GTR 64001787

Tenders Are Invited For Reconstruction Of Non-Structural Elements Of The Building Complex Of The Public Primary School No. 2 In Tuszyn.

ICB — International Competitive Bid Closed Central Europe
Tender Information
GTR Reference
64001787
Tendering Authority
Subscribe to view
Tender No
D.2301.04.2023.M.K.
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Reconstruction Of Non-Structural Elements Of The Building Complex Of The Public Primary School No. 2 In Tuszyn.
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
16-05-2023 Closed
Work Detail
1.2 Description Of The Subject Of The Contract Investment Address: 95-080 Tuszyn, Ul. Poniatowskiego 11, Dz. Registration No. 76 Rpm 9 In Tuszyn The Task Is Carried Out On The Basis Of A Construction Design And Certificate Of No Objection To The Intention To Perform Construction Works No. Aib.6743.Zp423.2022.A.S. Of November 22, 2022. The Project Consists In The Reconstruction Of Non-Structural Elements Of The Building Complex Of The Public Primary School No. 2 In Tuszyn. As Part Of The Planned Investment, It Is Planned To Perform All Necessary And Purposeful Works To Complete The Facility Provided For In The Architectural And Construction Design, In Particular, It Includes The Following Works: 1. Execution Of Lighting Along With The Electrical Installation Of Pedestrian Routes In Accordance With The Requirements Of Mds;2. Designation And Marking, In Accordance With The Requirements Of The Accessible School Model And The Law, 2 Parking Spaces For Persons With Disabilities;3. Repair Of The Paved Surface With Cobblestones In The Area Of ​​The Exit To The Parade Ground (Removal Of Paving Slabs From The Parade Ground) With Marking Out A 2.5 M Wide Sidewalk And Removing Thresholds In Accordance With Mds;4. Adaptation Of 3 Entrances To The School Building By Eliminating Doormats, Thresholds, Contrasting Marking Of Glass In Doors In Accordance With Mds Requirements;5. Replacement Of 2 Aluminum Escape Doors (Pavilion D And E) Along With Priming And Painting Twice And Repair Of The Floor In The Place Of Works;6. Adapting The Main Entrance To The School Building By Replacing The Double-Leaf Doors With Single-Leaf Doors (2 Pcs.) In Accordance With The Mds Requirements And Standards, Contrasting Signage In Accordance With The Mds Requirements;7. Renovation In The Area Of ​​The Main Entrance Of The Pavement Paved With Concrete Cubes With Lowering The Curb In Accordance With The Requirements Of Mds;8. Protection Against Injuries Through Covers Of 3 Poles In The Hall;9. Protection Of Elements On Walls Protruding More Than 10 Cm (Assembly Of Plinths/Pipes);10. Liquidation (Demolition) Of Partition Walls On Escape Routes;11. Liquidation (Demolition) Of The Pillars On The Escape Route, Superstructure Of The Stairs, Assembly Of The Platform By The Stairs To The Canteen, Power Supply To The Platform, Purchase And Assembly Of The Platform With A Straight Track, Level Difference Of 72 Cm (Pavilion A);12. Liquidation (Demolition) Of The Ramp And A Fragment Of The Platform In The Hall, Extension Of Stairs, Assembly Of The Platform At The Stairs In The Hall (For Si And Revalidation Rooms), Power Supply To The Platform, Purchase And Assembly Of A Platform With A Straight Track, Level Difference Of 52 Cm (Pavilion G); 13. Adjusting The Balustrades And Handrail To The Requirements Of The Mds, Disassembly Of One Handrail In The Main Staircase, Assembly Of An Intermediate Balustrade And Replacement Of Balustrades At The Stairs To The Gym, Assembly Of Handrails At The Pedagogues Room, The Si Room And The Canteen Stairs;14. Replacement Of Doors In The Cloakroom - 1 Item (Pavilion G);15. Replacement Of Doors Along With Widening The Opening In 2 Classrooms - 2 Pcs. (Pavilion E);16. Widening Of Two Door Openings And Replacement Of 1 Door On The Access Route To The Gym (Pavilion B+F);17. Replacement Of The Door To The Corridor To Room No. 4 And Room Si, To Room No. 4, 11 And Si - 4 Pcs. (Pavilion G);18. Replacement Of The Door And Removal Of The Threshold In The School Canteen (Pavilion A);19. Lowering The Level Of The Issuing Counter To A Height Of 90 Cm In The School Canteen;20. Replacement Of Doors From The Common Room To The Quiet Work Room And From The Corridor To The Quiet Work Room - 2 Pcs. (Pavilion B+F);21. Replacement Of Doors With All Necessary Finishing Works;22. Adaptation Of Sanitary Rooms To The Needs Of People With Disabilities In Accordance With The Requirements Of Mds (Pavilion E And G) In Terms Of Separating Sanitary Rooms For The Needs Of People With Disabilities In Accordance With Mds Guidelines (Renovation Of Sanitary Rooms With The Displacement Of Partitions, Reconstruction Of Sanitary And Electrical Installations, Replacement Of Sanitary Fittings And Wall And Floor Cladding, Installation Of Accessories And Barrier-Free Handrails For Ozn Purposes). Implementation Of The Subject Of The Order (Hereinafter Referred To As The Schedule). The Detailed Schedule Must Specify The Date Of Completion Of The Contract In Question And Include A Division Into Three Stages With An Indication Of The Scope Of Works In A Given Stage And Their Value. The Ordering Party Shall Pay The Contractor Remuneration In Tranches. The Payment Of Two Tranches Of Remuneration Will Take Place Each Time After The Completion Of The Separate Installments In Accordance With The Above. Division Of The Scope Of Works (Phases I And Ii, Respectively) As Part Of The Implementation Of The Subject Of The Contract, And The Payment Of The Third Tranche Will Take Place After The Completion Of The Contract. The Amount Of Payments Of The Contractors Remuneration Tranches May Not Exceed The Value Of The Works Actually Performed In The Tranches. The Contractor Has The Right To Refer To The Program From The Date On Which It Was Approved. A Change To The Schedule That Does Not Entail A Change In The Date Of Completion Of The Works Is Not A Significant Change And Requires Only A Written Acceptance Of The Submitted Schedule By The Employer. . 1.3. A Detailed Description Of The Subject Of The Contract Is Included In The Design Documentation (Architectural And Construction Design) And In The Technical Specification For The Execution And Acceptance Of Construction Works And The Bill Of Quantities, Which, As A Supplement To The Description Of The Subject Of The Contract, Are An Integral Part Of The Contract Documentation. Works Not Included In The Design Documentation Should Be Included In The Offer Cost Estimate .1.4 The Contractor Is Obliged To Perform The Subject Of The Contract In Accordance With The Principles Of Technical Knowledge And Applicable Regulations And Standards. In Addition, For The Performance Of The Contract, The Following Activities And Works Should Be Taken Into Account, As Well As The Related Costs:
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
e02f95f8-a5b1-49b1-9ba4-8af619c29720.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.