Tenders Are Invited For Road Safety Improvement At The Pedestrian Crossing Along Dk11 In Byczyna
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
64589093
Tendering Authority
Subscribe to view
Tender No
O/OP.D-3.2411.22.2023
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Road Safety Improvement At The Pedestrian Crossing Along Dk11 In Byczyna
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
29-05-2023
Closed
Work Detail
The Subject Of The Contract Is: Improvement Of Road Safety At The Pedestrian Crossing Along Dk11 In The City Of Byczyna. The Contract Covers The Implementation Of The Investment Task Consisting In The Installation Of Dedicated Lighting And The Construction Of Induced Traffic Lights At The Pedestrian Crossing Along The Main Route Of The National Road No. 11 At Km 474+ 520-474+580 In Byczyna. As Part Of The Order, The Contractor Is Obliged To: - Reconstruct The Colliding Devices And Networks Of The Existing Underground And Above-Ground Infrastructure: Telecommunication And Energy Devices, Water Supply Networks, Rainwater And Sanitary Sewage Systems, Gas And Heat Networks, Melioration And Hydrological And Others. - Restoration Of The Disturbed Surface, E.G. Pavements During The Execution Of The Task. - Possible Correction Of Curbs Or Possible Replacement Of Damaged Curbs Within The Pedestrian Crossing Area. - Securing And Marking The Place During The Execution Of The Works. - Presenting Preliminary Design Solutions To The Ordering Party, Taking Into Account The Materials Used For Approval. - Preparation Of Design Documentation To Illuminate The Passage For Pedestrians, Along With The Necessary Arrangements. - Preparation Of A Temporary Traffic Organization Design For The Duration Of The Construction And Its Approval By The Traffic Management Authority. It Is Allowed To Use The Approved Traffic Organization For Short-Term Works, After The Employer Has Given Its Consent For A Given Stage Of Works. The Project Is Available At: Https://Www.Gov.Pl/Web/Gddkia-Opole/Zatwiertzoneschematy-Organizator-Ruchu. - Preparation Of Design Documentation For The Activated Traffic Lights. - Adaptation Of The Electricity Consumption Point To Place The Meter With Protection Within Lane Of The National Road No. 11 From The Existing One In The Teachers House At Ul. Poznańska 10A. - Obtaining On Behalf Of The Ordering Party The Necessary Arrangements, Opinions, Decisions And Permits Required For The Proper Performance Of The Task, Including Arrangements With The Managers Of Subordinated Roads. - Preparation Of The Notification And Obtaining A Certificate Of No Grounds For Raising Objections To The Notification Of Construction Works. - Preparation And Notification Of Devices For Supplying Voltage And Start-Up Of Devices. - Implementation Of Works Based On The Development Of Agreed And Approved Executive Designs. - Preparation Of An Inventory As-Built Geodetic Survey (Of The Structure With Its Connection). - Preparation Of As-Built Documentation, Taking Into Account Changes And Corrections Introduced During The Construction Works. - Carrying Out Tests And Inspections Provided For The Above-Mentioned Works. - Electrical And Road Supervision Over The Above Works Will Be Carried Out On Behalf Of Gddkia.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
04c8451a-4d3d-4fcf-978f-a7464386bf08.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.