GTR 64011432

Tenders are invited for Building Of The Zselici Cycling-Tourist Network In Senna

ICB — International Competitive Bid Closed Eastern Europe
Tender Information
GTR Reference
64011432
Tendering Authority
Subscribe to view
Tender No
EKR000020332023
Financer Name
European Union (EU)
Work Title
Tenders are invited for Building Of The Zselici Cycling-Tourist Network In Senna
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Eastern Europe
Political Region
European Union
Last Date of Bid Submission
02-05-2023 Closed
Work Detail
Building Of The Zselici Cycling-Tourist Network In Senna 45000000-7 Building And Associated Parking Lot (Bus, Passenger Cars And Electric Car Chargers) • 200M2 Building • 50 Bicycle Storage And Rental Facilities • Water Blocks With Showers • Service Room, Office, Rest Room, Showroom, Boiler Room, Warehouse The Building Is Fully Accessible Will Be Established. (Building A Barrier-Free Pedestrian Route; Building Barrier-Free Traffic Within Building Parts; Building A Barrier-Free Parking Lot; Appropriate Design Of Barrier-Free Water Blocks; Building An Information And Communication System) The Subject Of The Public Procurement Is Approx. Completed At A Level Of 42.8% Completion, The Implementation Of The Remaining Works Is The Task Of This Procedure, Which Is Detailed In The Document Entitled "Technical Auditors Note For The Performance Of Returnable Tasks" And The Budget. Tasks To Be Completed, Which Were Only Partially Completed Based On On-Site Consultations, Or Were Not Completed Properly: 1. The Already Half-Demolished Barn Building On The Plot Must Be Demolished. The Excavated Material Can Be Sold By The Contractor, The Builder Does Not Ask For It Back. Debris Must Be Removed. The Budget Item Does Not Include This. 2. It Is Necessary To Demolish The Thermal Insulation Of The Plinth Glued With Unsuitable (Eps) Material, Xps Material Must Be Applied Instead According To The Plans 3. The Arched Porch Vb. Pre-Insulation Of The Beams Is Missing - This And The 10 Cm Eps Insulation Must Be Replaced With Graphite Eps Insulation (Lambda=0.03 W/M2k) 4. 2 Right-Angled Connections On The Middle Beam Need To Be Reinforced - 2 Completed 5. Rock Wool Laid On The Reinforced Concrete Slab According To The Plan Instead Of Insulation It Is Requested To Be Built Into The Rafter Plane With A 5/7 Cm Batten Frame Or A 75 Mm Profile (15 Cm Between The Rafters And Pairs Of Grips + 7-7.5 Cm Within The Rafter Plane) The Amount Fixed In The Budget Refers To The Horizontal Surface. 6. An Additional Temporary Internal Door Must Be Installed In The Stairwell On The Lower Step (To Close The Unheated Space) 7. The Full-Width Road Connection Of The Paved Parking Lot Must Be Prepared. These Quantities Are Included In The Budget Items. 8. The Barrier-Free Toilet Wall In The Middle Of The Building Must Be Moved By 50 Cm - And The Partition Wall Of The Boiler House Must Be Built Flush With It. That Is, The Depth Of The Boiler Room Will Also Be Greater At The Expense Of The Reception. 9. The Built-In Chimney Included In The Budget Items Must Be Built In The Place Of The Slab Exclusion In The Corner Of The Barrier-Free Toilet. The Connection And Cleaning Door Of The Chimney Must Be Opened Towards The Mechanical Room. The Builder Wants To Install A Mixed Fuel Boiler In This Place. The Type Of Chimney Is Included In The Budget. 10. The Chimney In The Barrier-Free Toilet And The Mechanical Setups Installed There Must Be Separated By A "Guest Wall" That Must Be Closed At The Height Of The Window Sill. 11. The Gas Boiler Must Be Built With Its Own Independent Flue Gas Exhaust And Air Intake Piped Vertically Above The Roof By Drilling Through The Slab (Drilling Is Not Accepted). The Turbo Pipe Must Be Pulled Into The Air Space Of The Barrier-Free Toilet (Above The Mirror) So That It Does Not Interfere With The 120 Cm Width Of The Stairs In The Attic - It Must Be In The Same Lane As The Built-In Chimney. 12. The Protective Pipes Installed For The Electric Cables Installed In The Ceiling And Floor And Their Patency Must Be Checked. 13. The Upper Wedging Of The Partition Walls Must Be Checked And Replaced In Some Places. 14. Landscaping And Landscaping Must Be Carried Out Based On The Local Conditions. 15. Drinking Water Connection To The Existing Well Is Part Of The Task - The Necessary Pipeline Is Wound Up At The Connection Of The Building.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
7934add7-3808-426e-8074-5151571cfd6b.htm
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders