To In Art. 101 Sec. 1 Point 2 Of The Act.9. Materials, Equipment And Devices Used To Perform The Contract Should Meet The Quality Requirements Of Products Admitted To Trading And Use In Construction, As Specified In The Act Of 7 July 1994 Construction Law (I.E. Journal Of Laws Of 2023, Item 682 Of As Amended), The Act Of 16 April 2004 On Construction Products (I.E. Journal Of Laws Of 2021, Item 1213) And The Requirements Of The Technical Specification, Performance And Acceptance Of Works And Swz.10. Prior To The Incorporation Of The Materials, The Contractor Shall Submit Their Patterns And Technical Sheets For Approval To The Supervision Inspector And The Employer Confirming The Compliance Of The Technical Parameters With The Construction And Executive Design.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
0a77f5b3-fbc6-4f97-b410-f3045c7b1a6c.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders