Technical Concept And Study Plans - Dbr. The Contracting Authority Wishes To Establish A Dynamic Procurement System (Hereinafter: Dbr) For The Purpose Of Preparing Concept Plans And Study Plans For The Reconstructions Necessary To Prepare For The Further Extension Of The Operating Time Of The Paks Nuclear Power Plant (Paksi Atomer m ) Operated By The Contracting Authority Mvm Paksi Atomer m Zrt. The Paks Nuclear Power Plant Is A Vver440/213 Type Nuclear Power Plant. The Contracting Authority Wishes To Divide The Dbr Into The Following 3 Categories: 1. Preparation Of Concept Plans For Equipment-Level Reconstructions And Repair Interventions 2. Conceptual Design Of System-Level Reconstructions 3. Preparation Of Concept Plan And Study Plan For Electrical And Control Technical Changes During The Implementation Of Specific Public Procurements Within The Framework Of The Dbr, The Contracting Authority Shall Comply With The Kbt. On The Basis Of 107, Paragraph (2), The Exact Technical Description And Contractual Conditions For The Specific Public Procurements To Be Implemented In The System Shall Be Made Available To The Economic Operators Participating In The Dbr At The Same Time As The Invitation To Tender Is Sent. The Planned Total Duration Of The Dbrs Existence: 60 Months The Contracting Authority Defines The Duration Of The Dbr In Accordance With Kbt. On The Basis Of Section 107, Paragraph (9), You Can Change It By Publishing An Announcement Specified In A Separate Law. The Planned Magnitude Of The Dbr: For The Entire Period (60 Months): After The Technical Questions To Be Answered Have Arisen, The Contracting Authority Decides On Ordering The Creation Of A Concept Plan And/Or A Study Plan. The Expected Number Of Tasks During This Period In The 3 Categories Together: Approx. 15 Technical Concepts And/Or Study Plans, However, The Contracting Authority May Deviate From This In Both Directions, Depending On The Emerging Needs. General Performance Requirements For All Three Categories: During The Implementation Of Individual Public Procurements, The Economic Operator Who Contracts As The Winning Tenderer Must Compile The Documentation It Creates In Accordance With The Requirements Contained In The Following Regulations: 1. Nuclear Safety Regulations And Relevant Guidelines (Annex 4 Of Oah Decree 1/2022 (Iv.29)) 2. Relevant Hungarian And International Standards 3. Mvm Paksi Atomerom Zrt Abos Dk Abos Differentiated Requirements: Szab_Bizt_M01_V06 4. General Design Documents: 4.1. 000097A00021 Ebac Normative Management 4.2. 000097A00016 Ebah Design Quality Management System 4.3. 000097G00045 Ebad Content And Form Requirements Of The Documentation Establishing The Start Of Production And Procurement, Assembly And Operation Of Transformation, Mechanical Engineering 4.4. 000097V0003 Eb Ah Content And Form Requirements Of Licensing Documentation, Control Technology And Electrical Field 4.5. 000097A00018 Ebaf Concept Plan Content And Form Requirements 4.6. 000097E00007 Ebae Content And Form Requirements Of Design Documentation, Architecture And Supporting Structures 4.7. 000097G00044 Ebag Content And Form Requirements Of Design Documentation, Mechanical Engineering 4.8. 000097V00002 Ebak Content And Form Requirements Of Design Documentation, Control Technology And Electrical Field After Registration, The Contracting Authority Makes The Above Documentation Available At The Following Internet Address: Https://Atomeromubeszallitooidal.Mvm.Hu/Login?Returnurl=%2F
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.