GTR 64178348
Tenders Are Invited For Improvement Of The Energy Efficiency Of The Building Of The Drawsko Commune Office
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
64178348
Tendering Authority
Subscribe to view
Tender No
GK-ZP.271.7.23
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Improvement Of The Energy Efficiency Of The Building Of The Drawsko Commune Office
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
24-05-2023
Closed
Work Detail
The Scope Of The Subject Of The Contract Includes The Preparation Of Design And Cost Documentation Together With Obtaining The Relevant Permits / Construction Notifications In Order To Carry Out Construction Works Consisting In The Renovation And Thermal Modernization Of The Existing Building Of The Municipal Office - Drawsko At Ul. Powstańców Wlkp. 121 In Drawsko Along With Making A Band Around The Building. In Particular, The Scope Of The Subject Of The Contract Includes All Design Works Including Demolition, Renovation, Conservation, Installation And Finishing Works In The Facility, Along With Obtaining The Opinions, Arrangements And Permits Required By Law, To The Extent Necessary For The Effective Implementation Of The Investment Task, Its Implementation And Acceptance. The Scope Of Construction Works Includes All Works Preparatory, Disassembly And Demolition, Earthwork, Construction And Construction, Renovation, Conservation, Installation And Finishing Works Related To The Renovation Of The Existing Facility. Expected Scope Of Works (To Be Verified At The Stage Of Preparing The Design Documentation): • Preparatory Works: - Preparation Of The Construction Site And Fencing Of The Construction Site, Security And Protective Works. - Insulation Of The External Walls From The Inside Of The Building - Attic, Supplementary Construction Works - Insulation Of The External Wall - (Insulation Based On An Energy Audit Performed By The Contractor) Attic - Attic - Insulation From The Inside. Knee Walls.-Insulation Of The Outer Wall - (Insulation Based On An Energy Audit Performed By The Contractor) Insulation Of The Attic Roof Slopes.-Plaster, Wall Plaster, Painting-Substrates And Floors,-Replacement Of Ceilings In The Attic Offices-Renovation And Adjustment Of Door Woodwork In The Front Façade From Ul. Uprising Wlkp. - Replacement / Renovation And Adjustment Of The External Door Joinery From The Building Yard (2 Pcs.) - Replacement Of Internal Doors - 13 Pcs. - Renovation / Painting Of Internal Doors, - Painting Of Balustrades, Staircase - Execution Of External Vertical Anti-Moisture Insulation + Gravel Band, Accesses-Internal Installations-Water And Sewage Installations, Including The Replacement Of Risers That Are Corroded And Flood The Office Rooms, Replacement Of Sanitary Devices, Renovation Of The Social Room On The First Floor And All Toilets In The Building.-Central Heating Installations Replacement Of Corroded Risers And Radiators - Ventilation And Air-Conditioning Installations, Unblocking Ventilation When Making Facades (Disassembly And Reassembly Of Devices) - Electrical Installations Replacement Of The Entire Installation Of Socket, Lighting, Switchboard Circuits - Teletechnical And Computer Installations - Renovation Of The Building Facade Repair Of External Plaster - Painting Of The Facade And Partial Replacement Of The Feathering • Disassembly And Demolition Works: - Disassembly Of The Electrical System In The Building - Disassembly Of The Existing Woodwork, Including External Door Woodwork Intended For Renovation And Maintenance. - Demolition Of Secondary Divisions And Partition Wall In The Room - Removal Of Degraded Internal Plaster: Office Rooms, Communication). - Removal Of Fragments Of Damaged Plaster In The Facade Of The Building. - Demolition Of The Concrete Band Of The Building - Excavations Related To The Insulation Of The Foundation Walls - Depending On The Choice Of The Form Of Insulation Agreed With The Conservator And In Accordance With The Results Of Soil Tests .• Construction And Construction Works: - Cellar Walls Should Also Be Uncovered And Dried, After Determining The Cause Of Dampness, Vertical And Horizontal Dampproof Insulation Of The Foundation Walls Should Be Selected. Drying The Damp Walls Of The Building. Indication Of A Specific Method And Scope Of Vertical Insulation, - Renovation Of Existing Wooden Stairs (Depending On Conservation And Fire Protection Arrangements, Cleaning And Painting Stairs In Accordance With The Guidelines Or Renovation Of Existing Ones). When Renovating The Staircase, All Elements And Historical Materials Should Be Preserved, And Only To The Extent Necessary, Supplementation Should Be Made. - Insulation Of The Pitched Roof From The Inside In The Space Between The Rafters, - Disassembly Of New Gutters And Downpipes And Reassembly After The Facade Is Completed, Together With Connection To The Rainwater Drainage System (In Accordance With The Current Connection). - Execution Of Insulation, Impregnation And Bio-Protective And Fire-Protective Measures. Finishing Works - Execution Of New Smooth, Historical Plasters On The Façade (In Accordance With The Conservation Guidelines Established During The Design Works, Approved By The Conservation Agreement For Carrying Out The Works). On The Walls Of The Building (The Color Scheme Of The External Gable, Front And Rear Walls Should Be Agreed With The Conservator, And Its Selection Should Be Preceded By Stratigraphic Tests) - Execution Of Internal Plasters, Completion After The Installation, Walls And Ceilings For The Entire Building, Gypsum Plasters Of The Building, Casings Of The Risers Of The Water And Sewage System, Ventilation Made Of Plasterboards. - Replacement Of Sheet Metal, Flashings And Window Sills Made Of Titanium-Zinc Sheet (Colors To Be Agreed With The Conservation Office). • Conservation Works - Other Conservation Works, Which Will Be Necessary At The Implementation Stage. • Works Related To The Development Of The Area Around The Building - Excavations And Earthworks Related To The Execution Of The Band, Insulation, Foundation And Hardened (Permeable) Surfaces,
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
33574b22-19e4-4cbd-95ce-212c25f35681.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.