GTR 63943733
Tenders Are Invited For Thermomodernization Of A Multi-Family Residential Building Located In Tomaszów Mazowiecki At Ul. Stolarska 9.
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
63943733
Tendering Authority
Subscribe to view
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Thermomodernization Of A Multi-Family Residential Building Located In Tomaszów Mazowiecki At Ul. Stolarska 9.
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
12-05-2023
Closed
Work Detail
1) Thermal Modernization Of The Building, In Accordance With The Attached Audit And Construction Design, Including: A) Thermal Modernization Of The Walls Of The Basement Of The Residential Building, B) Thermal Modernization Of The Walls Below The Ground Level Of The Residential Building, C) Waterproofing Of The Basement Walls, D) Complete Renovation Of The Balcony Slabs In Accordance With With The Construction Design, E) Performing The Necessary Flashings Resulting From The Thickening Of The Walls - Flashings Combined With A Standing Seam, F) Replacement Of Downpipes - Coated Steel, G) Disassembly Of Canopies Over The Balconies Of The Top Floor And Over Vestibules - Construction Of Canopies For Recovery, H) Assembly Canopies After Thermal Modernization Of The Walls, After Earlier Refreshing Of The Structure And Replacement Of The Cellular Boards With Polycarbonate Boards, Thickness. 16Mm - Transparent Color, I) Works Related To The Erection Of Intercom Cassettes To The Finished Façade Of The Vestibule, J) Facade Cladding Made Of Tiles On The Pedestal And Front Wall Of The Vestibule, K) Execution Of A Paving Strip On A Sand And Cement Bedding Around The Building With A 2% Slope From Of The Building, L) Bringing The Gutters And Downpipes On The Vestibules Forward And Replacing Them, M) Painting All Steel Elements On The Façade And Balconies, 2) Thermomodernization Of The Ceiling Above The Last Floor: A) Thermomodernization Of The Ceiling Of The Last Floor, B) Thermal Modernization Of The Roof Slope ( Bevels Located In The Premises), C) Disassembly Of The Existing Skylight Windows, D) Disassembly Of Window Reveals Made Of Plasterboards At The Roof Windows, E) Restoration Of Window Reveals From The Inside. After Replacing The Window, F) Disassembly Of The Metal Roof Tile Covering In The Area Of The Roof Window, G) Installation Of New Pvc Roof Windows, 3-Pane, Pivoting With An Automatic V35 Air Ventilator, Uw Coefficient For The Entire Window 1.1 W/M2k And 0.7 W/M2k For The Glass, Toughened Outer Pane, Glazing Unit U4 (4Ht-10-4H-10-4Ht), H) Installation Of New Sealing Flashings, I) Supplementing The Missing Wooden Elements Of The Roof Slope Structure Necessary For Proper Installation Of The Roof Window, J) Supplementing The Initial Foil Covering, K) Reconstruction Of The Roof Covering, L) New Flashings On The Connection Between The Window And The Roof Slope, 3) Installation Of A 4.96 Kw Photovoltaic Installation, In Accordance With The Audit And Construction Design, Obtaining And Submitting All Necessary Documents To The Energy Plant Related To The Replacement Energy Meter With A Two-Way Meter, 4) Replacement Of Lighting Fixtures With Energy-Saving Ones In Common Areas, A) Dusk Luminaires In Staircases With A Motion Sensor, B) Twilight Luminaires Outside The Staircases With A Motion Sensor, C) Twilight Luminaires For Parking Lighting Mounted On The Facade Of The Building 5) Replacement Of Pvc Window Frames And Aluminum Entrance Doors To The Building: A) Installed Windows Should Be Made Of A Lead-Free Profile In White On Both Sides And Standard Fittings B) Each Window Should Have A Triple Glazing Unit And The Heat Transfer Coefficient For The Entire Window U(Max) = 0.9 W/M2k, C) Delivery And Installation Of A Hygroscopic Ventilator In The Window Sash - As A Rule, One Ventilator Per Room And Every Third Window In The Basement, D) Each Window Should Be Equipped With A Handle, Drainage Holes Covers And Hinge Masks, E) The Listed Windows Must Correspond In Appearance And Divisions To The Existing Windows, F) A Double-Leaf Window Must Consist Of One Casement Sash And The Other One With A Turn And Tilt Sash, G) In The Case Of A Single-Sash Window, A Tilt And Turn Sash Is Used, H) Aluminum Entrance Doors To The Building In The Color Ral 3002, I) Heat Transfer Coefficient For The Door U(Max) = 1.3 W/M2k, J) Door Joinery Made Of Warm Aluminum Profile, K) Door Leaf Made Of 55Mm Thick, L) Door Should Be Equipped With Door Handle, Bands, Threshold, Foot And Door Closer, M) Doors Equipped With An Electromagnetic Lock Enabling The Door To Be Opened Using The Existing Intercom, N) The Existing Intercom System Should Be Connected To The New Door Along With Its Synchronization, O) The Floor And Equipment In The Premises Should Be Secured Against Works Related To The Replacement Of Woodwork, P) The Dismantled Window And Door Woodwork Should Be Disposed Of, Q) The Plasters In The Internal Jambs Should Be Supplemented, R) It Is Planned To Wipe The Existing Plaster In The Internal Jambs, S) The Jambs Should Be Painted Twice With White Emulsion Paint.6) In Addition, The Scope Works Include: A) Disposal Of Waste Generated After The Works, B) Installation, In The Indicated Place And At Own Expense, Of An Electrical Switchboard With A Measuring Point And A Water Intake With A Measuring Point.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
e81a1b20-771b-450c-93e8-40464ea28c61.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.